ML20037A418
| ML20037A418 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/12/1974 |
| From: | Schwencer A US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Vollmer R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001140813 | |
| Download: ML20037A418 (1) | |
Text
_
0 DI)IRIBUTION:
4D6ckets (2) thR 2-3 Rdg IAPeltii
+
a9 FEB 1 t 1974 ASchweni:
Docket Nos. " -270
'oo
'q-}'
~~
'and 50-287 Op b
k.
3 Richard Vollrcr, Chief, Quality Assurance Branch, Licensing OO[EEE 2 AND 3 QLIALITY ASSUPEG During the Oconee 2/3 review, ca March 27, 1973, by Ictter we requested that Dale Power Coquny su! cit the Oconee Quality Assurance Progra c.;>
k for Operatica per Section 50.34(6)(6)(ii) and /gpendix B of 10 CFR 50.
?,
J Safety Guide No. 33 (Regulatory Guide 1.33) " Quality Assurance Program?
t Requires:nt s (Option)," issued Nove:ber 3,1972 FIwided guidelines S for establishing an adequate program. Dule Pwer Conpany responded by/
~
letter transnittal en April 27, 1973.
- .j ^
In our July 6,1973 Safety Evaluation Rcport we stated, "Ihe staff ha(,~.
I concluded that the program is adequate but is still reviewin; this' program 1
and will resolve any creas that require upgrading prior to cperation of Oconce Unit 2".
- ., s
[
01 July 11, 1973, by letter, we requested additional inforration fnun +
Duke Power Coc:part on the Occeee QA (Operatica) Program because we were 4:
i aware that Duke ns taking I:casures to strengthen its QA Program on al N cocpany wide effort. Q1 July 31, 1973, by Ictter transmittal, n an, 4 i
responded to the July 11, 1973 request.
ggjgg 7 l
and the purpose ~ofC Oconee Unit 3 is scheduled to load fuci May 20, 1974 m.m.
this,rxmn is to reconfirm that the Oconec QA (Operation) Program is i > X adequat-for Unit 3 in view of any new information we may Imve receiinkF since Oconee Unit 2 was licensed 0:tober 6, 1973. Itiscerunderstandidg that an approved Q', (Cperation) Program is required 90 days. prior toe % d' licensing (rcquiral by February 20,1974). Therefore, uc sinild close#'
e the loop on this itca for the record. Picase respond by February 20,,197,4.;'
,.~f 0 %; < ;.
orWnal Signed C X S.
~..
T
'A. Schwencer, m icf
'NM: ~
~'i l'
Light Ihter Reactors Br. 2-3 MSt
~"
Directorate of Licensing V
i
- i ~
i cc:
V. Moore i
D. Eisenhut v
t F. Liederbach
" C h ac LKR' L- _LIC
-3 A
o,ne s,
l 8 0 U~ l14oO[_
g.1 g/.
~'
l
......,.IAPelt
.)caf AS encer___
..,s 2/ / F /7.4 2/_LE_/74 f._. j
~
y}
r.,. ac.m m.Sm um me a "- ' = ~ ~ = ~ ~
[
(