ML20037A403
| ML20037A403 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/05/1973 |
| From: | Dicker G US ATOMIC ENERGY COMMISSION (AEC) |
| To: | US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001140779 | |
| Download: ML20037A403 (1) | |
Text
EW RON DISTRIBUTION:
Docket Files (ENVIRON)
./
GKDicker Docket Nos.'"50-270 and 50-287
,g73 0 P 0) wJi i
~9~}
~'
Joseph Gallo 1C' Office nf the Cencral Councel I
ADDENDIM TO TIIE OCONEE ES The Addendu:2 to the Oconee FES has been revised in accordance with your coa =mts of May 31, 1973. A copy of the revised addendum is enclosed. The changes that were made are noted in red. The marked up draft you returned on May 31 is also enclosed for cocparison.
Oconee 2 and 3 are on the July ACRS schedule siOe Oconeo 2 is estimated to be ready to load fuel on August 30, 1973.
The Addendu s cost be to the Board by June 18, 1973, to be censidered at the July meeting. Considering the time required for revisions, printing, noticing in the Federal Register, transmittal to other agencies and the Board, etc.,' your corrents are requested on an expedited basis.
Originz ~ :!gned by fi Groienhuis Cordon K. Dicker, Chief Environmental Projects Branch 2 Directorate of Licensing Enclosuress 1.
Addendum to the Oconee FES 2.
Marked Up Draft of Addendum ec:
- 1. J. Clark, L:EP-2 T. Engelhardt, GGC ornct >
,,L:EP-2 2 L:EP-2
$URNAME>
.h.1M.T
..D.p.k
,j.g.ghp,}
Q
-n ont $ 61.51.7.3...........kl2..l.l.3 V__
pe en-to-msH unis rwu AEC-3:s (Rp.9-53) AECM CHO