ML20037B170

From kanterella
Jump to navigation Jump to search
Discusses Util 770527 Response & 780411 Supplemental Info to NRC 770407 Request for Info Re Diesel Generator Status Annunciator Sys.Lists Conditions Which Could Result from Routine Testing or Maint & Which Require Alarms
ML20037B170
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/18/1978
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Reed C
COMMONWEALTH EDISON CO.
References
TASK-08-02, TASK-8-2, TASK-RR NUDOCS 8009080544
Download: ML20037B170 (3)


Text

\\

(

=

\\

Cocket ilos(Eb)0-237

~

and 50-249 APR 18 1978 Commonwealth Edison Company ATTH: Mr. Cordell Reed 4

Assistant Vice President -

Post Office Box 767

~

~ ' ~ ~ ~

Chicago, Illinois 60690

[,",, _ ~

~

~~

Gentlemen:

By letter dated April 7,1977, you were rer..ested to provide information t

about the status annunciator system. fo.r, the, diesel generators at your facilities. We have reviewed.your response dated.May.27,,1977, and have obtained supplemental information in an April ll,197,8 ' telephone con-versation between Mr. M. 5. Turbak of your,sta.ff and Paul W. 0'Connor of Operating Reactors Branch j2,, Division of Operating Rea,ctors, NRC.

p The supplemental information [c'onfirmed,t, hat:,,,,,

1.

The Dresden Unit No.1 st'a'rt push button and control switch are spring loaded and return 'td the. [D/G,'a'dtdm'atid-start-not-blocked

~

position, 2.

Dresden Unit Nos.1, 2 and,3 do not.have.a manual shutdown lockout relay, and 3.

The diesel generator con 6ol switch is located in the control room visible to the operator avid is s'prin'g Toaded,'to return to a D/G automatic-start-not-blocked lpositi on.,,,, _

f Based Upon our review of your'subnittal and the supplemental information provided, we have concluded that CommdriweaTth Edison (CECO) should pro-

~~

vide alams for the following, conditions whic'h'CECd has confirmed can res0lt from nomal routine periodi,c testing or mainten,ance:

V s/

~ ~ ~ ~ " * ' ' ~

~

8009080 6#[4[

-l l

o g

Comonwealth Edison Company APR 15 ii;s 1.

Manual air shut off valve placed in thd closed position, 2.

Bus tie breaker between the D/G and its emergency bus placed in the Test position, and 3.

Improper D/G governor droop setting.

Please provide within 30 days a comitment to install alams that h

clearly indicate that the diesel generator automatic start is blocked.

IJ

!L Sincerely.

cri-inf. 6 ::d M

~ Dennis L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors cc:

See next page DISTRIBUTION Dcckets 50-10/237/249 i.

NRC PDRs 50-10/237/249 Local PDRs 50-10/237/249 I

ORB #2 Reading P0'Connor RBevan WButler DLZiemann VStello Birimes OELD OI&E(3)

HSmith DEisenhut TJCarter TBAbernathy JRBuchanan ACRS (16)

DDavis l

t DOR:0RB #2 P DOR:0R 2

DOR:PSB/S&P (

B *2 c.

R s

o

>c = +

.RBeva

.WButler) p P0'Connor:rj temann oaea *

..._1..

GC FGut.418 (9 76) NRCM 0240 W un s. oovenmurwt pa Nviwo orrects tote - eas-sa4 i

Commonwealth Edison Company pyg CC Mr. John W. Rowe Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603

=

Mr. B. B. Stephenson

=:

Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 Anthony Z.-Roisman Natural Resources Defense Council 917 15th Street, N. W.

Washington, D. C.

20005 Morris Public Library 604 Liberty Street Morris, Illinois 60451 e

J