Forwards IE Bulletin 77-05A, Electrical Connector Assemblies. Action Required
ML20037B296
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 11/16/1977
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 8009100970
Download: ML20037B296 (1)


Text

C i...

'CENTRACFIL" s

c tiOV 161977' Docket No h, 50-237, 50-249, 50-254, 50-265, 50-295, 50-304, 50-373, 50-374,40-454, 50-455, 50-456, 50-457 Con:conwealth Edison Company l

ATTE:

Mr. Byron Lee, Jr.

t Vice President P. O. Eox 767 Chicago, IL 60690

}

Centlemen:

Enclosed is a supplement (Ir Bulletin No.77-05A) to IE Bulletin Fo. 77-05 which requires action by you with regard to your power reactor facilitica with an operating license or a construction i

permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely.

Jaces C. Keppler Director l

Enclosures:

1.

IE Bulletin No.77-05A i

2.

IE List of Bulletins Issued in 1977 cc w/encis:

Mr. 2. E. Stephenson, Nr. R. Cosaro, Project Station Superintendent Superintendent Mr. N. Kalivianakis, Central Files Station Superintendent Reproduction Unit NRC 20b Mr. h. Wandke, Station PDR Superintendent Local PDR j

Mr. L. J. Eurke, Site RSIC Project Superintendent TIC I

Pr. Cur.nar Sorensen, Site Anthony Roisman, Tsq.,

Froject Superintendent Attorney pp p

,80091007'/O (P

Mm n

e51 h L

/

,f' e=s-

-(

. ~.

rie: R,is M..ca::

Fler

.s....s L...

I1/16/77 h1C FOW Su (9.N! hT CN 0240

  • m8.80VE**"8"?"*"'**"'"'"******

l'f t

=

November 16, 1977 IE Bu13etin 77-05A ELECTRICAL CONNECTOR ASS &_3 LIES Description of Circumstances:

This Bu11etin is a supplecent to IE Bulletin 77-05, issued November 8, 1977, and the two documents should be considered to; ether.

Bu11etin 77-05 described the failure, under test conditions, of a general type of c ectrical connector. The tests were intended to simulate post-1D*A conditions, therefore the action requested in the Bu11etin focussed on the qualification of electrical connectors for use inside containment.

Since issuance of Bulletin 77-05, our attention has been called to circuestances which indicate that the scope of the action requested should be expanded and therefore the response to Bulletin 77-05 should reflect the expanded scope.

Electrical connectors should be qualified to perform their intended function after having been subjected to accident conditions if they are contained in a systen vhese function is to ritigate that accident.

The location of the cc nectors that must be qualified is not limited to these inside containr.ent.

Action To Be Taken By Licensees and Fernit Bolders:

1.

Actions requested by Bulletin 77-05 should be expanded to include all connectors in safety systems which are required to fuoetion to mitigate an accident where the accident itself could adversely affect the ability of the systen to perfon its safety function.

The exacination is not to be limited to only LO*A's nor to areas only within containment.

2.

Responses should be provided within 30 or 60 days, as appropriate, of the date of this supplement.

Approved by GAO, B180225 (R0072); clearance expires 7-31-80. Approval was given under a blanket clearance specifically for identified generic problems.

/

Lytt a

14 9 "M M M q w 5 y,

4

,q

~

II Bu11 etic 77-05A Korenher 16, 1977 LISTING OF TE BULLETINS ISSUED IN 1977 Bu11etin Subject Date Issued Issued To No.

d 77-05 Electrical Connector 11/8/77 All Pk'E Power Assemblies Keactor Tacilities with an Operating license (01.) or Construction Temit (CP) 77-04 Calculational Error 11/4/77 All Pk'R Power Affecting the Design Reactor Facilities Ferformance of a System with an Operating for Controlling pH of License (OL) or Containc.ent Su:p Water Construction Folleving a LOCA Ternit (CP) 77-03 On-Line Testing of 9/12/77 All W Tower the v Solid State Eeactor Tacilities Trote etion System with an Operating License (OL) or construction Pernit'(CP) 77-02 Totential Tailure 9/12/77 All Holders of Mechanism in Certain Operating Licenses W AR Relays with (OL) or Construc-i Eelays with Latch tion Ferr.its (CP)