Provides Further Info Re Current Scope & Technique Being Used to Examine Reactor Vessel Nozzles During Cycle 6 Refueling Outage,In Response to NRC Re Suppl Insps of Reactor Vessel Nozzle & 930401 TS Change 92-16
ML20036A363
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/03/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M85308, TAC-M85309, NUDOCS 9305110131
Download: ML20036A363 (3)


Text

  • .

~,

t r

l i

RA

~

-l Tennessee vaev Aatw. Post once Bar 2cn soanoaw Tenretsee 37379 moo l

i 1

i Robert A Fenech l

vec P ecroent. Sewyah Nucleaf P. ant May 3, 1993 i

i U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 j

Gentlemen:

[

In the Matter of

)

Docket No. 50-327 l

Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PIANT (SQN) - REACTOR VESSEL (RV) N0ZZLE EXAMINATION SCOPE AND TECHNIQUE FOR UNIT 1 l

References:

1.

NRC letter to TVA dated April 16, 1993, " Reactor Vessel Nozzle Supplemental Inspections - Sequoyah Nuclear Plant Units 1 and 2 (TAC Nos. M85308 and M85309)

j 2.

TVA letter to NRC dated April 1, 1993, "Sequoyah Nuclear-Plant (SQN) - Additional Information for Technical l

Specification (TS) Change 92-16, Deletion of TS Surveillance Pequirement (SR) 4.4.10.b - Supplemental i

Exam of Reactor Vessel Nozzles" The purpose of this letter is to provide further information to NRC regarding the current scope and technique that are being used to examine j

SQN's Unit 1 RV nozzles during the Unit 1 Cycle 6 (U1C6) refueling outage.

In Reference 2, TVA submitted a description of the nozzle cold l

crack inspections that would be performed during the UIC6 refueling j

outage and requested that NRC provide confirmation that the scope and

{

technique would be acceptable. During a subsequent telephone conference j

on April 8, 1993 IVA agreed to examine the area of all underclad crack

-l indications that were recorded during the 1980 Unit I nozzle j

examinations. TVA notad that the scope of this examination coverage l

would go beyond the technical specification (TS) requirement.

In Reference 1, NRC indicated that the ultrasonic detection and sizing technique (demonstrated at Southwest Research Institute [SWRI] on March 23, 1993) was satisfactory for inspection of the Unit I reactor ADA 9305110131 930503 C

PDR ADOCK 05000327 v

p PDR

/

i r

O, U.S. Nuclear Regulatory Commission Page 2 May 3, 1993

^

vessel nozzles in accordance with the TS requirements. NRC also stated that, "This technique would be used to detect and characterize (type, depth, length and orientation) any indications found."

TVA is currently in the process of performing the RV nozzle exams on Unit 1.

As stated in an April 21, 1993, telephone conference with NRC, TVA will include in the examination coverage all 61 indications from the 1980 Unit 1 examinations. From these 61 indications, TVA will characterize (i.e., size) 33 underclad cold crack indications if detected, using the SWRI technique. The remaining 28 indications will be characterized if detected and if their amplitude reading is greater than 20 percent of the distance-amplitude correction (DAC). Any new indications (characterized as flaws) that are discovered during the nozzle examinations will be sized if their amplitude reading is greater than 20 percent of the DAC.

Please note that Westinghouse Electric f

Corporation has recently clarified the 1980 nozzle examination data at TVA's request.

It was confirmed that there were 33 underclad cold 1

cracks, 23 underclad reheat cracks, and 5 innocuous indications for a l

total of 61 indications. These numbers update the data previously provided by TS Change 92-16 dated January 8, 1993.

Please direct questions concerning this issue to D. V. Goodin at (615) 843-7734.

i Sincerely, l

f lh h '--d-s/A -

?kht{;f i

Robert A. Tenech l

t t

cc:

See page 2 j

i i

i I

t t

l i

i i

1 l

i 4

~

i U.S. Nuclear Regulatory Commission j

Page 3

)

May 3, 1993 I

cc:

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North i

11555 Rockville Pike j

Rockville, Maryland 20852-2739

.i l

NRC Resident Inspector Sequoyah Nuclear Plant i

2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 l

Regional Administrator U.S. Nuclear Regulatory Commission i

Region II 101 Marietta Street, NW, Suite 2900 t

Atlanta, Georgia 30323-2711 i

i'(

i f

I i

[

L l

f I

i i

-