ML20037B175
| ML20037B175 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/20/1977 |
| From: | Desiree Davis Office of Nuclear Reactor Regulation |
| To: | Bolger R COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8009080551 | |
| Download: ML20037B175 (3) | |
Text
.-
i.
DISTRIBUTION
' l)ocket 3 BHarless
.NRC PDR DEisenbut Local PDR ACRS (16)
.;.c:n... c-U SEP 2 01977 ORB #2 Reading OPA - Clare Miles VStello Dross KRGoll.er/TJCarter TBAbernathy
.x.
Corcervealth Edison Company RMDiggs JRBuchanan-ATT!:: :ir. R. L. Dolcor a
Assistant Vice President rest Office Cox 7t,7 OELD Chicago, Illinois. 6060 OI&E (5)
BJones (4) bC'tI " "*
BScharf (10)
The Cor.r.ission has issued tne enclosed Amendenk N. 21 to' Facility c
Occreting License !!o. DPR-2 for Dresden huclear Power Station Unit Un. 1.
The aaendaent consists of charges to the Technical Speciff-cations in response to your application dated April 11,1977, as suppler.ented by filings dated flay 23, Aunust 3, and Septet:ber ti and 15, 1977.
=i The anendment (1) authorizes operation of Dresden Unit No.1 uith additicnal 6 x 6 fuel assenblies as replaceent for existing fue) asse"tilies, (2) incorporates revised i'CilFR linits that assure conservative operation with respect to thernal tydraulics during cycle 11, and (3) incorporates new MAPLHfa linits to assure that the reactor is operated so as to centinue to coet the ECCS per-for ance criteria.
Dresden Unit No.1 is currently operating under an exe ption "frea the reevirencnts of and underlying 10 CFR 50,M with respect to the cesign diversity of emergency power sources, but not fron the specific perforaance recuirements of the FAC." This exemption expires December 31, 1~77.
Ccronwealth Edison has requested a one year extension of tne exc~ption.
It should be noted that this artene.ent coes not authorize
/
7 operation of Dresden Unit No.1 beyonti the present exemption expiration date of Decciber 31, 1977.
\\,k Copies of the related Safety Evaluation and totice of Issucnce also
/
i kp h are onclosed.
".sA.Y Sincerely,
~
Original signed by
'f.
~) /
~
,,.5iivs,Itin h,C ]* /M 7
ief Opernting Rea:. tors Branch r2
- NOTE: SEE PREVIOUS YELLOW FOR uivisi n of Operating Reactor (
D CONCURRENCES.
?' $ 5 nt w. al te ghpo y NTT1ittr2D VRef-r
[
D0R.:AD/D(_
j.g k DOR: AD/.OR_.
DOR:0k#2OELD sawccM' k.*.
. e EA u.t..
D'M1s U J3R.Gql.le r es ue*
$O l
l wa*
v60 FCJZ 3h (G?C) 'GCM C 40 T.T u. s. aovs n=as twv...=mo or ric a. e,ve - es ps
-??M*?$5l
Commonwealth Edison Company September 20, 1977 cc w/ enclosures:
Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. B. B. Si.ephenson Plant Superictendent Cresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 Chief, Energy Systems Analyses Branch.(AW-459)
Office of Radiation Programs U. S. Environnental Protection Agency Room 645, East Tower 401 M Street, S. W.
Washington, D. C.
20460
- d. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN:
EIS COORDINATOR 230 South Dearborn Street Chicago, Illinois 60604 Mr. William Waters Chairman, Board of Supervisors of Grundy County.
Gru.idy County Courthouse Morris, Illinois 60450 cc w/ enclosures ~and CECO filings dtd. 5/23/77, 8/3/77, and 9/8 and 15/77:
Department of Public Health I
ATTN: Chief, Division of Radiological Health 535 West Jefferson Springfield, Illinois 62706 w
L
~,.,
f,,. x f C 'ad St.h%
,I 4
iT
/*
Uff tTED STATES
~
{,.
r.UCt. EAR nWU'.ATOT/ CC:T.MslOM
].,
.ZH!..G ; ; 4, D. C. M :..'.,
t
.. /
/C-
-[
% <... =,6~
/
l' Occket i:o. S0-10 f.
vL,,
i fy
" +......
Cc= onwealth Edison Conpany ATTit:
Mr. R. L. Bolger Assistant Vice President Pos: Office Box 767 Chicago, Illinois 60590
=
Gentlemen:
Operating License flo. CPR-2 fcr Dresden liuclear P
\\
b No. 1.
cations in response to your application dated AprilThe ame E
.y
=
supplemented by filings dated May 23, August 3, and September 8 and.
D~
11,1977, as 15, 1977.
F
- ~
The amendment (1) authorizes operation of Dresden Unit rio.1 with additional 6 x 6 fuel assemblies as replacement for existing fuel:
assemblies, (2) incorporates revised MCHFR limits that hsur-e
.t.:.;
. M, Cycle 11, and (3) incorporates new MAPLHGR limits to formance criteria.the reactor is operated so as to continue to meet the ECCS
(~
i scopies of the related Safety Evaluation and Hotice of I also are enciesed.
ssuance
=:
Sincerely, Don K. Davis, Acting Chief 1
Operating Reactors Branch #2 Division of Operating Reactors
Enclosures:
1.
Mendment I!o. 21 to P,,
License !!o. DPR-2
'Dusde~ LQ. t{ 6 tw P T- @,
i 2.
Sar~ y Evaluation 4; u g,
g
,q
~
g,.
ic CS R 5Da% u iH. r u p d b b cbs W~ N n t'jd cc w/ enclosures:
See next page r<qw; gew n,w ; k Jut f,w 4byu.I*
t 4N '"7 O c, C 44,. O
,b..<p % w 4 4 py,",T(4 cm,.K.,Ag~ai{n.~ M,dD.
~_ J:( EE..- L. 3 spubs c m pc ~h m... 90 k.a m.;&.
(h5 cleL1 0U LLm.puh.....l-w t
,,, w -cd *A iEA w & a u. 8 h..~ %
w~ % A
.te--L.M w am-~ w., %elaa.n..npJ.~,t.lce;;.~.+.~~u e
5
% 4<; - H a-a-w w :!
L 4 p.m.--
- n. %cx.h pu w~ m m -
-