Forwards Insp Rept 50-382/93-07 on 930221-0408.Violation Noted.Violation Re Failure to Have Adequate Procedure to Verify Emergency Diesel Generator Fuel Oil Chemistry Not Cited
ML20036A280
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/04/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Barkhurst R
ENTERGY OPERATIONS, INC.
Shared Package
ML20036A281 List:
References
NUDOCS 9305110042
Download: ML20036A280 (5)


See also: IR 05000382/1993007

Text

.

. . .

_

_ _

_. .

.

._

. _ .

_

_

_

t['

' UNIVED STATES

l_

y[pR REcqIg

NUCLEAR REGULATORY COMMISSION -

(

[

.j

e

REGloN IV

m :.

!

8

611 RYAN PLAZA DRIVE, SUITE 400

o

!-

%

[

AR LINGToN, TE X AS 76011 8064

.....

i

MAY - 41993

.

!

Docket:

50-382

'

License.

NPF-38

,

l

Entergy Operations, Inc.

ATTN:

R. P. Barkhurst, Vice President

'

Operations, Waterford

P.O. Box B-

Xillona,' Louisiana 70066

SUBJECT: NRC INSPECTION REPORT NO. 50-382/93-07'

f

i

This refers to the inspection conducted by Mr. E.~J. Ford and other inspectors

of this office, during the period February 21 through April 8,1993. The

'

inspection included a review of activities authorized for your Waterford Steam

Electric Station, Unit 3, facility. At the conclusion of the' inspection,.the

j

findings were discussed with those members-of your. staff identified in the

e

enclosed report.

l

1

Areas examined during the inspection are identified in the report. Within

l

these areas, the inspection consisted of selective examinations of procedures

!

and representative records, interviews with personnel, and observations of

?

activities in progress.

Your staff identified a violation of Technical Specification 6.8.1 which

involved a failure to have an adequate procedure-to verify emergency diesel

l

generator fuel oil chemistry and a failure to adhere to the requirements of

)

this procedure. This violation is not being cited because the criteria in

'

L

paragraph VII.B.2 of Appendix C to 10 CFR Part 2 of the NRC's " Rules of

,

l

Practice," were satisfied. -This violation appears to be an isolated

l

occurrence and your staff took prompt and effective actions to correct the

'

j

problem.

{

'

In accordance with 10 CFR Section 2.790 of the NRC's " Rules of Practice," a

l

l

copy of this letter and its enclosures 'will be placed in the NRC Public

j

'

Document Room.

Should you'have any questions concerning this inspection, we will be pleased

L

to discuss them with you.

_

'l 0

A. Bill' Teach,

'

/

r

or

Division of Reacto'

rojects

,

l

l

'

l

.m

9305110042 930504^

PDR

ADOCK 05000382

g

PDR,

. .

.

_

_

.

.

.

.

.

.

E

'

=

1

\\

'

1

~Entergy Operations, Inc.

-2-

Enclosure:

Appendix A - NRC Inspection Report

50-382/93-07 w/ attachment

cc w/ enclosure:

Entergy Operations, Inc.

ATTN: Donald C. Hintz, President

& Chief Operating Officer

P.O. Box 31995

Jackson, Mississippi 39286

!

Entergy Operations, Inc.

l

ATTN: John R. McGaha, Vice President

l

Operations Support

P.O. Box 31995

'

Jackson, Mississippi 39286

'

Wise, Carter, Child & Caraway

ATTN: Robert B. McGehee, Esq.

l

P.O. Box 651

Jackson, Mississippi 39205

,

'

Entergy Operations, Inc.

l-

ATTN:

D. F. Packer, General

,

Manager Plant Operations

P.O. Box B

Killona, Louisiana 70066

Entergy Operations, Inc.

!

ATTN:

L. W. Laughlin

Licensing Manager

P.O. Box B

Killona, Louisiana 70066

Chairman

.

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Entergy Operations, Inc.

i

ATTN:

R. F. Burski, Director

Nuclear Safety

i

'

P.O. Box B

Killona, Louisiana 70066

j

Hall Bohlinger, Administrator

i

Radiation Protection Division

l

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

1

k

.

.. -

, .

- .

-

- . . . - . .

.

.

- - -

-.

- .

.

4 \\

Entergy Operations, Inc.

-3-

!

I

,

'

Parish President

St. Charles Parish

P.O. Box 302

Hahnville, Louisiana 70057

,

Mr. William A. Cross

Bethesda Licensing Office

3 Metro Center

!

Suite 610

Bethesda, Maryland 20814

Winston & Strawn

ATTN: Nicholas S. Reynolds, Esq.

l

1400 L Street, N.W.

.

<

.

Washington, D.C.

20005-3502

,

!

l

!

(

!

!

)

i

si

--

,,

a-

,,,

,n

- , , , ..

n.

-

-- , , , ,

-- --

'

!-

I

l

Entergy Operations, Inc.

-4-

ley - 41993

1

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident inspector

DRP

Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/D)

Section Chief (DRP/TSS)

DRS

A. B. Beach, D:DRP

!

!

!

!

100005

l

ff

RIV:RI

SRI

C:DRP/D

g ' W :D4P

JLDixon-Herrity

EJFord

TFStetka

ach

4/16/93

4/16/93

4/30/93

/93

Ilg

.

'

l

Entergy Operations, Inc.

-4-

MAY - 41993

l

l

l

bcc to DMB (IE01)

l

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

.

DRP

Section Chief (DRP/D)

!

Lisa Shea, RM/ALF. MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/D)

Section Chief (DRP/TSS)

DRS

A. B. Beach, D:DRP

,

1

I

l

/

RIV:RI

SRI

C:DRP/Dk

D1P

'

JLDixon-Herrity

EJFord

TFStetka M

ach

4/16/93

4/16/93

4/30/93

/93