ML20037A581
| ML20037A581 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Cooper, Crystal River, Crane |
| Issue date: | 10/21/1977 |
| From: | Goller K Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003160014 | |
| Download: ML20037A581 (2) | |
Text
L%4A.J
+
o T
1 "E
s4 3
s,
OCT 211977 L/
I l
MEMORANC'JM FOR: Karl R. Coller, Assistant Director for Operating Reactors, 00R
[
FRO?l:
Carrell G. Eisenhut, Assistant Director for Operational Technology, DOR
~
i
SUBJECT:
BlW OVERPRESSURE HITIGATING SYSTEM V
PLANT !WtES: Arkansas 1; Crystal River 3; Oconee 1,2,3; Rancho Seco; Three Mjle Island 1 DOCKET NOS.:
50-298,( 302g 269, 270, 287, 312, 289 RESPONSIBLE BPANCH ANT 720 JECT iWiAGERS: ORSfl. OR3f2, OR3f4 R. Snaider, C. Nelson, D. Neighbors, L. Olshan, G. hetzig OPERATI!1G TECHNOLOGY BRANCH Iff!OLVED:
Reactor Safaty REVIEli STATUS:
Continuing The Reactor Safety Branch has completed preliminary review of the over-pressura citigating systea on opt ating 31:1 reactors and has found that the critar4 cstablished by the NRC ara not fully tet.
The NRC critaria are satisfied fcr all the transients postulated with the exception of an inadvertent safcty inJcction with failure of the single 1cw set point PCRV which results in villation Of Appendix G pressurc-tamperaturo limits prior to the ti=e hban operatw action is allowed. Although a pressuri::er bubble is availabis as b.c.kup, operator acticn is required prior to 10 ainutes for this limiting nass addition transient.
to inform them of the situation and requqst further action on the problem Enclosed is a letter to be transmitted to all operating SMd ifcensees l
,y
\\
Davis Besse 1 is different feca reactors listed atova and shoi3d na*
receive the letter,
'N
)
DN L.
, 1,.,
N
.o
~, : -
Carrell G. Eisen!'ut, Assistant Directot, i i
i for Operational Technology i.., j Division of Operating P.eactors
\\
A EHelosure:
As stated
\\x N
cc:
(See Ne7.t Page)
- 3
.3[
%. m....
~-
,, _ a _
f 8003160014 f
- ~
7 m
V K
4 0
O 2-Karl Goller i
a cc:
V. Stallo i
R. Sact i
T. fiovak D. Ziecann R. Cudlin J. Gulbert D. Davis I
R. neid G. Lear R. Snaider
^
l C. fielson D. Neighbors i
L. 01shan G. Cwetzig C. Berlinger F. Cain",an S. '.h i s s T. Farhh J. Essenthal C. t'!bart G. Zech C. Gnikt DISTRIBUTIC?i Central FiTis RS Rdg.
Glanik Rdg.
OEi s enhut i
I.
I l
t r
li
,,,,,,, ' DOR:RSx$_._DCR:RV.'g./3DCR:Rb[# DChfl00T f
y f
w Glanif:ct C3erlincer R3aer T DEf echut 10/
i/77 10/ /T /77 10/ [ /77 e.....*
.10//Y /77 _
catt e W u. e. novsames m reimmie cresca sete - eum NRC FCRM 313 (9 76) NRCM 0240 1
m