,e May 6,1993 ONION Eucnue
'3 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-2802
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILTIY OPERAUNG LICENSE NPF-30 MONTHLY OPERATING REPORT APRTL 1993 The enclosed Monthly Operating Report for April,1993 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
/
f W. R. Campbell yk Manager, Callaway Plant N
Y Tlw brL WRC/DE 1/ TAM /JBM/ crc Enclosure cc: Distribution attached P
1f W o e n.
')[
9305180292 930 W
~
[#1 I
PDR ADOCK 05000483 R
e
- b cc distribution for ULNRC-2802 with enclosurn Mr. I. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission RegionIll 799 Roosevelt Road Glen Ellyn,IL 60137 Mr. L. R. Wharton (2 copies)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 1155 Rockville, MD 20852 NRC Resident inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360 Jefferson City, MO 65102 l
)
i
i e-l i
PART C t
AVERAGE DAILY UNIT PO%IR LEVEL DOCKET NO 50-483 I
UNIT - Callaway Unit 1 DATE ' 5-06-93 COMPLETED BY J. D. McIm ale i
TELEPHONE 314/676-8247 MONT10 APRIL 1993 i
i AVERAGE DAILY PO%IR LEVEL AVERAGE DAILY POWER LE\\TL i
i f
DAY (MWe-Net)
DAY (MWe-Net) e-I il74 17 577 i
2 1173 18 774 3
1172 19 1147 4
1172 20 1162 i
5 1170 21 1165 i
6 1168 22 1162 l
7 1139 23 1152 8
319 24 1148 9
538 25 1158 10 1085 26 1157 11 1160 27 1151
+
12 1171 28 1153 j
13 1167 29 1151 14 1165 30 1152 l
15 1169 31 16 1141 Page 2 of 4
4
?
DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 5-06-93 COMPLETED BY J. B. Mcimale TELEPHONE 314/676-8247 I
PART A OPERATIONS SUMAMRY The plant operated at approximately 100% power for the entire month with the following execptions:
On 4-07-93 load was reduced to 30% to repair feedwater heater tube leaks and facilitate steam generator chemistry control (i.e., Na clean-up). Full power operation resumed on 4-09-93.
On 4-16-93 load was reduced to 48% to repair feedwater heater tube leaks. Full power operation resumed on 4-18-93.
PART B -
PORV AND SAFETY VALVE
SUMMARY
None i
i s
l f
i i
I Page1of4 l
t J'
PART D i
OPERATING DATA REPORT DOCKET NO. 50-483 l
UNIT NAhE CALLAWAY UNIT 1 DATE 5-06-93 COMPLETED BY J. B. McInvale l
TELEPHONE 314/676-8247 j
f OPERATING STATUS (YTD)
(CUM) i 1.
REPORTING PERJOD: APRIL 1993 GROSS IIOURS IN REPORTING PERIOD:
719 2879 73,284.5 l
2 CURREN11.Y AlJFIIORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACI1Y (MWe-Net): 1120 l
DESIGN ELECTRICAL RATINO (MWe-Net): 1171 3.
POWER LEVELTO WillCII RESTRICTED (If ANY)(MWe Net):
4.
REASONS 1OR RESTRICTION (IF AhT):
t Til!S MONTil YR TO DATE CtM'LATIVE 5.
NUMBER OF llOURS REACTOR WAS CRITICAL 719.0 2.879.0 64,256.7 i
6.
REACTOR RESERVE SilUTDOWN llOURh 0
0 0
7.
IlOURS GENERATOR ON LINE 7190 2.879.0 62,934.7 t
8.
UNIT RESERVE SilUTDOWN llOURS....
0 0
0 1
9.
GROSS TIIERMAL ENERGY GENERATED (MWII)~
2.371,166 9.981.377 211,061,327 10.
GROSS ELECTRICAL ENERGY GENERATED (M%11).
812.951 3,455,225 72.017,121 11.
NFT EllrTRICAL ENERGY GENERATED (MWII) 773,845 3.299,084 68,473,182 12.
REACTOR SERVICE FACTOR.
100.0 100.0 87.7 h
13.
REACTOR AVAILABI111Y FACTOR 100.0 100.0 87.7 14.
UhTT SERVICE FACTOR 100.0 100.0 85.9 15.
UNIT AVAILABIlfrY TACTOR 100.0 100.0 85.9 16.
UNIT CAPACITY FACTOR (Unng MDC)--
96.1 102.3 83.4 17.
UNIT CAPACITY FACTOR (Using Design MWe).._
91.9 97.9 79.8 18 UNIT TORCED OUTAGE RATT :
0.0 0.0 2.7 19.
SIIUTDOWNS SCIIEDUIID OVER NEXT 6 MONTilS (TYPE, DATE AND DURATION OF EACil): Refueling; Date: 100193 DuraAc 56 days i
20 IF Sl?t rr DOWN AT END OF REPORITNG PERIOD, ESTIMA1T. DA E OF STAR 1UP.
i t
i l
r Page 3 of 4 i
i
eg PARTE
('
UNIT SIIUTIX)WNS AND POWER REDUCT10NS t
DOCKET NO.
30 4tt3 UNIT NAME.
CAILAWAY UNIT I DATE 5-06-93 COMPLETED BY L IL McInvale TELEPIlONE 314'676-w247 REPORT Kf0NTit: APRIL 1993 METiiOD OF TYPE StIUTTING DOWN F: IURCED DURATION T1tE REACTOR OR No.
DATE 5, SCliEDUlfD (HOURS)
REASON REDUCING POWER CORRECTIVF/ ACTION & COMMENTS I
4-7-93 5
0 B
t on 4-7-93 load was reduced to agyroximately 30'6 for repair of km presure Feedwater heater tubes and to facilitate steam generator chemistry cetrol (i e., Na clean-up). Full power creration resumed on 4-9-93.
2 4 16-93 S
0 B
1 On 4-16-93 load was reduced to agyroximately 48*4 for repair oflow precure Feedwater heater tubes. Futi power operatim reauned em 418 93.
SUMMARY
l-I REASON METilOD A: EQUIPMENT FAltliRE(EXPLAIN) 1: MANUAL B: MAINT.ORTEST
' 2: MANUALSCRAM C: REFUELING 3: AUTOMATICSCRAM D: REGULATURY RESTRICTION 4: OTIIER(E.TIAIN)
\\
E: OPERATORTRAINING AND UCENSE EXAMINATION F: ADMINISTRA110N G: OPERATIONAL ERROR (EXPLAIN)
IL OTilER(EXPLAIN)
Page 4 of 4