Forwards Insp Rept 50-309/93-07 on 930323-0427.Violation of ODCM Requirements Noted,Will Not Be Subj to EA Because Licensee Identified & Promptly Corrected It
ML20036B695
Person / Time
Site: Maine Yankee
Issue date: 05/21/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Frizzle C
Maine Yankee
Shared Package
ML20036B696 List:
References
NUDOCS 9305270095
Download: ML20036B695 (3)


See also: IR 05000309/1993007

Text

_

. _ .

__

. _ _ . ..

.

.

. _ _ _ _ _ -

_

d

'

.

,

f

.

?'nY 2 r 1993

,

Docket No. 50-309

Mr. C. D. Frizzle

President

Maine Yankee Atomic Power Company

83 Edison Drive

Augusta, Maine 04336

Dear Mr. Frizzle:

SUBJECT: INSPECTION NO. 50-309/93-07

This transmits the March 23 through April 27,1993, inspection findings of Messrs.

C. Marschall and W. Olsen at the Maine Yankee Atomic Power Plant, Wiscasset, Maine.

Those findings were based on observations of activities, interviews, and document reviews,

and have been discussed with Mr. Blackmore of your staff.

During the inspection, we noted safe plant operation and maintenance. Especially noteworthy

l

was the plant staff response to the increasing steam generator primary to secondary leak rate.

The root cause evaluation for the AK-25 circuit breaker problem was thorough and indicated

excellent engineering department investigation. However, inadequate post-maintenance

system turn-over resulted in isolation of tha steam generator blowdown system radiation

monitor. This violation of the Offsite Dose Calculation Manual requirements will not be

subject to enforcement action because you identified and promptly corrected it and met the

other criteria of the enforcement policy in 10 CFR Fart 2, Appendix C,Section VII.B.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

Thank you for your cooperation.

Sincerely,

Odgin! StacJ Dy;

James C. Linville, Chief

Projects Branch No. 3

q

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report 50-309/934)7

{

l

)\\

I

9305270095 930522

OFRCIAL RECORD COPY

DR

ADOCK 0500

9

.

____m

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _

_ _ _ . - - _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ . _ _ . - . . . _ . _ _ _ _ - _

-..____.___________._._.-_.___--___J

,

.

.

.

MAY 2 7 993

,

.

,

Mr. C. D. Frizzle

2

cc w/ encl:

)

G. Ixitch, Vice President, Operations

,

P. L. Anderson, Project Manager (Yankee Atomic Electric Company)

R. W. Blackmore, Plant Manager

l

J. A. Ritsher, Attorney (Ropes and Gray)

l

P. Dostie, State Nuclear Safety Inspector

i

Peter Brann, Assistant Attorney General

U. Vanags, Maine State Planning Office

f

C. Brinkman, Combustion Engineering, Inc.

'

First Selectmen of Wiscasset

Maine State Planning Officer

!

Public Document Room (PDR)

.

Local Public Document Room (LPDR)

,

Nuclear Safety Information Center (NSIC)

l

K. Abraham, PAO (2 copies)

NRC Resident Inspector

i

State of Maine, SLO Designee

i

I

.

i

f

.

,

>

>

>

i

.

OFFICIAL RECORD COPY

i

__ _

- - -

__

_

.

.

. .

E

}

_

MAY 2 ? ?393

,

e

.

Mr. C. D. Frizzle

3

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/enci (VIA E-MAIL):

V. McCree, OEDO

E. Trottier, LPM, NRR

W. Butler, NRR

.

l

RI-

RI:DRP

RI:D '

RI:D

Olse

M

s1

5/17/93

3 %D

[ 7#43

fJ 77

OFFICIAL RECORD COPY

A:MY9307.MEO

_

_