_

0 DI)IRIBUTION:

4D6ckets (2) thR 2-3 Rdg IAPeltii

+

a9 FEB 1 t 1974 ASchweni:

Docket Nos. " -270

'oo

'q-}'

~~

'and 50-287 Op b

k.

3 Richard Vollrcr, Chief, Quality Assurance Branch, Licensing OO[EEE 2 AND 3 QLIALITY ASSUPEG During the Oconee 2/3 review, ca March 27, 1973, by Ictter we requested that Dale Power Coquny su! cit the Oconee Quality Assurance Progra c.;>

k for Operatica per Section 50.34(6)(6)(ii) and /gpendix B of 10 CFR 50.

?,

J Safety Guide No. 33 (Regulatory Guide 1.33) " Quality Assurance Program?

t Requires:nt s (Option)," issued Nove:ber 3,1972 FIwided guidelines S for establishing an adequate program. Dule Pwer Conpany responded by/

~

letter transnittal en April 27, 1973.

  1. .j ^

In our July 6,1973 Safety Evaluation Rcport we stated, "Ihe staff ha(,~.

I concluded that the program is adequate but is still reviewin; this' program 1

and will resolve any creas that require upgrading prior to cperation of Oconce Unit 2".

., s

[

01 July 11, 1973, by letter, we requested additional inforration fnun +

Duke Power Coc:part on the Occeee QA (Operatica) Program because we were 4:

i aware that Duke ns taking I:casures to strengthen its QA Program on al N cocpany wide effort. Q1 July 31, 1973, by Ictter transmittal, n an, 4 i

responded to the July 11, 1973 request.

ggjgg 7 l

and the purpose ~ofC Oconee Unit 3 is scheduled to load fuci May 20, 1974 m.m.

this,rxmn is to reconfirm that the Oconec QA (Operation) Program is i > X adequat-for Unit 3 in view of any new information we may Imve receiinkF since Oconee Unit 2 was licensed 0:tober 6, 1973. Itiscerunderstandidg that an approved Q', (Cperation) Program is required 90 days. prior toe % d' licensing (rcquiral by February 20,1974). Therefore, uc sinild close#'

e the loop on this itca for the record. Picase respond by February 20,,197,4.;'

,.~f 0 %; < ;.

orWnal Signed C X S.

~..

T

'A. Schwencer, m icf

'NM: ~

~'i l'

Light Ihter Reactors Br. 2-3 MSt

~"

Directorate of Licensing V

i

  1. i ~

i cc:

V. Moore i

D. Eisenhut v

t F. Liederbach

" C h ac LKR' L- _LIC

-3 A

o,ne s,

l 8 0 U~ l14oO[_

g.1 g/.

~'

l

......,.IAPelt

.)caf AS encer___

..,s 2/ / F /7.4 2/_LE_/74 f._. j

~

y}

r.,. ac.m m.Sm um me a "- ' = ~ ~ = ~ ~

[

(