MAY 2 01993

Docket No. 50-309

Mr. Charles D. Frizzle

President

Maine Yankee Atomic Power Company

83 Edison Drive

Augusta, Maine 04336

Dear Mr. Frizzle:

i

SUBJECT: INSPECTION REPORT NO. 50-309/93-04

This letter refers to the safety inspection conducted by Mr. A. L. Della Greca of this office

on February 15-19, 1993, at the plant site in Wiscasset, Maine. Mr. Della Greca discussed

the inspection findings with Messrs. D. Whittier and G. M. Leitch and other members of

your staff on February 19, 1993. The results of our in-office review of the identified

discrepancies pertaining to the dynamic head developed by the low pressure system injection

and containment spray pumps were discussed or 4

8,1983, with Mr. C. R. Shaw of

your staff.

The inspection was directed toward areas important to public health and safety. The areas

examined are described in the NRC Region I Inspection Report that is enclosed with this

letter. Within these areas, the inspection consisted of selective examinations of procedures,

representative records, interviews with personnel, and observations by the inspector.

i

We found that your staff had not adequately documented the necessary reviews for the

differences between the actual total dynamic head (TDH) and TDH derived from the

manufacturer's curves, for the containment spray and the low pressure safety injection

system pumps. This item will be reviewed during a future NRC inspection.

A review of your design modification program showed good control. Also good were the

steps taken to address the weaknesses in engineering design basis evaluations, despite the

minor discrepancies identified in this area. Additionally, our inspectors reviewed the

corrective actions for five previously identified issues. One issue was closed and the other

four issues required additional information for resolution.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

OFFICIAL RECORD COPY A:MY9304. INS

9305270113 930520

PDR

ADDCK 05000309

i

f

l

}

U

I

MAY 2 01993

>

.

.

.

Mr. Charles D. Frizzle

2

Your cooperation with us in this matter is appreciated.

Sincerely,

t

Original Signed BY:

<

F. K. Ecpcn

y

Jacque P. Durr,b

Chief

Engineering Branch

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-309/93-04

cc w/ encl:

G. Leitch, Vice President, Operations

P. L. Anderson, Project Manager (Yankee Atomic Electric Company)

R. W. Blackmore, Plant Manager

J. A. Ritsher, Attorney (Ropes and Gray)

P. Dostie, State Nuclear Safety Inspector

Peter Brann, Assistant Attorney General

U. Vanags, Maine State Planning Office

C. Brinkman, Combustion Engineering, Inc.

First Selectmen of Wiscasset

Maine State Planning Officer

Public Document Room (PDR)

I.ocal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

State of Maine, SLO Designee

OFFICIAL RECORD COPY A:MY9304. INS

i

i

-

,

1

.

.

Mr. Charles D. Frizzle

3

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/enci (VIA E-MAIL):

V. McCree, OEDO

E. Trottier, LPM, NRR

W. Butler, NRR

!

1

i

b

RI:DRS

RI:DRS

RIMS

Della Greca

Ru

Dah

039 #93

9

05/$/93

OFFICIAL RECORD COPY A:MY9304. INS

l

l

J