ML20035H751
| ML20035H751 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/29/1993 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML20035H752 | List: |
| References | |
| NUDOCS 9305070005 | |
| Download: ML20035H751 (3) | |
See also: IR 05000220/1993003
Text
.
gc}
,
APR 29 %
-
Docket Nos. 50-220
50-410
Mr. B. Ralph Sylvia
Executive Vice President - Nuclear
Niagara Mohawk Power Corporation
301 Plainfield Road
Syracuse, New York 13212
Dear Mr. Sylvia:
Subject:
NRC Region I Combinal Inspection Repod No. 50-220/93-03 and
50-410/93-02
This refe4s to the results of the routine resident safety inspe::tica conducted by Messrs.
R. Plasse, W. Mattingly, and W. Schmidt from February 28 through April 10, 1993, ai Nine
_
Mile Point Units 1 and 2, Scriba, New York. Mr. Plasse discussed the inspection findings with
members of your staff at the exit meeting conducted on April 22,1993.
This inspection was directed toward areas important to public health and safety. The enclosed
NRC Region I Inspection Report describes the areas examined during the inspection. Within -
these areas, the inspection consisted of observation of activities in progress, interviews with
personnel, and selective examinations of procedures and representative records.
Your staff conducted refueling autage activities at Unit 1 and operated Unit 2 safely over the
period. Management involvement in the day-to-day operation of both units continues to be a
strength. The quality of engineering and management involvement in the daily conduct of the
Unit 1 outage activities ensured proper resolution ofidentified safety concerns. Also noteworthy
was the performance of Unit 2 personnel during several planned power reductions and one
unplanned plant transient. Both the operations and maintenance staffs demonstrated excellent
attention-to-detail and proper safety perspective during these events.
@ (i093
OFFICIAL RECORD COPY
a:IR9303.02
9305070005 930429
ADOCK 05000220
h
0
!
_____-__
4
l
-
I
.
Mr. Ralph B. Sylvia
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
,
its enclosures will be placed in the NRC Public Document Room.
Your cooperation with us is appreciated.
'
Sincerely,
,
1
t
l
l
'
A. Randolph Blough, Chief
Projects Branch No. 4
Division of Reactor Projects
Enclosures:
1.
NRC Region I Combined Inspection Report Nos. 50-220/93-03 and 50-410/93-02
l
i
cc w/ encl:
,
l
C. Terry, Vice President - Nuclear Engineering
l
J. Perry, Vice President - Qaality Assurance
l
Vice President - Nuclear Generation
.
K. Dahlberg, Unit 1 Plant Manager
1
M. McCormick, Unit 2 Plant Manager
l
D. Greene, Manager, Licensing
J. Warden, New York Consumer Protection Branch
l
G. Wilson, Senior Attorney
M. Wetterhahn, Winston and Strawn
Director, Energy & Water Division, Department of Public Service, State of New York
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
K. Abraham, PAO (2) All Inspection Reports
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, SLO Designee
l
!
l
l
OFFICIAL RECORD COPY
a:IR9303.02
--
-
'
.
.
Mr. Ralph B. Sylvia
3
bec w/ encl:
Region I Docket Room (with concurrences)
bec: (VIA E-MAIL)
V. McCree, OEDO
R. Capra, NRR
J. Menning, NRR
D. Brinkman, NRR
r
i
RI:DRPf; I
RI:DR
RI:DRP
i
WSchmidt
LBrig -
RBlough
p
4/ ' 3
4Ml93
48/Y93
I
OFFICIAL RECORD COPY
a:IR9303.02