ML20037B042

From kanterella
Jump to navigation Jump to search
Forwards Draft Model Tech Specs for Guidance in Preparation of Proposed Tech Specs.Draft Tech Specs Will Require Mod to Incorporate Plant Specific Info.W/O Encl
ML20037B042
Person / Time
Site: Dresden, Quad Cities  
Issue date: 05/07/1976
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Bolger R
COMMONWEALTH EDISON CO.
References
NUDOCS 8009030745
Download: ML20037B042 (2)


Text

. _.

~

s DISTRILUITON NRC PDR (5)

VStello i

Local PDR (2)

JCollins n ~ CT; f>oket TVerdery m

ORB #2 Reaidna 6

Cochet W. O-10 @ 7/249 KRGoller 50-254/:.65 JCarter OELD - Swanson, Bruen OISE (3)

DL2iemann Co:ronecalth Edison Coripeny WEh em ATT:i:

Mr. R. L. Boleer RDSilver Assistant Vice President PW0'Connor Post Office Box 767 RMDiggs (2)

Chicago, Illinois 60690 DEisenhut TBAbernathy Centlenen:

JRbuchanan ACRS Q6)

FE:

DREEDEF ;ELEAR POWER STATION, UNIT Nob. 1/z /.3 Qi:AD CITIES f:UCLEAR POER STATIO::, UdIT NCS. 1/2 In our letter to you of February,1976, providing guidance on implementing the requirements of Appendix I to 10 CFR Part 50, we indicated that the staf f was preparing additional guidance regarding the fore:ulation of Technical Specifications to i=plement Section V.E.2 of Appendix I.

In this regard we have attached duidance on the preparation of your proposed Technical Specifications.

It should be noted that these draft Technical Specifications will reouire rodifica-tion to incorporate plant specific information. Additionc11y, due to the draft nature of these Technical Specifications there are certcin areas which have already been identified by the stef f for further study and possible codification. These areas are listed in the " Forward" to the attached "Draf t Model Technical Specifications".

We would be pleased to meet with you after the June 4, 1976 submittal date to discuss your methods of evaluation to show conformance with Appendix I and your proposed Technical Specifications for the purpose of keeping r-leases of radioactive naterials in effluents as low as reasonably achievable.

Sincerely, i

Pennis L. Ziemsnn, Chief Operating Reactore Franch s2 Division of Operating Recctors q L

Enclosure:

I Draft Medcl Technical Specifications

/

for Boiling i'accr Ecact7rs

,M 64 ye v +v g

OR:CRB S.

_ QRHEB # 2

.0R:0RB #2 '

' 20J3 *3 OR:0E3 =2,

o,,,c..

N t.

57

'WECenebrse:aa RD5ilver TKO'Ccnner EVcrd e rv DL2ierann 5/ 6 / 76 l5/]/76 g-5/] / 76 l 5[( /76 5/n /76 m

/

> -- uu,.'...m.uc e n.-----

~ ~"-

8 0 0 9'O 30 7p'f

Concenwealth Edison Company,y cc w/cnclosure:

!b. Charles Whitmore President and Chairman Iowa-Illinois Gas and Electric Company 206 East Second Avenue Davenp,o rt, Iowa 52801 M.r. John W. Rowe I sh am, Lincoln 6 Beale Counselors at Law One First National Pla:a, 42nd Floor Chicago, Illinois 60603 Anthony Z. Roisman, Esquire Roisman, Kessler and Cashdan 1712 N Street, N. W.

Washington, D. C.

20036 Moline Public Library 504 - 17th Street Moline, Illinois 61265 liorris Pub]ic 1.ibrary 604 Liberty Street Morris, Illinois 60451