7 May 4, 1993
[DocketNo.50-293 Mr. E. Thomas Boulette, Phd.
t Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360
Dear Mr. Boulette:
SUBJECT:
APPROVAL UNDER 10 CFR 20.302(a) RELOCATION AND PLACEMENT 0F CONSTRUCTION SOIL WITH TRACES OF RESIDUAL RADI0 ACTIVITY ON SITE AT PILGRIM HUCLEAR POWER STATION (TAC NO. 85501)
By letter dated January 15, 1993, you requested approval, pursuant to 10 CFR 20.302(a), to relocate subject material to a different location within the licensee controlled area.
The Commission has reviewed this request and has determined that the proposed' relocation is acceptable.
This approval is granted provided that the enclosed Safety Evaluation is permanently incorporated into your Offsite Dose Calculation Manual as an-Appendix. Additionally, any modifications considered to your approved proposal must have prior Commission approval.
Pursuant to the provisions of 10 CFR 51, the Commission has published in the Federal Reaister the enclosed Environmental Assessment and Finding of No Significant Impact (58 FR 26169).
Sincerely, CarYeb.Nih,IActing Assistant Director for Region I Reactors Division of Reactor Projects I/II i
Office of Nuclear Reactor Regulation
Enclosures:
1.
Safety Evaluation 2.
Environmental Assessment y
g.,y ggp hwa s n.i. cGb s La 9W i!
cc w/ enclosures:
See next page
. DISTRIBUTION:
Docket File JCalvo OGC JLinville,RI NRC & Local PDRs WButler EJordan OGC PDI-3 Reading TClark ACRS (10)
SVarga REaton OPA
- See previous concurrence OFFICE LA:PDI *PM:PDI-3
- 0GC ~
- D:PDI-3' (A)ADRI mE TCl ark REaton:mw Fonner/Brodenick WButler CMiller DATE 4' /26/93 04/21/93 4/22/93
'+04/26/93-
- 4. 76/93-0FFICIAL RECORD COPY FILENAME: A:rm nol.LTR S
0 'f l9305100276 930504 PDR-ADOCK 05000293 P
PDR-1
e.-
~ ;
1,
- - l jt** "'%<%.
4 f.
UNITED STATES --
t
.;j kdf j
NUCLEAR REGULATORY. COMMISSION 3
'
- p
. WASHINGTON, D.C. 20555-0001
- )
I%**'
May 4, 1993 l
e,,,s.
Docket'No'. 50-293-i Mr. E. Thomas Boulette, Phd-6 Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power S*1 tion j
Rocky' Hill Road Plymouth, Massachusetts 02360 t
Dear Mr. Boulette:
r
SUBJECT:
APPROVAL.UNDER 10 CFR 20.302(a) RELOCATION AND PLACEMENT 0F CONSTRUCTION SOIL WITH TRACES OF RESIDUAL RADI0 ACTIVITY ON SITE AT PILGRIM NUCLEAR POWER STATION (TAC NO. M85501)
By letter dated January 15, 1993, you requested approval, pursuant to 10 CFR 20.302(a), to relocate. subject material to a.different location within the :
l
-licensee controlled area.
-The Commission has reviewed this request and has determined that the proposed-relocation is acceptable. This approvalfis. granted provided that the enclosed 4
Safety Evaluation 'is permanently incorporated into.your Offsite Dose-J Calculation Manual as an Appendix. Additionally, any modifications considered
]
to your approved proposal must have prior Commission approval.
.j Pursuant to the provisions of 10 CFR 51, the Commission has-published-in the.
Federal Reaister the enclosed Environmental Assessment and Finding of No.
Significant Impact ~(58 FR 26169).
Sincerely,,
Y a
Charles L. Miller, Acting Assistant Director for Region _I-Reactors:
Division of Reactor _-Projects' I/II-
)
Office of Nuclear Reactor Regulation:
Enclosures:
- 1. - Safety Evaluation 2.
Environmental Assessment cc'w/ enclosures:
See next page l
1 9
,+
us
.e s
F Mr. E. Thomas Boulette Pilgrim Nuclear Power Station 1
CC*
Mr. Edward S. Kraft, Mr..H. Vernon 0heim Vice President of Nuclear Manager, Reg. Affairs Dept.
Operations & Station Director Pilgrim Nuclear Power Station Pilgrim Nuclear. Power Station RfD #1 Rocky. Hill Road RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. David F. Tarantino-Resident Inspector Nuclear Information Manager-1 U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road-Post Office Box 867 Plymouth, Massachusetts 02360
't Plymouth, Massachusetts 02360 Mr. Thomas Rapone Chairman, Board of Selectmen Secretary of Public Safety 1
11 Lincoln Street..
Executive Office of Public Safety Plymouth, Massachusetts 02360 One Ashburton Place Boston, Massachusetts.02108 Office of the Commissioner
+
Massachusetts Department of Mr. David Rodham, Director Environmental Protection Massachusetts Emergency Management One Winter Street Agency' Boston, Massachusetts. 02108 400 Worcester Road
.P.O.-Box 1496 Office of the Attorney General Framingham," Massachusetts 01701-0317:
-One Ashburton Place Attn: -James Muckerheide-1 20th Floor 4
Boston, Massachusetts. 02108
-Chairmen, C.tizens Urging.
i Responsible Energy Mr. Robert M. Hallisey, Director P. O. Box 2621 Radiation Control Program Duxbury,-Massachusetts ~ 02331 Massachusetts Department of Public Health Citizens' at: Risk 305 South Street
.P.- O. Box'3803 Boston, Massachusetts 02130 Plymouth,' Massachusetts 02361 Regional Administrator, Region 1 W. S. Stowe, Esquire U. S. Nuclear' Regulatory Commission Boston Edison Company 475 Allendale_ Road King of Prussia,~ Pennsylvania _
800 Boylston' St., 36th Floor 19406 Boston, Massachusetts 02199' i
.Mr. Paul J. Hamilton
' Licensing Division Manager.
Boston Edison Company 25 Braintree. Hill Park Braintree, Massachusetts 02184-
- n
}