L AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO.
050-0298 UNIT CNS DATE May 7.
1993 TELEPHONE (402) 825-5766 MONTH April 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
i 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
s 9
0 25 0
J 10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 16 0
f INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each r
day in the reporting month.
Compute to the nearest whole megawatt.
I 4
9305140290 930430 PDR ADOCK 05000298 PDR R
.~
OPERATIONS NARRATIVE COOPER NUCLEAR STATION April 1993 The EOC 15 Refueling Outage began March 5, continuing through the month of April.
Cooper Station had 0.0 percent capacity factor for the month of April.
~
OPERATING DATA REPORT DOCKET NO.
050-0298 1
UNIT CNS i
DATE May 7. 1993 OPERATING STATUS TELEPHONE (402) 825-5766 1.
Unit Name:
COODer Nuclear Station Notes 2.
Reporting Period:
ADril 1993 3.
Ucensed Thermal Power (MWt):
2381 4.
Nameplate Ratmg (Gross MWe):
836 5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 7.
Maximum Dependable Capacity (Net MWe):
764 8.
If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last Report, Give Reasons:
(
9.
Power Level To Which Restricted, if Any (Net MWe):
10, Reasons For Restriction, if Any:
l 5
i r
This Month Yr.-to-Date.
Cumulative 11.
Hours in Reporting Period 7190 2.879 0 165.096.0 l
12.
Number of Hours Reactor Was Critical 0.0 1.526 0 126.493.0 13.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 i
~ 14.
Hours Generator On une 0.0 1.526 0 124,734.9 15.
Unit Reserve Shutdown Hours 00 00 0.0 i
16.
Gross Therma! Energy Generated (tAVH) 00 3,405.552.0 256 249.516.0 t
i 17.
Gross Dectric Energy Generated (MWH) 00 1.134.134 0 83.125.116.0 18.
Net Doctric Energy Generated (MWH) 0.0 1.096.791.0 80.255.107.0
. t 1g.
Unit Service Factor 0.0 53 0 75 6 20.
Unit Avai! ability Factor 00 53.0 75.6 l
21.
Unit Capacity Factor (Using MDC Net) 00 49.9 63.6 22.
Unit Capacity Factor (Using DER Net) 0.0 49.0 62.5 J
23.
Unit Forced Outage Rate 0.0 0.0 4.3 i
.p 24.
Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i 25.
If Shut Down At End of Report Period, Estimated Date of Startup: May 31.1993 26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved iNmAL CRmCAuTv l
INITIAL ELECTRICITY COMMERCIAL OPERATION
~