ML20037A791
| ML20037A791 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/25/1967 |
| From: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Stilson C FLORIDA, STATE OF |
| References | |
| NUDOCS 8004070522 | |
| Download: ML20037A791 (1) | |
Text
n: ;
Distribution:
AEC Document Room
%g Formal g
Suppl DRL R ading AUS 2 51367 Rps 3 Reading g
Orig: FWKaras Docket Nos.53-302' R. S. Boyd and 50-303 T. Fr Engelhardt, OGC T
t
=
colonel Charles W. Stilson Executive Director Florida Nuclear and Space Commission 725 South Bronough Street Tallahassee, Florida 323G4 Daar Colonel Stilson:
=
This is to inform you that Florida Power Corporation, St. Petersburg,
~T T1orida, has submitted an application for construction pomits and 1.1
~
operating licenses for two pressurized water nuclear reactors desig-nated as Crystal River Units 3 & 4 N xlear Canerating riant. The proposed facilities will be located on the Corporation's site on the Culf of flexico, 70 seiles north of Tampa and about 7-1/2 miles north-vest of Crystal River, Citrus County, Florida.
The proposed reactors are each designed for initial operation at approximately 2452 megawatts thernst with a gross electrical output of approxbsately 855 megawatts.
The applicant anticipates the two facilities will be coxpleted and ready for consercial service in April 1972 and in 1974, respectively.
A copy of a reisted notice 61ch has been forwarded to t'he Of fice of the Federal Eagis*.cr for tiling and publication it enclosed for your internation.
Sinecrely yours, Original signed by II. Stoelo
- S*t#'
- 8 * '#"t D L*## t' #
d D IP #R A
9 W'y q Di i i D
0 for 14ertor projects
,1J I
WM M
v s on of Reactor Licensing g
cncicture:
es stated tbow l
"W* ser:rer--Olev"e -D.--tirri--d:~4-DRL/RP - - --
it<
SURN4ME >
N.$SS.k.d1..
D ATE, >
..l.
8/24/67 litrin Al'C.31% (iter. 9-?J?
us G%tawtst raisT:sc ortict :ie+0 2ta e.s g
8004070 f M
/"/