Provides Response to NRC Bulletin 93-002, Debris Plugging of Emergency Core Cooling Suction Strainers
ML20036C109
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/10/1993
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-93-002, IEB-93-2, NUDOCS 9306140080
Download: ML20036C109 (2)


Text

.

k

  • , h _c s

4 Southem Califomia Edison Company 23 PARKER STREET GRVINE CAL.lFORNIA 92718 WALT E R C MARSH T EL FPHONE ALYS T ANT MA4ACd F1 (7641454 4403 NtEtt Asi FiE GUL A' DAY AF F Ai45 June 10, 1993 1

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.

20555 Gentlemen:

Subject:

Response to NRC Bulletin No. 93-02, " Debris Plugging of. Emergency Core Cooling Suction Strainers" NRC Bulletin 93-02 requested licensees to identify fibrous air filters or other temporary sources of fibrous material, not designed to withstand a loss of coolant accident (LOCA), which are installed or stored in the primary containment. As stated in the bulletin, these materials could cause plugging of the Emergency Core Cooling System (ECCS) suction strainers during the recirculation phase of a LOCA.

The purpose of this letter is to provide Southern California Edison's (SCE) written response for the San Onofre Nuclear Generating Station as requested by the bulletin.

SCE has reviewed its administrative processes associated with the control of loose debris in containment (Technical Specifications, procedures, and sarveillance records) and the design of containment ventilation systems for susceptibility to the problem described in the bulletin. We have concluded from this review that San Onofre Units 2 and 3 do not have fibrous air filters or other temporary sources of fibrous material installed or stored in containment during Modes 1 through 4 that would cause plugging of the ECCS suction strainers during a LOCA.

San Onofre Unit I has been permanently shutdown and defueled. As such, the Unit 1 ECCS will not be required to be operable in the future and NRC Bulletin 93-02 is not considered applicable to Unit 1.

If you have any questions or require additional information, please contact me.

Very truly yours, APl 1

9306140080 930610 7

$DR ADOCK0500g6 01 0

k....

Document Control Desk.

cc:

J. B. Martin, Regional Administrator, NRC Region V S. W. Brown, NRC Project Manager, San Onofre Unit 1 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 C. W. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 R. F. Dudley, Section Chief, Non-Power, Decommissioning, and Environmental Project, Directorate of Reactor Projects 3, 4 and 5 State of California SS.

County of Orange 5

By:

8 8.

Walter C. Marsh Assistant Manager, Nuclear Regulatory Affairs S