Forwards IE Bulletin 75-04B, Cable Fire at Browns Ferry Nuclear Power Station. Action Required
ML20037B396
Person / Time
Site: Dresden, Quad Cities, Zion  Constellation icon.png
Issue date: 11/03/1975
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 8009250525
Download: ML20037B396 (1)


Text

.

l h

UNITED STATES NUCLEAR REGULATORY COMMISSION REGloN 111 799 ROOSEVELT RO AD GLEN ELLYN. ILLINO15 60137 Novc=ber 3, 1975 Consnonwealth Edison Company Docket No. 50-10 ATTN Mr. Byron Lee, Jr.

Docket No. 50-237 Vice President Docket No. 50-249 F.O. Box 767 Docket No. 50-254 Chicago, T114nnis Docket No. 50-265 Docket No. 50-295 Gentlemen:

Docket No. 50-304 Enclosed is IE Bulletin No.75-04B which requires action by you with regard to your power reacter facilities with oper-at$ag licensea.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely yours, James G. Keppler Regional Director

Enclosure:

IE Bulletin No. 75-043 Approved by GAO, B-180225 (R0072), clearance expires 7-31-77.

Approval was given under a blanket clearance specifically for identified generic problems.

I cc v/ encl.:

B. Stephenson, Station Superintendent N. Kalivianakis, Station Superintendent J. Bitel, Plant Superietendent bec v/enl:

IE Central Files E Files

?DL

'cecl ?;I 4

C G C, I::'t., 7 - 5 ;61.

J. :r. r-7.::

.r..

Er;.,

1.:te r c e'-

8009250 f2 E

b November 3,1975 IE Bulletin No.75-04B CABLE FIRE AT BROWNS FERRI NUCLEAR P0tJER STATION The review by the NRC of the consequences of the fire at the Browns Ferry Nuclear Power Station is continuing.

Reports of fire protection l

inspections performed by groups or organizations other than the NRC and actions taken or planned by licensees as a result of these other fire protection inspections will be of particular value in this continuing review of the status of operating plants and determination of any actions which may be appropriate.

ACTIONS TO BE TAKEN BY LICENSEES:

1.

If fire protection inspections (other than those performed b'y NRC) have bepn made at your licensed operating facilities since March 22, 1975, please forward to this office, within 30 days:

A copy of all reports or any other documentation relating.

a.

to the fire protection inspections, dates of inspections and by whom performed.

b.

A description of any actions taken or planned - showing dates for actions - as a Yewult of findings or recommen-dations from the fire protection inspections, or if appro-priate, your position relative to the results of the-inspections performed.

2.

If no fire protection inspections (other than those performed by NRC) have been performed at your licensed operating facilities since March 22, 1975, please forward to this office:

a.

Within 15 days, your plans and schedules for the performance of fire protection inspections at your licensed operating facilities within the next year.

b.

Within 30 days following completion of each of the inspections planned (Item 2a, sbove), (1) a copy of all reports or other documentation relating to each fire protection inspection, dates of inspections and by whom perfor=ed, and (2) o description of actions taken or planned - showing dates for actions - as a result of findings or reco=mendations from the inspections, or if appropriate, your position relative -

to the results of the inspections performed.

3.

Provide directly to the Director, Division of. Reactor Inspection Progra=s, NRC, Washington, D.C. 20555, a copy of all information submitted in response to this Bulletin.-

[ N Y h h [.

.