ML20036A921
| ML20036A921 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/27/1993 |
| From: | Marshall W FLORIDA POWER CORP. |
| To: | |
| References | |
| AR-302, NUDOCS 9305170258 | |
| Download: ML20036A921 (65) | |
Text
{{#Wiki_filter:.-.. DOCUMENT TRANSMITTAL. FORM 90477 FOR DOCUMENTS TRANSMITTED TO DC DESK (NRC)
- DATE:.28 Apr 1993 BATCH:
9304 DOCUMENT NUMBER SHEET NUMBER REVISION NUMBER. COPY NUMBER AR 302 13 24 INSTRUCTIONS TO THE ADDRESSEE COMPLETE EACH OF THE INSTRUCTIONS BELOW WHICH ARE MARKED WITH AN " X " _X_ (1) VERIFY THE DOCUMENTS RECEIVED AGREE WITH THE ABOVE DESCRIPTION _X_ (2) INCORPORATE THE TRANSMITTED DOCUMENTS INTO YOUR FILES _X_ (3) DESTROY. DOCUMENTS OR PORTIONS OF DOCUMENTS SUPERSEDED BY THE ABOVE _X_ (4) SIGN AND DATE IN THE SPACES BELOW INDICATING THAT YOU COMPLETED THESE INSTRUCTIONS. (5) SIGN BELOW INDICATING THAT YOU HAVE READ AND UNDERSTOOD THE CHANGES AS IDENTIFIED - - (6) RETURN TO DOCUMENT CONTROL, CRYSTAL RIVER UNIT 3, MAC# NA1C X NR2A P SA1G FLORIDA POWER CORP., P.O. BOX 219 CRYSTAL RIVER FLA. 32623 (7) QUALITY PROGRAMS PERSONNEL HAVE READ AND UNDERSTOOD THE ~ CHANGES TO THE AFFECTED QAP'S SIGNATURE OF ADDRESSEE DATE INDEPENDENT VERIFICATION DATE (OPS) 140130 1 9305170258 930427- ^ PDR ADCCK 05000302 F PDR
~' ; x. s ~.' y .Rev. 13 04/23/93 4f1N93 Effective Dcte p.er. m m m m a r r a-m g m,my, Lm~ E-j ,'j p c.g p ,i s;r~.3 syi
- e
. m i .t { i_! I ' p I, c E#5LIC55*4NLk d1.ML~.-%: n.,,,6 a,,,v._:_;Q gg. y;y;y.,g,,j, . f t ANNUNCIATOR RESPONSE AR-302 t FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l I ESB ANNUNCIATOR RESPONSE [ i THIS PROCEDURE ADDRESSES SAFETY RELATED CONPONENTS 5 k i i l t j + i l APPROVED BY: Interpretation Contact i DATE: 47 3 // 4 INTERPRETATION CONTACT: Manager, Nuclear Plant Operations j i 4
s r TABLE OF CONTENTS SECTION PAEE 1.0 PURPOSE............................ I I
2.0 REFERENCES
2.1 IMPLEMENTING REFERENCES............... 1 2.2 DEVELOPMENTAL REFERENCES 1 3.0 PERSONNEL INDOCTRINATION 1 4.0 INSTRUCTIONS 1 5.0 FOLLOW-UP ACTIONS....................... 1 ENCLOSURES 1 Annunciator Response...................... 2 O AR-302 Rev. 13 Page i
1.0 PURPOSE 1.1 Establish a reference document for each Annunciator Window on the i _g-ES (A)-KW2 Lampbox. 1.2 Establish operator actions for valid Annunciator alarms.on the ES (A)-KW2 Lampbox. 1.3 Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the ES(A)-KW2 Lampbox.
2.0 REFERENCES
r 2.1 IMPLEMENTING REFERENCES 2.1.1 AP-380 - Engineered Safeguards Actuation 2.1.2 AP-360 - Loss of Decay Heat Removal f 1 2.1.3 OP-608 - OTSG's and Main Steam 2.1.4 OP-402 - Makeup and Purification 2.1.5 AP-790 - Station Blackout 2.1.6 AR-901 - DG 'A' Annunciator Response 2.1.7 OP-401 - Core Flood System f () 2.2 DEVELOPMENTAL REFERENCES 2.2.1 INPO 90-021, Good Practice OP-217, Alarm Response Procedures 2.2.2 Annunciator Window Engraving Drawing E-224-048 i 3.0 PERSONNEL INDOCTRINATION 3.1 The Annunciator System is powered from VBDP-5 Breaker 28. i 4.0 INSTRUCTIONS 4.1 Respond to alarms on the ES(A)-KW2 Lampbox as indicated on Enclosure 1, Annunciator Response. 5.0 FOLLOW-UP k IIn"5 None i ~ AR-302 Rev. 13 Page 1
ENCLOSURE 1 (Page 1 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-01-01 B-01-01 I l RB SPRAY i l l ES A i l I ACTUATION I i I I EVENT POINT 0935 1 I INDICATED CONDITION: o REACTOR BUILDING PRESSURE IS >30 PSIG COINCIDENT WITH A RB SPRAY PERMIT i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o BLUE ES STATUS LIGHTS FOR RB SPRAY O o BUILDING SPRAY PUMP IS RUNNING 4 o RB PRESSURE CONTROL BOARD INDICATOR BS-90-PI, BS-16-PI o COMPUTER POINT P-254-i l i OPERATOR ACTIONS FOR A VALID ALARM: l o REFER TO AP-380 i I DISCUSSION: o HPI ACTUATION THROUGH BLOCK 5 WILL GIVE A BUILDING SPRAY PERMIT. l l u 2 l.
REFERENCES:
DRAWING 20B-02B SHEET ESA-70 l SENSING ELEMENT: 63-Z1/RB-4,RB-5 RB-6 ES ACTUATION RELAYS O t AR-302 Rev. 13 Page 2. ~I
ENCLOSURE 1 (Page 2 of 61) ( ESB ANNUNCIATOR RESPONSE ESA-KW2-01-02 B-01-02 RB SPRAY PP A TRIP EVENT POINT 0044 INDICATED CONDITION: o BSP-IA BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o B A S H OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE OF BREAKER TRIP o CHECK BREAKER FOR DROP TARGET INDICATORS DISCUSSION: REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-009 SHEET BS-01 SENSING ELEMENT: CcMC. CS/0 (CONTROL SWITCH CONTACTS) 525, 52H O AR-302 Rev. 13 Page 3
~ ENCLOSURE 1 (Page 3 of 61) k-ESB ANNUNCIATOR RESPONSE ESA-KW2-01-03 B-01-03 i \\ 1 li i RB SPRAY PP A MOTOR l OVERLOAD l i 1 j EVENT POINT 0059 INDICATED CONDITION: o MOTOR AMPS 1115% RATED LOAD i B REDUNDANT INDICATION WHICH WILL VERIFY ALARM-o HIGH BUILDING SPRAY FLOW AS SEEN ON BS-1-FIl o HIGH i40 TOR AMPS l 0 BSP-1A TRIP OPERATOR ACTIONS FOR A VALID ALARM: o REDUCE BS FLOW BY THROTTLING BSV-3 CLOSED c o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS o IF LOAD REMAINS HIGH ON BSP-1A CONSIDER TRIPPING BSP-1A DISCUSSION: THIS ALARM INDICATES THAT EITHER THE TIMED OVER CURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANE0US OVERCURRENT 4 f PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER. IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.
REFERENCES:
DRAWING 208-009 SHEET BS-01 SENSING ELEMENT: 51-IOC(INSTANTANEOUS) 51-TOC (TIMED) BREAKER CONTACTS lO AR-302 Rev. 13 Page 4
I ENCLOSURE I (Page 4 of 61) ESB ANNUNCIATOR RESPONSE ESA-KM2-01-04 B-01-04 _ i i RB SPRAY PP A OUT OF SERVICE i EVENT POINT 0043 I i i INDICATED CONDITION: o BSP-IA BREAKER IS RACKED OUT j i i i' REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION O o NO ES STATUS INDICATION j ,i ) OPERATOR ACTIONS FOR A VALID ALARM: l o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT l l J DISCUSSION: I ADDRESS STS ADMINISTRATIVE REQUIREMENTS CONCERNING THIS CONDITION i i i s i
REFERENCES:
DRAWING 20B-009 SHEET BS-01 a SENSING ELEMENT: 52-H BREAKER CONTACT O J AR-302 Rev. 13 Page 5
ENCLG3URE 1 (Page 5 of 61) ( ESB ANNUNCIATOR RESPONSE ESA-KW2-01-04 B-01-04 RB SPRAY PP A OUT OF SERVICE EVENT POINT 0061 1 INDICATED CONDITION: o BSP-IA BREAKER HAS NO DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION o ES STATUS LIGHTS INDICATE BREAKER POSITION O l OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY BSP-IA BREAKER DC KNIFE SWITCH IS CLOSED o VERIFY DPDP-5A SWITCH 10 IS CLOSED DISCUSSION: THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING. REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-009 SHEET BS-01 SENSING ELEMENT: 27C BREAKER RELAY O AR-302 Rev. 13 Page 6
ENCLOSURE 1 (Page 6 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-01-05 B-01-05 i l RB SPRAY A FLOW HIGH/ LOW EVENT POINT 0047 INDICATED CONDITION: o BUILDING SPRAY FLOW IS <1400 GPM AS MEASURED BY BS-1-FS1 FOR 30 SEC. COINCIDENT WITH AN ES ACTUATION i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RB SPRAY FLOW INDICATOR BS-1-FL1 OR INDICATOR ON BSV-3 1 OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, OPEN BSV-3 AS REQUIRED o VERIFY BSP-IA NOT TRIPPED DISCUSSION: THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1550 GPM. TAKING LOCAL / AUTO CONTROL OF BSV-3 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION. ~
REFERENCES:
DRAWING 208-009 SHEET BS-11 SENSING ELEMENT. BS-I-FS1 b7 l AR-302 Rev. 13 Page 7
) ENCLOSURE 1 (Page 7 of 61) { ESB ANNUNCIATOR RESPONSE ESA-KW2-01-05 B-01-05 i RB SPRAY A l FLOW l HIGH/ LOW EVENT POINT 0049 5 INDICATED CONDITION: j o BUILDING SPRAY FLOW IS >1700 GPM AS MEASURED BY BS-1-FSI. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l o RB SPRAY FLOW INDICATOR BS-1-FIl OR INDICATOR ON BSV-3 l O L OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, THROTTLE BSV-3 AS REQUIRED TO REDUCE FLOW f DISCUSSION: THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1550 GPM. TAKING LOCAL / AUTO CONTROL OF BSV-3 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT ^ WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION. I
REFERENCES:
DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-1-FSI f O i AR-302 Rev. 13 Page 8 j 3 i
ENCLOSURE 1 (Page 8 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-01-05 B-01-05 RB SPRAY A FLOW HIGH/ LOW EVENT POINT 0063 INDICATED CONDITION: o BUILDING SPRAY FLOW IS <1100 GPM AS MEASURED BY BS-81-FIS WITH DHV-42 OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RB SPRAY FLOW INDICATOR BS-1-FIl OR INDICATOR ON BSV-3 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, OPEN BSV-3 AS REQUIRED o VERIFY BSP-1A NOT TRIPPED DISCUSSION: THE NORMAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO ENSURE ADEQUATE NET POSITIVE SUCTION HEAD i FOR THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF BSV-3, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLL'ER TO SET THE FLOW RATE. IF THIS*DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD i STATION. i ~
REFERENCES:
DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-81-FIS AR-302 Rev. 13 Page 9 i
I ENCLOSURE _1 (Page 9 of 61) l t ESB ANNUNCIATOR RESPONSE ESA-KW2-01-05 B-01-05 i RB SPRAY A FLOW HIGH/ LOW I l t EVENT POINT 0065 i l INDICATED CONDITION: o BUILDING SPRAY FLOW IS >1300 GPM AS MEASURED BY BS-81-FIS WITH DHV-42 OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RB SPRAY FLOW INDICATOR BS-1-FIl OR INDICATOR ON BSV-3 OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY PROPER OPERATION OF BSV-3, THROTTLE BSV-3 AS REQUIRED TO REDUCE FLOW DISCUSSION: THE NORMAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR THE BUILDING SPRAY PUMP. OPERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF BSV-3, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD STATION. l
REFERENCES:
DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-81-FIS AR-302 Rev. 13 Page 10
~ ENCLOSURE 1 (Page 10 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-02-01 B-02-01 RB FAN A HIGH SPEED TRIP EVENT POINT 0348 INDICATED CONDITION: o AHF-IA CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START, AND HIGH SPEED WINDINGS NOT ENERGIZED. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN HIGH SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND CONTROL HANDLE PUSHED IN. ,q LJ OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF FAN TRIP DISCUSSION: THIS ALARM WILL OCCUR IF THE FAN IS RUNNING IN HIGH SPEED AND AN ES ACTUATION OCCURS. THIS WILL TRIP THE FAN IN HIGH SPEED AND START THE FAN IN SLOW SPEED SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OA FAN VIBRATION ALARMS.
REFERENCES:
DRAWING 208-005 SHEET AH-28 'S/IN, CS/SC, CS/0, 42/1F RELAY SENSING. ELEMENT: C O ~ AR-302 Rev. 13 Page 11
~ ENCLOSURE 1 (Page II of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-02-02 B-02-02 RB FAN A LOW SPEED TRIP EVENT POINT 0349 1 INDICATED CONDITION: o AHF-1A CONTROL HANDLE PULLED OUT, IN NORMAL AFTER START, AND SLOW SPEED WINDINGS NOT ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LOW SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND THE CONTROL HANDLE PULLED OUT OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF FAN TRIP DISCUSSION: SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACX OF THE CONTROL BOARD OR FAN VIBRATION ALARMS
REFERENCES:
DRAWING 208-005 SHEET AH-28 SENSING ELEMENT: CS/00T, CS/SC, CS/0, 42/15 RELAY O AR-302 Rev. 13 Page 12
ENCLOSURE 1 i (Page 12 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-02-03 B-02-03 t RB FAN A l AIR FLOW j LOW i EVENT POINT 0350 t i i INDICATED CONDITION: o AHF-1A CONTROL HANDLE PUSHED IN AND IN NORMAL AFTER START AND LOW AIR j FLOW IS SENSED BY AH-17-DPS. I REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o REACTOR BUILDING TEMPS ARE INCREASING AS SEEN ON AH-536-TIR j {O l OPERATOR ACTIONS FOR A VALID ALARM. o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO l SECURE THE FAN i I DISCUSSION: THIS ALARM MAY BE IN WHEN AN ES ACTUATION HAS STARTED A PREVIOUSLY RUNNING FAN IN SLOW SPEED. PLACING THE CONTROL HANDLE IN THE PULL OUT NORMAL AFTER START POSITION SHOULD CLEAR THE ALARM. ALSO IF THE FAN TRIPS THIS ALARM SHOULD ACTUATE. j i
REFERENCES:
DRAWING 208-005 SHEET AH-2B l SENSING' ELEMENT: AH-17-DPS O i AR-302 Rev. 13 Page 13 .l
ENCLOSURE 1 i (Page 13 of 61) (' ESB ANNUNCIATOR RESPONSE ESA-KW2-02-04 B-02-04 4 3 RB FAN A VIBRATION ^ HIGH t EVENT POINT 0351 INDICATED CONDITION: j o AHF-IA HIGH VIBRATION CONDITION IS SENSED BY AH-18-MEI/2 i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o FAN AND MOTOR TEMPS INCREASING ON AH-1003-TIR ON BACK OF CONTROL BOARD o IF FAN IS RUNNING IN SLOW SPEED THEN CURRENT ON THE FAN MAY BE OSCILLATING. OPERATOR ACTIONS FOR A VALID ALARM: i o ATTEMPT TO RESET. ALARM BY DEPRESSING RESET PUSHBUTTON ON CONTROL BOARD o IF CONDITION CANNOT BE CORRECTED ~THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN l DISCUSSION: IF REAC10R BUILDING ENTRY IS POSSIBLE CONSIDERATION SHOULD BE MADE TO ENTER RB AND INVESTIGATE HIGH VIBRATION CONDITION. l l i
REFERENCES:
DRAWING 208-005 SHEET AH-132 SENSING ELEMENT: AH-18-MEI, AH-18-ME2 4 O l AR-302 Rev. 13 Page 14 1
ENCLOSURE 1 (Page 14 of 61) [} ESB ANNUNCIATOR RESPONSE ESA-KW2-02-05 B-02-05 -v THIS AR IS ONLY USED WHEN COLD LEG N0ZZLE DAMS ARE INSTALLED PER MP-110C RCSG-1A N0ZZLE DAM PROBLEM i EVENT POINT 1697 INDICATED CONDITIM-o "A" SIDE N0ZILE DAM CONTROL CONSOLE IS IN ALARM REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o N0ZZLE DAM PRESSURE >9 PSIG ON EITHER SEAL a N0ZZLE DAM PRESSURE <6.5 PSIG ON EITHER SEAL f o N0ZZLE DAM AIR FLOW >9 SCFH '~' o LOSS OF POWER TO THE CONTROL PANEL OPERATOR ACTIONS FOR A VALID ALARM: o IMMEDIATELY INVESTIGATE SOURCE OF ALARM o REFER TO AP-360 DISCUSSION: THIS ALARM INDICATES POSSIBLE N0ZZLE DAM SEAL DEGRADATION. IF THE SEAL FAILS, A REACTOR COOLANT LEAK WOULD DEVELOP, FLOODING THE PRIMARY SIDE OF THE STEAM GENERATORS WHERE PERSONNEL MAY BE AT WORK. ~ THIS EVENT POINT IS ONLY IN USE ON A TEMPORARY BASIS WHEN N0ZZLE DAMS ARE INSTALLED. THE WINDOW "RB FAN A CONDENSATE HIGH" IS REMOVED FROM THE ANNUNCIATOR PANEL WHEN THIS EVENT POINT IS IN EFFECT.
REFERENCES:
MP-110C S SING ELEMENT: INTERNAL ALARM CIRCUITS INSIDE N0ZZLE DAM CONTROL CONSOLE O C/ ~ AR-302 Ref. 13 Page 15
ENCLOSURE 1 (Page 15 of 61) ( ESB ANNUNCIATOR RESPONSE ESA-KW2-02-06 B-02-06 ES A ACTUATION TROUBLE EVENT POINT 1230 INDICATED CONDITION: o "A" ES ACTUATION SIGNAL ON ONE OR MORE ES CHANNELS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ES STATUS LIGHTS o ES BISTABLE TRIP INDICATORS (> OPERATOR ACTIONS FOR A VALID ALAPM: o REFER TO AP-380 DISCUSSION: THIS ALARM INDICATES THAT AT LEAST ONE OF THREE CHANNELS OF "A" ES HAS ACTUATED. ANY HPI OR LPI BISTABLE TRIPPED WITH ES NOT BYPASSED, OR ANY 4 PSIG ES PRESSURE SWITCH ACTUATED WILL GIVE THIS ALARM. PLACING THE RC PRESSURE TEST MODULE IN " TEST" DEFEATS THIS ALARM FROM LPI OR HPI. WHEN THE 4 PSIG TEST 3 WITCHES ARE IN THE " TEST" POSITION THIS ALAPR IS DEFEATED FROM A 4 PSIG ACTUATION.
REFERENCES:
DRAWING 208-028 SHEET AS-AB-05 SENSING ELEMENT: VARIOUS ES ACTUATION CONTACTS O AR-302 Rev. 13 Page 16
i ~ EN_C100URE 1 (Page 16 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-03-01 B-03-01 RB FAN C i i HIGH SPEED 1 I TRIP I I i i i EVENT POINT 0356 i i INDICATED CONDITION: o AHF-1C CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START WITH THE FAST SPEED WINDINGS NOT ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN HIGH SPEED LIGHT ON WITH A RED FLAG ON CONTROL STATION.AND CONTROL HANDLE PUSHED IN l O i OPERATOR ACTIONS FOR A VALID ALARM: l o INVESTIGATE CAUSE OF FAN TRIP i .j i DISCUSSION: l i THIS ALARM WILL OCCUR IF THE FAN IS RUNNING IN HIGH SPEED AND AN ES i ACTUATION OCCURS. THIS WILL TRIP THE FAN IN HIGH SPEED AND START THE l FAN IN SLOW SPEED j SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS
REFERENCES:
DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: CS/IN. CS/SC, CS/0. 42/lF O AR-302 Rev. 13 Page 17 i i
ENCLOSURE 1 (Page 17 of 61) ( ESB ANNUNCIATOR RESPONSE ESA-KW2-03-02 B-03-02 RB FAN C LOW SPEED TRIP EVENT POINT 0357 INDICATED CONDITION: o AHF-IC CONTROL HANDLE PULLED OUT, IN NORMAL AFTER START, AND THE SLOW SPEED WINDINGS ARE NOT ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LOW SPEED LIGHT ON WITH A RED FLAG ON CONTROL STATION, AND CONTROL HANDLE PULLED OUT .) OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF FAN TRIP DISCUSSION: SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS i
REFERENCES:
DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: CS/00T, CS/SC, CS/0. 42/1S RELAY AR-302 Rev. 13 Page 18
ENCLOSUBL1 (Page 18 of 61) [] ESB ANNUNCIATOR RESPONSE ESA-KW2-03-03 B-03-03 v f l RB FAN C AIR FLOW LOW EVENT POINT 0358 INDICATED CONDITION: o AHF-1C CONTROL HANDLE PUSHED IN, IN NORMAL AFTER START AND LOW AIR FLOW AS SENSED BY AH-21-DPS. REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o REACTOR BUILDING TEMPS ARE INCREASING AS SEEN ON AH-536-TIR OPERATOR ACTIONS FOR A VALID ALARM: a o IF CONDITION CANNOT BE CORRECTED THEN CONSIDEPATION SHOULD BE MADE TO SECURE THE FAN DISCUSSION: THIS ALAPR MAY BE Mi WHEN Aff ES ACTUATION HAS STARTED A PREVIOUSLY RUNNING FAN IN SLOW SPEED. PLACING THE CONTROL HANDLE IN THE PULL OUT NOPEAL AFTER START POSITION SHOULD CLEAR THE ALARM. ALSO IF THE FAN TRIPS THIS ALAPR SHOULD ACTUATE.
REFERENCES:
DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: AH-21-DPS CS/0UT, CS/SC, CS/0, 42/1S RELAY AR-302 Rev. 13 Page 19
N ~ ENCLOSURE 1 (Page 19 of 61)
- ('
ESB ANNUNCIATOR RESPONSE ESA-KW2-03-04 l B-03-04 RB FAN C VIBRATION L HIGH EVENT POINT 0359 INDICATED CONDITION: o AHF-IC HIGH VIBRATION CONDITION IS SENSED BY AH-22-ME1/2 t REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o FAN AND MOTOR TEMPS INCREASING ON AH-1003-TIR ON BACK OF CONTROL BOARD o IF FAN IS RUNNING IN SLOW SPEED THEN CURRENT ON THE FAN MAY BE i ( OSCILLATING. OPERATOR ACTIONS FOR A VALID ALARM: o ATTEMPT TO RESET ALARM BY DEPRESSING RESET PUSHBUTTON ON CONTROL BOARD o IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO SECURE THE FAN DISCUSSION: IF REACTOR BUILDING ENTRY IS POSSIBLE CONSIDERATION SHOULD BE MADE TO ENTER RB AND INVESTIGATE HIGH VIBRATION CONDITION.
REFERENCES:
DRAWING 208-005 SHEET AH-132 SENSING ELEMENT: AH-22-MEl, AH-22-ME2 O AR-302 Rev. 13 Page 20
ENCLOSURE 1 (Page 20 of 61) ( ESB ANNUNCIATOR RESPONSE ESA-KW2-03-05 B-03-05 i RB FAN C CONDENSATE HIGH I EVENT POINT 1699 INDICATED CONDITION: o AHF-IC CONDENSATE FLOW IS >1133 CC PER MINtJTE AS SENSED BY AH-658-FIS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o REACTOR BUILDING SUMP RATE OF RISE IS INCREASING AS SEEN ON BS-93-PIR t O OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE SOURCE OF CONDENSATE DISCUSSION: SOME SOURCES OF HIGH CONDENSATION ARE: RCS LEAK IN CONTAINMENT - CHECK PZR LEVEL AND MAKE UP TANK LEVEL TRENDS; FEEDWATER/ MAIN STEAM LEAK IN CONTAINMENT - CHECK FEEDWATER FLOWRATES; RB FAN COOLER SW LEAKS - CHECK SW SURGE TANK LEVEL IF ON SW, OR CI SURGE TANK LEVELS IF ON CI.
REFERENCES:
DRAWING 208-005 SHEET AH-131 SENSING ELEMENT: AH-658-FIS AR-302 Rev. 13 Page 21 i i
ENCLOSURE 1 (Page 21 of 61). j ESB ANNUNCIATOR RESPONSE ESA-KW2-03-06 B-03-06 6 i l l RB FAN C l I I POWER SUPPLY I I MISALIGN l + EVENT POINT 0799 j INDICATED CONDITION. o AHF-1C SELECTED FOR "A" ES START ESMCC-3AB IS BEING POWERED FROM ES 480V BUS 3B l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: ~ o SWITCH IN ES ACTUATION RELAY CABINET 4D IS SELECTED TO "AHF-1C" o ESMCC-3AB POWER SOURCE STATUS LAMP INDICATES ABT IS SELECTED TO ES 480V BUS 38 OPERATOR ACTIONS FOR A VALID ALARM: o SELECT AHF-1A FOR ES START ON ES "A" ACTUATION OR ) o SELECT ESMCC-3AB TO 480V ES BUS 3A POWER SOURCE l DISCUSSION: THIS CONDITION VIOLATES REQUIREMENTS FOR ES TRAIN SEPARATION. OPERABILITY CONCERNS MUST BE ADDRESSED WHILE THIS CONDITION EXISTS. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. i
REFERENCES:
DRAWING 208-005 SHEET AH-30 SENSING ELEMENT: MTXS-1 SS-BY 1 AR-302 Rev. 13 Page 22
ENCLOSURE 1 (Page 22 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-03-06 B-03-06 RB FAN C POWER SUPPLY MISALIGN EVENT POINT 0801 INDICATED CONDITION: o AHF-IC SELECTED FOR "B" ES START, AND ES-MCC-3AB IS BEING POWERED FROM ES 480V BUS 3A REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o SWITCH IN ES ACTUATION RELAY CABINET SD IS SELECTED TO "AHF-IC" o ES-MCC-3AB POWER SOURCE STATUS LAMP INDICATES ABT IS SELECTED TO ES 480V O BUS 3A OPERATOR ACTIONS FOR A VALID ALARM: o SELECT AHF-1B FOR ES START ON ES "B" ACTUATION OR o SELECT ES-MCC-3AB TO 480V ES BUS 3B POWER SOURCE DISCUSSION: THIS CONDITION VIOLATES REQUIREMENTS FOR ES TRAIN SEPARA7 ION. OPERABILITY CONCERNS MUST BE ADDRESSED WHILE THIS CONDITION EXISTE.
REFERENCES:
DRAWING 208-005 SHEET AH-30 ~ SENSING ELEMENT: MTXS-1,SS-BY AR-302 Rev. 13 Page 23
ENCLOSURE 1 (Page 23 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-04-01 B-04-01 MAKEUP PP A TRIP EVENT POINT 1035 ~ INDICATED CONDITION: o BREAKER 4S OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o AMBER ES STATUS LIGHT N/ OPERATOR ACTIONS FOR A VALID ALARM: o CLOSE MUV-16, AND MUV-31 AND MINIMIZE LETDOWN FLOW o INVESTIGATE MUP-1A BREAKER FOR DROPPED TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP DISCUSSION: EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED. REFER TO STS FOR ADM'AISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: CS/SC, CS/0, 52H/B, 525/B 1 AR-302 Rev. 13 Page 24
ENCLOSURE 1 (Page 24 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-04-02 B-04-02 MAKEUP PP A GEAR OIL PRESS LOW EVENT POINT 1057 INDICATED CONDITION: o MUP-1A BREAKER CLOSED 120 SECONDS WITH GdAR OIL PRESS 57 PSIG AS SENSED BY MU-88-PS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o BACK UP GEAR OIL PUMP AUTO STARTS o COMPUTER POINT X-067 O. OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY MUP-5A DC BACK UP GEAR OIL PUMP STARTED o MONITOR MUP-1A VIA COMPUTER GROUP 70 DISCUSSION: CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE UP PUMPS PER OP-402
REFERENCES:
DRAWING 208-041 SHEET MU-49 SENSING ELEMENT: MU-88-PS, CS/SC, CS/0, 52H/B. 52S/B l AR-302 Rev. 13 Page 25 i
ENCLOSURE 1 (Page 25 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-04-03 B-04-03 MAKEUP PP A MOTOR OVERLOAD EVENT POINT 1033 INDICATED CONDITION: o MOTOR AMPS 1 115". RATED LOAD REDUNDANT INDICATION WHICH WILL YERIFY ALARM: o HIGH MOTOR AMPS o MVP-1A TRIP gm. t] o HIGH FLOWRATES THROUGH MUP-IA OPERATOR ACTIONS FOR A VALID ALARM: o THROTTLE MAKEUP FLOW TO MAINTAIN <540 GPM FLOW PER AP-380. o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS DISCUSSION: THIS ALARM INDICATES THAT EITHER T"! T'MED OVER CURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HME...UATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL Th1P ifE BREAKER. IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.
REFERENCES:
DRAWING 208-041 SHEET MU-49 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE AR-302 Rev. 13 Page 26
~ ENCLOSURE 1 (Page 26 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-04-04 B-04-04 MAKEUP PP A LUBE OIL PUMP TRIP I EVENT POINT 1048 i INDICATED CONDITION: o MUP-2A CONTRCL HANDLE IN NORMAL AFTER START POSITION AND MOTOR NOT i ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION -{ o LOW LUBE OIL PRESSURE ALARM O o MUP-3A BACK-UP LUBE DIL PUMP AUTO START l OPERATOR ACTIONS FOR A VALID ALARM: l 0 ENSURE MVP-3A BACK-UP LUBE OIL PUMP STARTED DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. i MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 70. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS. I
REFERENCES:
DRAWING 208-041 SHEET MU-05 -j SENSING ELEMENT: CS/SC. CS/0, 42B j O 1 I i AR-302 Rev. 13 Page 27
~ ENCLOSURE 1 (Page 27 of 61) 2[ ESB ANNUNCIATOR RESPONSE ESA-KW2-04-04 B-04-04 MAKEUP PP A i LUBE OIL PUMP TRIP EVENT POINT 1052 INDICATED CONDITION: o MVP-3A CONTROL HANDLE IN THE NORMAL AFTER START POSITION AND MOTOR IS NOT ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALAPM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION e o MAKEUP PUMP OIL PRESSURE LOW ALARM l o COMPUTER POINT X070 OPERATOR ACTIONS FOR A VALID ALAPM: o MONITOR MUP-IA BEARING OIL TEMPERATURES i DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. ) MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 70. CONSIDEPATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.
REFERENCES:
DRAWING 208-041 SHEET MU-30 SENSING ELEMENT: CS/SC, CS/0, CRI AR-302 Rev. 13 Page 28
ENCLOSURE I (Page 28 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-04-06 B-04-06 l l AUX STEAM ISO i I (ASV-195) i i BYPASSED + EVENT POINT 1960 INDICATED CONDITION: o CONTROL SWITCH FOR ASV-195 AUX STEAM SOLEN 0ID VALVE IS THE OPEN/ BYPASS i POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ASV-195 SELECTOR SWITCH POSITION O ~ OPERATOR ACTIONS FOR A VALID ALARM: o REFER TO OP-608 DISCUSSION: THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-195 ON HIGH OR LOW AUX STEAM PRESSURE IS DISABLED. THIS IS A HIGH ENERGY LINE BREAK CONCEPS.
REFERENCES:
DRAWING 208-008 SHEET AS-05 SENSING ELEMENT: CS/NC l O i AR-302' Rev. 13 Page 29
~ ENCLOSURE 1 (Page 29 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-05-02 B-05-02 (jo s MAKEUP PP A LUBE OIL PRESS LOW EVENT POINT 1031 INDICATED CONDITION: o ES START SELECTOR SWITCH FOR MVP IA/IB IS SELECTED TO MUP-1A AND LUBE OIL PRESS AS SENSED BY MU-42-PS3 IS <3 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o MUP-1A ES START SELECT WHITE INDICATING LIGHT ON o MUP-3A BACK UP LUBE OIL PUMP AUTO STARTS OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MUP-3A HAS STARTED i l DISCUSSION: THIS ALARM INDICATES THAT THERE IS INADEQUATE LUBRICATION FOR MUP-1A. IF THE PUMP IS RUNNING THEN IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP STARTED, REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.
REFERENCES:
DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: CS/3A, W-42-PS3 J =: y/ AR-302 Rev. 13 Page 30
ENCLOSURE 1 (Page 30 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-05-03 B-05-03 MAKEUP PP A LUBE OIL PUMP AUTO START EVENT POINT 1051 INDICATED CONDITION: o MUP-3A CONTROL HANDLE IN THE NORMAL AFTER STOP POSITION AND MOTOR IS ENERG7 ZED REDUNDANT INDICATION WHICH WILL VERIFY ALAPM: o RED LIGHT ON WITH A GREEN FLAG ON MUP-3A CONTROL STATION r-o COMPUTER POINT XO71 ( OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MUP-3A IS RUNNING DISCUSSION: THIS ALAPR IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 71. CONSIDERATION SHOULO BE GIVEN TO SWAPPING MAKE-UP PUMPS.
REFERENCES:
DRAWING 208-041 SHEET MU-31 SENSING ELEMENT: CS/ST, CS/ST, CS/0, CRI O AR-302 Rev. 13 Page 31
I i ENCLOSURE 1 (Page 31 of 61) l ~ <(] ESB. ANNUNCIATOR RESPONSE ESA-KW2-05-04 B-05-04 MAKEUP PP A OUT OF SERVICE i i- [ i EVENT POINT 1032 i l INDICATED CONDITION: o MUP-1A BREAKER HAS NO DC CONTROL POWER ) i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO RED OR GREEN DDICATING LIGHTS ON CONTROL STATION i o ES STATUS LIGHTS SHOW BREAKER POSITION O-l OPERATOR ACTIONS FOR A VALID ALARM: l o VERIFY CLOSED DPDP-5A SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MUP-1A BREAKER CLOSED DISCUSSION: THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING. REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MUP-1A o AR-302 Rev. 13 Page 32 I
~ ENCLOSURJ l (Page 32 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-05-04 B-05-04 i MAKEUP PP A OUT OF SERVICE EVENT POINT 1034 I INDICATED CONDITION: j o MUP-1A BREAKER IS RACKED OUT AND IS SELECTED FOR ES START j REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION -O OPERATOR ACTIONS FOR A VALID ALARM: I o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT i i i ~ DISC.USSION: TWO PUMPS SHOULD BE SELECTED FOR ES START. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. f
REFERENCES:
DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: 43/3A CUBICLE 3A9, 52H/b CUBICLE 3A9 FOR MVP-1A 0 1
- AR-302 Rev. 13 Page 33
ENCLOSURE 1 (Page 33 of 61) l f ESB ANNUNCIATOR RESPONSE ESA-KW2-05-06 B-05-06 I i AUX STEAM ISO i i i I (ASV-195) 1 I AUTO CLOSED C22 j EVENT POINT 1815 INDICATED CONDITION: i i o CONTROL SWITCH FOR ASV-195 AUX STEAM SOLEN 0ID VALVE IS IN THE AUTO POSITION AND THE VALVE IS CLOSED l ~ l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: ~ ~ o ASV-195 SELECTOR SWITCH IN AUTO o GREEN INDICATOR LIGHT ON SELECTOR SWITCH i OPERATOR ACTIONS FOR A VALID ALARM: } o REFER TO OP-608 l DISCUSSION: THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-195 ON EITHER LOW i AUX STEAM PRESSURE OR HIGH AUX STEAM PRESSURE HAS OCCURRED. A LOW PRESSURE ACTUATION OCCURS AT <100 PSIG AND A HIGH PRESSURE ISOLATION OCCURS AT >250 PSIG AUX STEAM HEADER PRESSURE IN THE AUX BUILDING. ] i
REFERENCES:
DRAWING 208-008 SHEET AS-05 SENSING ELEMENT: 3ASV-195-SV-I, 33C/ASV-195-SV, AS-36-PSI,AS-36-PS-3 l 'O ] l l I AR-302 Rev. 13 Page 34
ENCLOSURE 1 (Page 34 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-06-01 B-06-01 f f MAKEUP PP B I I TRIP i i I I I i i I EVENT POINT 1041 t INDICATED CONDITION: o MVP-1B BREAKER IS OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT ON WITH A RED FLAG ON MUP-1B CONTROL STATION o AMBER ES STATUS LIGHT OPERATOR ACTIONS FOR A VALID ALARM: o CLOSE MUV-16, AND MUV-31 AND MINIMIZE LETDOWN FLOW j o INVESTIGATE MVP-1B BREAKER FOR DROPPED TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP l DISCUSSION: i EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES l SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED. l REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. l
REFERENCES:
DRAWING 208-041 SHEET MU-02 SENSING ELEMENT: CS/SC, CS/0, 52H/B, 52S/B 1 O AR-302 Rev. 13 Page 35
ENCLOSURE 1 (Page 35 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-06-02 B-06-02 MAKEUP PP B GEAR OIL PRESS LOW EVENT POINT 1058 INDICATED CONDITION: o MUP-1B BREAKER CLOSED 120 SEC0fCS WITH GEAR OIL PRESS 17 PSIG AS SENSED BY MU-89-PS REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o MVP-5B BACK UP GEAR OIL PUMP AUTO STARTS o COMPUTER POINT X068 ^ OPERATOR ACTIONS FOR A VALID ALARM: o VERIFY MUP-58 BACK UP GEAR OIL PUMP STARTED o MONITOR MUP-1B VIA COMPUTER GROUP 71 DISCUSSION: THIS ALARM INDICATES THAT THERE MAY BE INADEQUATE LUBRICATION FOR THE SPEED INCREASER GEAR BOX, CONSIDERATION SHOULD BE GIVEN TO TRANSFERRING TO ANOTHER MAKEUP PUMP PER OP-402.
REFERENCES:
DRAWING 208-041 SHEET MU-50 SENSING ELEMENT: CS/SC, CS/0. 52H/B ;"c;/A, MU-89-PS O AR-302 Rev. 13 Page 36
ENCLOSURE 1 (Page 36 of 61) f ESB ANNUNCIATOR RESPONSE ESA-KW2-06-03 B-06-03 MAKEUP PP B MOTOR OVERLOAD i i EVENT POINT 1039 I INDICATED CONDITION: o MOTOR AMPS >115% RATED LOAD [ t REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l o HIGH MOTOR AMPS o >540 GPM TOTAL INDICATED FLOW THROUGH MVP-1B O o MUP-IB TRIP i OPERATOR ACTIONS FOR A VALID ALARM: o THROTTLE MAKEUP FLOW TO MAINTAIN <540 GPM FLOW PER AP-380 o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS l i k DISCUSSION: THIS ALARM INDICATES THAT EITHER THE TIMED OVER CURRENT OR INSTANTANE0US l OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER. l IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.
REFERENCES:
DRAWING 208-04I SHEET MU-02 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE O i i AR-302 Rev." 13 Page.37
ENCLOSURE I i (Page 37 of 61) s ESB ANNUNCIATOR RESPONSE ESA-KW2-06-04 B-06-04 i i MAKEUP PP B LUBE OIL PUMP l TRIP I EVENT POINT 1049 INDICATED CONDITION: o MUP-2B MOTOR IS NOT ENERGIZED WITH THE CONTROL HANDLE IN NORMAL AFTER l START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION o LOW LUBE OIL PRESSURE ALARM o MUP-3B BACK-UP LUBE OIL PUMP AUTO START f OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MUP-3B BACK-UP LUBE OIL PUMP STARTED i l l DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 71. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.
REFERENCES:
DRAWING 208-041 SHEET MU-05 SENSING ELEMENT: CS/SC, CS/0, 42B O AR-302 Rev. 13 Page 38 sw e
ENCLOSURE 1 (Page 38 of 6I) i ESB ANNUNCIATOR RESPONSE ESA-KW2-06-04 B-06-04 MAKEUP PP B LUBE OIL PUMP TRIP l EVENT POINT 1054 INDICATED CONDITION: o MVP-3B MOTOR IS NOT ENERGIZED WITH THE CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: j o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION
- "" ""*" ""'**""' ' " ^'*""
(~~' o COMPUTER POINT XO7I OPERATOR ACTIONS FOR A VALID ALARM: o MONITOR MUP-IB PUMP TEMPS DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQtlATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 7I. CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE-UP PUMPS.
REFERENCES:
DRAWING 208-04I SHEET MU-3I SENSING ELEMENT: CS/SC, CS/0, CRI AR-302 Rev. I3 Page 39
i ~ ~ ENCLOSURE 1 (Page 39 of 61) j ESB ANNUNCIATOR RESPONSE ESA-KW2-07-02 B-07-02 MAKEUP PP B LUBE OIL PRESS LOW 2 EVENT POINT 1037 r INDICATED CONDITION: i o ES START SELECTOR SWITCH FOR MVP IA/IB IS SELECTED TO MUP-IB AND THE OIL r PRESS AS SENSED BY MU-45-PS3 IS <3 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALAPM: f o MUP-IB ES START SELECT WHITE INDICATING LIGHT ON l o MUP-38 BACK UP LUBE OIL PUMP AUTO STARTS O I OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MVP-3B HAS STARTED i i i i f DISCUSSION: l THIS ALARM INDICATES THAT THERE IS INADEQUATE LUBRICATION FOR MVP-IB. IF i l MUP-IB IS RUNNING THEN IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP STARTED PER OP-402. l t I
REFERENCES:
DRAWING 208-041 SHEET MU-02 SENSING ELEMENT: 43CS/3B7-3B, MU-45-PS3 O l AR-302 Rev. 13 Page 40-b
~ ENCLOSURE 1 (Page 40 of 61) ({') ESB ANNUNCIATOR RESPONSE ESA-KW2-07-03 B-07-03 i MAKEUP PP B LUBE OIL PUMP AUTO START EVENT POINT 1053 INDICATED CONDITION: o MUP-3B CONTROL HANDLE IN THE NORMAL AFTER STOP POSITION AND MOTOR IS ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o RED LIGHT ON WITH A GREEN FLAG ON MVP-3B CONTROL STATION o COMPUTER POINT XO71 OPERATOR ACTIONS FOR A VALID ALARM: o ENSURE MUP-3A IS RUNNING DISCUSSION: THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP. MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 71. CONSIDERATION SHOULD BE GIVEN TO STARTING ANOTHER MAKE-UP PUMP.
REFERENCES:
DRAWING 20B-041 SHEET MU-31 SENSING ELEMENT: CS/ST, CS/ST, CS/0, CRI AR-302 Rev. 13 Page 41
ENCLOSURE 1 (Page 41 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-07-04 B-07-04 i MAKEUP PP B OUT OF SERVICE [ i l i EVENT POINT 1038 INDICATED CONDITION: o MUP-IB BREAKER HAS NO DC CONTROL POWER i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NO INDICATING LIGHTS ON CONTROL STATION o ES STATUS LIGHTS INDICATE BREAKER POSITION i OPERATOR ACTIONS FOR A VALID ALARM: { o VERIFY CLOSED DPDP-5B SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MUP-1B BREAKER CLOSED t l DISCUSSION: l 4 i THIS CONDITION DISABLES REMDTE BREAKER OPERATION AND PROTECTIVE RELAYING i REFER TO OP-703 FOR LOCAL BREAKER OPERATION. THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS. i REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. r PEFERENCES: DRAWING 208-041 SHEET MU-02 i SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MVP-IB o i AR-302 Rev. 13 Page 42 l l
ENCLOSURE 1 (Page 42 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-07-04 B-07-04 l MAKEUP PP B-OUT OF SERVICE l t EVENT POINT 1040 INDICATED CONDITION: 3 o MUP-IB BREAKER IS RACKED OUT AND MVP-IB IS SELECTED FOR ES START REDUNDANT INDICATION WHICH WILL VERIFY ALARM: i o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION O i OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT DISCUSSION: i TWO PUMPS SHOULD BE SELECTED FOR ES START. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. t
REFERENCES:
DRAWING 208-041 SHEET MU-021 1 SENSING ELEMENT: 43/3B ON CUBICLE 3AIO, 52H/b IN CUBICLE 3A9 FOR MVP-IB i O l i AR-302 Rev. 13 Page 43 1 l
t ENCLOSURE 1 (Page 43 of 61) [ f ESB ANNUNCIATOR RESPONSE ESA-KW2-02-05 B-02-05 i RB FAN A CONDENSATE HIGH l l EVENT POINT 1697 INDICATED CONDITION: l o AHF-1A CONDENSATE FLOW IS >1133 CC PER MINUTE AS SENSED BY AH-656-FIS l REDUNDANT INDICATION WHICH WILL VERIFY ALARM: l o REACTOR BUILDING SUMP RATE OF RISE IS INCREASING AS SEEN ON BS-93-PIR O OPERATOR ACTIONS FOR A VALID ALARM: + l o INVESTIGATE SOURCE OF CONDENSATE l I DISCUSSION: SOME SOURCES OF HIGH CONDENSATION ARE: l RCS LEAK IN CONTAINMENT - CHECK PIR LEVEL AND MAKE UP TANK LEVEL TRENDS; 3-l' FEEDWATER/ MAIN STEAM LEAK IN CONTAINMENT - CHECK FEEDWATER FLOWRATES; RB FAN C00LEB SW LEAKS - CHECK SW SURGE TANK LEVEL IF ON SW, OR CI SURGE TANK LEVELS IF ON CI. i REFEREllCES:,0RAWING 208-005 SHEET AH-131 i { SENSIt[GELEllENT: AH-656-FIS .j O -AR-302 Rev. 13 Page 44 .l
~ ENtLOSURE 1 (Page 44 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-07-07 B-07-07 i I I H2 SAMPLING l i i I i PANEL A I i TROUBLE ZZZZ EVENT POINT 0080 l i INDICATED CONDITION: r 5 o PASS RB H2 ANALYZER "A" MALFUNCTION o HIGH RB H2 CONCENTRATION REDUNDANT INDICATION WHICH WILL VERITY ALARM: i o LOSS OF POWER TO PANEL o OVERPRESSURE TO PANEL AT >4 PSIG r O.^ o LOW FLOW TO PANEL AT <1 SCFH !1 o THERM 0 ELECTRIC COOLER <0.1 AMPS o RB H2 CONCENTRATION >3% i OPERATOR ACTIONS FOR A VALID ALARM: l o VERIFY PROPER VALVE LINEUP PER OP-417 i o NOTIFY I&C SUPERVISION OF H2 ANALYZER MALFUNCTION i i DISCUSSION: l THIS ALARM INDICATES EITHER THE POST ACCIDENT H2 CONCENTRATION INSIDE THE i RB IS HIGH, OR THE PASS H2 ANALYZER IS MALFUNCTIONING. STS ADMINISTRATIVE l CONSIDERATION SHOULD BE MADE PRIOR TO REMOVING BOTH H2 SAMPLERS FROM i' SERVICE t a
REFERENCES:
DRAWING 208-062 SHEET WS-04 ~ SENSING ELEMENT: VARIOUS FLOW / PRESSURE / CURRENT SWITCHES INSIDE THE SAMPLER i i O i AR-302 Rev. 13 Page 45 ( t
i l ENCLOSURE 1 l (Page 45 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-01 B-08-01 4 DIESEL GEN A l FAILED I TO START l l EVENT POINT 1204 INDICATED CONDITION: l 0 "A" EGDG HAS A START COMMAND AND LUBE OIL PRESSURE AS SENSED BY DL-9-PS IS <6 PSIG AFTER 7 SECOM S 01 o "A" EGDG HAS A START COMMAND AND ENGINE SPEED AS SENSED BY EG-19-SS IS <250 RPM AFTER 7 SECOM S j "' "" ^"' '" " """ "'" " "'^""' CJ o EGDG-IA TRIPS l c CONTROL BOARD " CRANK" LIGHT GOES OUT AND WHITE " READY" LIGHT DOES NOT COME ON o EGDG-IA STARTING AIR PRESSURE LOW ALARM ANNUNCIATES i i OPERATOR ACTIONS FOR A VALID ALARM: t o INSPECT EGDG-IA FOR CAUSE OF FAILURE TO START i o RESET PUSHBUTTON MUST BE DEPRESSED ON EGDG GAUGE BOARD PRIOR TO EGDG l RESTART j DISCUSSION: j t THIS ALARM INDICATES THE DIESEL TRIED TO START AND DID NOT. SOME POSSIBLE CAUSES OF THIS ARE: PROBLEMS WITH DIESEL FUEL SYSTEM, LUBE OIL SYSTEM PROBLEMS OR DIESEL SPEED SENSOR PROBLEMS. THIS ALARM IS STILL ACTIVE WITH AN ES SIGNAL PRESENT BUT WILL NOT DE-ENERGIZE THE STARTING AIR SOLEN 0 IDS, 50 THE DIESEL WILL CRANK UNTIL IT EITHER STARTS OR RUNS OUT OF AIR.
REFERENCES:
DRAWING 206-06 SHEET EG-17 EG-03, EG-01, EG-05 ( SENSING ELEMENT: DL-9-PR DL-19-SS, START FAIL RELAY I AR-302 Rev. 13 Page 46 9
} ENCLOSURE 1 (Page 46 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-01 B-08-01 DIESEL GEN A FAILED TO START EVENT POINT 1214 INDICATED CONDITION: o "A" EGDG HAS TRIPPED IT'S PHASE DIFFERENTIAL CURRENT RELAY o "A" EGDG TRIPS AND BREAKER 3209 OPENS o "A" EGDG 86 LOCK 0UT RELAY HAS ACTUATED REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o ES 4160V BUS 3A DE-ENERGIZES '~ o CONTROL BOARD "RUN" LIGHT GOES OUT OPERATOR ACTIONS FOR A VALID ALARM: o REFER TO AP-790 o INSPECT EGDG-IA FOR CAUSE OF DIFFERENTIAL CURRENT CONDITION o LOCK 0UT RELAY MUST BE MANUALLY RESET ONCE PROBLEM IS RESOLVED. DISCUSSION: THIS ALARM INDICATES THE DIESEL GENERATOR HAS EITHER, A PHASE TO PHASE SHORT OR A PHASE TO GROUND SHORT. THIS CONDITION WILL TRIP THE DIESEL AND PREVENT IT FROM STARTING. THE CAUSE OF THIS PROBLEM MUST BE RESOLVED PRIOR TO ANY ATTEMPT BEING MADE TO RESTART AND RELOAD THE DIESEL GENERATOR.
REFERENCES:
DRAWING 208-027 SHEET EG-15 SENSING ELEMENT: 86-DG-3A, 87A, 87B, 87C DIFFERENTIA'. CURRENT RELAYS 3 (O AR-302 Rev. 13 Page 47
1 i ENCLOSURE'1 ^ (Page 47 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-02 B-08-02 DIESEL GEN A l TROUBLE EVENT POINT 1202 i I INDICATED CONDITION: j o "A" EGDG LUBE OIL TEMP AS SENSED BY DL-11-TS IS <110* F 03 j o "A" EGDG JACKET COOLANT TEMP AS SENSED BY DJ-28-TS <115* F I i I I REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o LOCAL TEMP INDICATION FOR LUBE OIL OR JACKET COOLANT TEMPS LOW c DIESEL GENERATOR ALARM PANEL DROP TARGET FOR LOW LUBE OIL / JACKET COOLANT TEMP. ~ OPERATOR ACTIONS FOR A VALID ALARM: t i o INSURE PROPER OPERATION OF LUBE OIL HEATERS DLHE-3 o INSURE PROPER OPERATION OF JACKET COOLANT HEATER DJHE-1 o REFER TO OP-707 } i DISCUSSION: EGDG LUBE OIL TEMP MUST BE MAINTAINED >110' F REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS i l i
REFERENCES:
DRAWING 208-027 SHEET EG-07 SENSING ELEMENT: DL-;1-!S, DJ-28-TS i O i l ^ AR-302 Rev. 13 Page 48
I ENCLOSURE 1 (Page 48 of 61) j ESB ANNUNCIATOR RESPONSE ESA-KW2-08-02 B-08-02 I DIESEL GEN A. t TROUBLE EVENT POINT 1205 i INDICATED CONDITION: o "A" EGDG LOCAL ALARM PANEL HAS A DROPPED TARGET i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o INFORMED BY THE PRIMARY PLANT OPERATOR OF EGDG-IA LOCAL ALARM PANEL DROP TARGET. OPERATOR ACTIONS FOR A VALID ALARM: o NOTIFY PRIMARY PLANT OPERATOR TO INVESTIGATE CAUSE OF DROP TARGET. l 0 REFER TO AR-901 l DISCUSSION: } THIS ALARM. INDICATES A DIESEL GENERATOR LOCAL ANNUNCIATOR DROP TARGET HAS l DROPPED. IMMEDIATE INVESTIGATION OF ALARM CAUSE SHOULD BE INITIATED. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. I I
REFERENCES:
DRAWING 208-027 SHEET EG-17 I SENSING ELEMENT: VARIOUS SENSORS ASSOCIATED WITH LOCAL ALARM PANEL AR-302 Rev. 13 Page 49 - i
ENCLOSURE I (Page 49 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-08-03 B-08-03 DIESEL GEN A OUT OF SERVICE i I i a EVENT POINT 1195 INDICATED CONDITION: o "A" EGDG HAS HAD A LOSS OF DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o EGDG-IA STARTS WITH NO AUTO START SIGNAL i o EGDG-IA CONTROL CIRCUIT INDICATOR LIGHTS ON MAIN CONTROL BOARD OR INSIDE THE DIESEL GENERATOR ROOM ARE OFF OPERATOR ACTIONS FOR A VALID ALARM: i o VERIFY DPDP-6A SWITCHES 12 AND I4 ARE CLOSED o CHECK EGDG-IA CONTROL POWER FUSES DISCUSSION: A LOSS Of DC CONTROL POWER WILL EFFECT THE DIESEL DIFFERENTLY DEPENDING ON WHICH CIRCUIT LOSES POWER. IF ALL DC POWER IS LOST THE DIESEL WILL START AND YOU WILL ONLY BE ABLE TO SHUT IT DOWN LOCALLY BY TRIPPING THE FUEL RACKS. IF OTHER FUSES ARE BLOWN THE EFFECT WILL VARY FROM LOSS OF GOVERNOR CONTROL TO A LOSS OF PROTECTIVE RELAYING ASSOCIATED WITH THE DIESEL. THE CAUSE OF THIS ALARM SHOULD BE INVESTIGATED IMMEDIATELY. l REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-027 SHEET EG-I7, EG-03, EG-09, EG-05, EG-15 j SENSING ELEMENT: A,B C.D.E, LOSS OF POWER RELAYS O AR-302 Rev. 13 Page 50
i i ENCLOSURE 1 i (Page 50 of 61) ) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-03 B-08-03
- (
} DIESEL GEN A OUT OF SERVICE EVENT POINT 1206 INDICATED CONDITION: o "A" EGDG START AIR AS SENSED BY EG-11-PS IS <225 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: OPERATOR ACTIONS FOR A VALID ALARM: o INVESTIGATE CAUSE OF LOW AIR PRESSURE o VERIFY EGDG-1A AIR COMPRESSOR, EGP-1A RUNNING o CHECK EGDG-IA FOR AIR LEAKS DISCUSSION: A LOSS OF STARTING AIR WILL EVENTUALLY CAUSE THE DIESEL TO START WHEN PRESSURE IS NO LONGER HIGH EN0 UGH TO HOLD THE AUTO START VALVES CLOSED. IF EGP-1A IS OUT OF SERVICE THEN CONSIDERATION SHOULD BE GIVEN TO CROSS CONNECTING THE DIESEL START AIR SYSTEMS BY OPENING EGV-25 AND EGV-26. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-027 SHEET EG-17, EG-07 SENSING ELEMENT: EG-11-PS 7-, N AR-302 Rev. 13 Page 51
~ ENCLOSURE 1 (Page 51 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-03 B-08-03 DIESEL GEN A OUT OF SERVICE EVENT POINT 1207 j INDICATED CONDITION: o ANY "A" EGDG AUT0/ MANUAL CONTROL SWITCH NOT IN THE AU10 POSITION REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o NOTIFIED BY PRIMARY PLANT OPERATOR EGDG-1A CONTROL SWITCH NOT IN AUTO J l OPERATOR ACTIONS FOR A VALID ALARM: o NOTIFY PRIMARY PLANT OPERATOR TO RETURN CONTROL SWITCH TO AUTO DISCUSSION: THE FOLLOWING SWITCHES NOT IN AUTO WILL GIVE YOU THIS ALARM: JACKET COOLING PUMP JACKET COOLANT HEATER STANDBY LUBE OIL PUMP DC FUEL OIL PUMP DC FUEL OIL XFER PUMP AC FUEL OIL XFER PUMP AC AIR COMPRESSOR DIESEL AUT0/ MAN (MCB) NORMAL /AT ENGINE SWITCH ON DIESEL GAUGE BOARD IN "AT ENGINE" REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-027 SHEET EG-17, EG-07 SENSING ELEMENT: VARIOUS EGDG-1A CONTROL SWITCH CONTACTS l O AR-302 Rev. 13 Page 52
~ ENCLOSURE 1 (Page 52 of 61) ( ESB ANNUNCIATOR RESPONSE ESA-KW2-08-04 B-08-04 CF TANK A LEVEL HIGH/ LOW EVENT POINT 0109 INDICATED CONDITION: l o CFT-1A LEVEL AS SENSED BY CF-2-LSI IS >13.2 FEET REDUNDANT INDICATION WHICH WILL VERIFY ALARM: I o CONTROL BOARD INDICATORS CF-2-LII OR CF-2-LI2 o COMPUTER POINT P200 1 kJ OPERATOR ACTIONS FOR A VALID ALARM: l o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL ( o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: A HIG:4 CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES OR CORE FLOOD ADDITION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. I
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LSI l I AR-302 Rev. 13 Page 53
ENCLOSURE 1 (Page 53 of 61) ESB ANNUNCIATOR RESPONSE l ESA-KV2-08-04 B-08-04 i CF TANK A i LEVEL HIGH/ LOW EVENT POINT 0110 INDICATED CONDITION: l e CFT-IA LEVEL AS SENSED BY CF-2-LS2 IS >I3.2 FEET REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-2-LII OR CF-2-LI2 o COMPUTER POINT P200 CPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: HIGH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES OR CORE Fi.00D ADDITION VALVES LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS2 l AR-302 Rev. 13 Page 54
ENCLOSURE 1 i (Page 54 of 61) l ESB ANNUNCIATOR RESPONSE ESA-KW2-08-04 B-08-04 O i CF TANK A LEVEL HIGH/ LOW EVENT POINT 0111 INDICATED CONDITION: l o CFT-1A LEVEL AS SENSED BY CF-2-LSI IS <12.8 FEET REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-2-LII OR CF-2-LI2 ( o COMPUTER POINT P200 OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES OR CFT SAMPLE ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LSI O AR-302 Rev. 13 Page 55
ENCLOSURE I ~ (Page 55 of 61) i u ESB ANNUNCIATOR RESPONSE ESA-KW2-08-04 B-08-04 O r CF TANK A LEVEL HIGH/ LOW t EVENT POINT 0112 INDICATED CONDITION: l 0 CFT-1A LEVEL AS SENSED BY CF-2-LS2 IS <I2.8 FEET REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-2-LII OR CF-2-LI2 o COMPUTER POINT P200 OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL DISCUSSION: l A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES OR i CFT SAMPLE ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. I i
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS2 ^ t O 1 AR-302 Rev. 13 Page 56 I
ENCLOSURE 1 (Page 56 of 61) j ESB ANNUNCIATOR RESPONSE ESA-KW2-08-05 B-08-05 O t CF TANK A j PRESS l HIGH/ LOW i l EVENT POINT 0105 INDICATED CONDITION: o CFT-IA PRESSURE AS SENSED BY CF-1-PSI IS >615 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-1-PIl OR CF-1-PI2 l O OPERATOR ACTIONS FOR A VALID A' ARM: l o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION 1 i i DISCUSSION: [ INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES, OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES l TO RISE. PRESSURE LIMITS ARE ESTABLISHED PER STS, REFER TO STS FOR ADMINISTPATIVE REQUIREMENTS.
REFERENCES:
DPAWING 208-013 SHEET CF-13 l SENSING ELEMENT: CF-1-PSI O AR-302 Rev. 13 Page 57
ENCLOSURE 1 (Page 57 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-05 B-08-05 m CF TANK A PRESS HIGH/ LOW EVENT POINT 0106 INDICATED CONDITION-o CFT-1A PRESSURE AS SENSED BY CF-1-PS2 IS >615 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-1-PIl OR CF-1-PI2 OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD IANK PRESSURES TO RISE. PRESSURE LIMITS ARE ESTABLISHED PER STS, REFER TO STS FOR ADMINISTPATIVE REQUIREMENTS.
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS2 i Q (._/ AR-302 Rev. 13 Page 58
-ENCLOSURE 1 +- (Page 58 of 61) i ESB ANNUNCIATOR RESPONSE ESA-KW2-08-05 B-08-05 '[ O i i CF TANK A PRESS I HIGH/ LOW l EVENT POINT 0107 l INDICATED CONDITION: I o CFT-1A PRESSURE AS SENSED BY CF-1-PSI IS <585 PSIG l i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATORS CF-1-PIl OR CF-1-PI2 I 1 0 OPERATOR ACTIONS FOR A VALID ALARM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION P DISCUSSION: DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE. PRESSURE LIMITS ARE ESTABLISHED PER STS, REFER TO STS FOR ADMINISTRATIVE i REQUIREMENTS. a
REFERENCES:
DRAWING 208-013 SHEET CF-13 l i SENSING ELEMENT: CF-1-PSI i O i i AR-302 Rev. 13 Page 59 I
ENCLOSURE 1 (Page 59 of 61) ESB ANNUNCIATOR RESPONSE ESA-KW2-08-05 B-08-05
- .mg CF TANK A PRESS HIGH/ LOW EVENT POINT 0108 INDICATED CONDITION
o CFT-1A PRESSURE AS SENSED BY CF-1-PS2 IS <585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALAPR: o CONTROL BOARD INDICATORS CF-1-PIl OR CF-1-PI2 OPERATOR ACTIONS FOR A VALID ALAPM: o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION: DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE. PRESSURE LIMITS ARE ESTABLISHED PER STS, REFER TO STS FOR ADMINISTRATIVE REQUIREMENTS. ~
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS2 ] AR-302 Rev. 13 Page 60 4
ENCLOSURE 1 (Page 60 of 61) r~s ESB ANNUNCIATOR RESPONSE ESA-KW2-08-06 B-08-06 CF TANK A DISCH VALVE OPEN/ CLOSED ____E EVENT POINT 0101 INDICATED CONDITION: o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS <700 PSIG AND CFV-S IS NOT FULL CLOSED i REDUNDANT INDICATION WHICH WILL VERIFY ALARM: o CONTROL BOARD INDICATOR RC-158-PI2 AND CFV-5 POSITION INDICATION O OPERATOR ACTIONS FOR A VALID ALARM: o CLOSE CFV-5 OR STOP RCS PRESSURE DECREASE DISCUSSION: CFV-5 MOTOR IS NORMALLY DE-ENERGIZED. THE BREAKER WILL HAVE TO BE CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION.
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: RC-3A-PS3, 33C VALVE CLOSED CONTACT O AR-302 Rev. 13 Page 61
ENCLOSURE 1 i (Pege 61 of 61) 1 ESB ANNUNCIATOR RESPONSE ESA-KW2-08-06 B-08-06 ,q CF TANK A DISCH VALVE OPEN/ CLOSED I EVENT POINT 0102 INDICATED CONDITION: o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS >715 PSIG AND CFV-5 IS NOT FULL OPEN. REDUNDANT INDICATION WWICH WILL VERIFY ALARM: o CONTROL BOARD INDICATOR RC-158-PI2 AND CFV-5 POSITION INDICATION )J OPERATOR ACTIONS FOR A VALID ALARM: o OPEN CFV-5 OR STOP RCS PRESSURE INCREASE DISCUSSION: CFV-5 MOTOR IS NORMALLY DEENERGIZED. THE BREAKER WILL HAVE TO BE CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION. i
REFERENCES:
DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: RC-3A-PS3, 33 VALVE OPEN CONTACT AR-302 Rev. 13 Page 62 (LAST PAGE)
- }}