Forwards Safety Evaluation Granting Relief from ASME Section XI Requirements for VT-2 Visual Exam of Class 2 Piping Associated W/Containment Penetration Numbers 30,31,33 & 34 Per 10CFR50.55a(g)(6)(i)
ML20035H122
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/26/1993
From: Hannon J
Office of Nuclear Reactor Regulation
To: Shelton D
CENTERIOR ENERGY
Shared Package
ML20035H123 List:
References
TAC-M77588, NUDOCS 9305030170
Download: ML20035H122 (4)


Text

-,

.~_. _ _ _..

/

UNITED STATES

..j M.j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 205664001

\\[

,8 April 26, 1993 Docket No. 50-346 Mr. Donald C. Shelton, Vice President Nuclear - Davis-Besse Centerior Service Company c/o Toledo Edison Company i

300 Madison Avenue l

Toledo, Ohio 43652

Dear Mr. Shelton:

l

SUBJECT:

RELIEF FROM ASME SECTION XI REQUIREMENTS FOR VT-2 VISUAL EXAMINATION 0F CLASS 2 PIPING ASSOCIATED WITH CONTAINMENT PENETRATION NOS. 30, 31, 33, AND 34 (TAC NO. M77588) i By letter dated September 28, 1990, Toledo Edison Company requested relief

^

from the ASME Boiler and Pressure Vessel Code,Section XI, requirements for visual examination of portions of Class 2 piping associated with containment i

penetration nos. 30, 31, 33, and 34 at the Davis-Besse Nuclear Power Station, 4

Unit No. I for the first ten-year inservice inspection interval. Guardpipes,

/

rubber foam barriers, and rubber boots prevent access necessary to perform

~!

VT-2 visual exaraination of the containment purge piping associated with containment pen'etration nos. 33 and 34. Similarly, guardpipes inhibit performance of *a VT-2 visual examination of containment penetration nos. 30 and 31. The NRC staff has completed its review of this request. A copy of the Safety Evafuation is enclosed.

Based on our review, we have determined that the VT-2 visual examination of the subject containment purge lines is impractical to perform to the extent required by the Code and that granting relief is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest.

In making this determination, we have given due consideration to the burden that would result if the Code requirement were imposed on your facility.

a i

t 3

i p

l 290033

=

h' gy i;A 9305030170 930426 n

ADOCK0500g6 DR 0

I

Mr. Donald C. Shelton April 26, 1993 The relief is granted as requested to 10 CFR Part 50.55a(g)(6)(1) for the first ten-year interval of the inservice inspection program.

Sincerely,

~h John N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc: See next page I

Mr. Donald C. Shelton April 26,1993 The relief is granted as requested to 10 CFR Part 50.55a(g)(6)(i) for the first ten-year interval of the inservice inspection program.

Sincerely, Allen G. Hansen/for John N. Hannon, Director Project Directorate III-3 Division of Reactor Projects - IllilViV Office of Nuclear Reactor Regulation

Enclosure:

4 Safety Evaluation cc: See next page DISTRIBUTION Docket File NRC & Local PDRs PDIII-3 r/f PDIII-3 Gray T. Murley J. Partlow E. Rossi J. Lieberman i

J. Roe J. Zwolinski J. Hannon J. Hopkins M. Rushbrook OGC E. Jordan ACRS (10)

G. Hill (2)

OPA OCiLFDCB G. Grant E. Greenman, RIII J. Strosnider J

LA:P A14-3 PM:PDIII-3 s,4 f-lf D:PDIII-3,yd OGC MR

&#bok JHopkins:sw J

i,,'

der JHannon sn

.i,,,,,

<i ci,,

<i,i,,

<i,i,,

<i 1

l

b Mr. Donald C. Shelton Davis-Besse Nuclear Power Station Toledo Edison Company Unit No. 1 cc:

Mary E. O'Reilly Centerior Energy Corporation Radiological Health Program 300 Madison Avenue Ohio Department of Health Toledo, Ohio 43652 Post Office Box 118 Columbus, Ohio 43266-0149 Mr. Robert W. Schrauder Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General i

300 Madison Avenue 30 East Broad Street Toledo, Ohio 43652 Columbus, Ohio 43215 Mr. James W. Harris, Director Gerald Charnoff, Esq.

Division of Power Generation Shaw, Pittman, Potts Ohio Department of Industrial Regulations and Trowbridge P. O. Box 825 2300 N Street, N.W.

Columbus, Ohio 43216 Washington, D.C.

20037 Regional Administrator, Region III Ohio Environmental Protection Agency U.S. Nuclear Regulatory Commission DERR--Compliance Unit 799 Roosevelt Road AlTN: Zack A. Clayton Glen Ellyn, Illinois 60137 P. O. Box 1049 Columbus, Ohio 43266-0149 Mr. Robert B. Borsum Babcock & Wilcox President, Board of Ottawa Nuclear Power Generation Division County Commissioners 1700 Rockville Pike, Suite 525 Port Clinton, Ohio 43452 Rockville, MD 20852 Resident Inspector State of Ohio V. S. Nuclear Regulatory Commission Public Utilities Commission 5503 N. State Route 2 180 East Broad Street Oak Harbor, Ohio 43449 Columbus, Ohio 43266-0573 Mr. Murray R. Edelman Mr. James R. Williams Executive Vice President -

State Liaison to the NRC Power Generation Adjutant General's Department Centerior Service Company Office of Emergency Management Agency 6200 Oak Tree Boulevard 2825 West Granville Road Independence, Ohio 44101 Columbus, Ohio 43235-2712

.