Text
-
,
..
,
th
pp( 2 81993
f
.
Docket Nos.: 50-325 and 50-324
License Nos.: DPR-71 and DPR-62
Carolina Power and Light Company
ATTN: Mr. R. A. Anderson
Vice President
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
Gentlemen:
SUBJECT:
,
(NRC INSPECTION REPORT N05. 50-325/93-19 AND 50-324/93-19)
This refers to the inspection conducted by Richard L. Prevatte of this office
on April 3 - 30, 1993. The inspection included a review of activities
authorized for your Brunswick facility. At the conclusion of the inspection,
!
the findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted' of selective examinations of procedures
and representative records, interviews with personnel and observation of
activities in progress.
'
The report concludes that the preparations for plant startup and the approach
to criticality were conducted in a professional and safety conscious manner.
Good command and control was exhibited with minimal distractions to the
operators.
Based on the results of this inspection, certain of your act'vities regarding
improper clearance tags appeared to be in violation of NRC requirements, as
specified in the enclosed Notice of Violation (Notice). The violation is of
concern because it is similar to a violation contained in the Notice sent to
you by our letter dated August 25, 1992.
Recurring violations are of
particular concern because the NRC expects licensees to learn from their past
failures and to take effective corrective actions. Although NRC does not
,
'
normally consider monetary civil penalties for Severity Level IV violations,
the Enforcement Policy states that such penalties may be imposed for Severity
Level IV violations that are similar to previous violations for which the
licensee did not take effective corrective action.
In this case, we have
decided not to hold an enforcement conference nor to propose a civil penalty
- because of the low safety significance of the specific event.
In your
response to the enclosed Notice, you should document the specific actions
taken and any additional actions you plan to prevent recurrence. We will
review your response, including your proposed corrective actions, and the
results of future inspections to determine whether further NRC enforcement
.
action is necessary to ensure compliance with NRC regulatory requirements.
9306160000 930528
\\\\
ADOCK 05000324
G
1
-
,
,
'
MAY 2 81993
,
Carolina Power and Light Company
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signed by:
Jon R. Johnson /for
Ellis W. Herschoff, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
Mr. H. W. Habermeycr, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
-
P. O. Box 1551
- Mail OHS 7
Raleigh, NC 27602
J. M. Brown
Plant Manager Unit 1
Brunswick Steam Electric Plant
P. O. Box IC4?9
Southport, NC 28461
C. C. Warren
Plant Manager Unit 2
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
Mr. Mark S. Calvert
Associate General Counsel
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
(cc w/encls cont'd - See page 3)
.
'
..
4
4
MAY 2 8 Lo93
Carolina Power and Light Company
3
(cc w/encls cont'd)
Kelly Holden
Board of Commissioners
P. O. Box 249
Bolivia, NC 28422
Dayne H. Brown, Director
'
Division of Radiation Protection
N. C. Department of Environment,
'
Health & Natural Resources
P. O. Box 27687
Raleigh, NC 27611-7687
H.- A. Cole
Special Deputy Attorney General
State of North Carolina
P. O. Box 629
Raleigh, NC 27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. O. Box 29520
Raleigh, NC 27626-0520
Ms. Gayle B. Nichols
Staff Counsel
SC Public Service Commission
P. O. Box 11649
Columbia, SC 29211
bcc w/encls:
Document Control Desk
H. Christensen, RII
S. Vias,.RII
P. Milano, NRR
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Star Route 1, Box 208
Southport, NC 28461
RII:DR
rip
RII:DRP
RII:EICS
RI :DRP
9h
HCh istensen:tj
HShy/
DVerrelli
GJenkins
J) hnson
05/4 793
05
/93
05/ /93
05/ /93
/ 22/ 93
R L w WeA. Ce uw "c e
,,
,
-.
r
.'
.
.,
Carolina Power and Light Company
3
MAY 2 81993
(cc w/encls cont'd)
Kelly Holden
Board-of Comissioners
P. O. Box 249
Bolivia, NC 28422
Dayne H. Brown, Director
Division of Radiation Protection
M. C. Department of Environment,
Health & Natural Resources
P. O. Box 27687
Raleigh, NC 27611-7687
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. O. Box 629
Raleigh, NC 27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. O. Box 29520
Raleigh, NC 27626-0520
Hs. Gayle B. Nichols
Staff Counsel
SC Public Service Commission
P. O. Box 11649
Columbia, SC 29211
bec w/encls:
Document Control Desk
'H. Christensen, RII
S. Vias, RII
P. Milano, NRR
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Star Route I, Box 208
Southport, NC 28461
RII:DR,P
RI :DRP
RII:EIC
RII:DRP
r
DV rrelT N GIin
ns
'JJohnson
HC Fistensen:tjg
05/M/93
.
05/u/93
05/jf/93
05/ /93
h;025
k sw
W l'o