Forwards Physical Security Program Insp Repts 50-277/93-07 & 50-278/93-07 on 930322-26.No Violations Noted
ML20035G953
Person / Time
Site: Peach Bottom  
Issue date: 04/21/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20035G954 List:
References
NUDOCS 9304300219
Download: ML20035G953 (4)


See also: IR 05000277/1993007

Text

_ _ C>c $

.

.

gegignatedgC giginal j

Mh0A6EurO W

Nanh

>

v

1% i1

1993

Docket Nos. 50-277

50-278

Mr. D. M. Smith

Senior Vice President - Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

P.O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

Subject:

Combined Inspection Nos. 50-277/93-07 and 50-278/93-07

This letter refers to the physical security program inspection conducted by Mr. A. Della Ratta

of this office on March 22-26,1993, of activities authorized by NRC License Nos. DPR-44 and

_

DPR-56 at the Peach Bottom Atomic Power Station (PBAPS), Delta, Pennsylvania, and to the

'

discussion of our findings held with Mr. K. Powers, and other members of your staff by

Mr. Della Ratta at the conclusion of the inspection. This inspection also included a review of

a Fitness-for-Duty situation for which you provided us information in a November 17, 1992,

,

letter. That review was conducted by Mr. R. Albert, of this office, at your offices in Wayne

and Philadelphia, Pennsylvania, on March 25-26, 1993. Mr. Alben's findings were discussed

by telephone with Mr. D. Sarley of your staff on March 30,1993.

Areas examined during the inspection are important to public health and safety and are described

)

in the NRC Region I inspection repon which is enclosed with this letter. The inspection

consisted of selective examinations of procedures and representative records, interviews with

personnel and observations by the inspectors.

Additionally, your actions to resolve two

Inspector Followup Items opened during the previous physical security inspection, conducted on

August 31 - September 4,1992, were examined and closed.

We found that your physical security and FFD programs are effective and directed toward

assuring public health and safety. Management support for both programs was evident. . No

safety concerns or violations of regulatory requirements were identified.

l

1

A section of the enclosed inspection report contains details of your security program that have

j

been determined to be exempt from public disclosure in accordance with 10 CFR 73.21

i

(Safeguards Information). Therefore, that section will not be placed in the NRC Public

I

OFFICIAL RECORD COPY

A:PB9307SG.CIR

April 20,1993

9304300219 930421

I.

-

PDR

ADOCK 05000277

l

)

.

O

PDR

.

.

.

!

Gil 21 199

'

Philadelphia Electric Company

2

Document Room and will receive limited distribution. This letter and the remaining sections of

the inspection report will be placed in the Public Document Room in accordance with

10 CFR 2.790(a).

[

No response to this letter is required. Your cooperation with us is appreciated.

Sincerely,

originalsigned By:

James H. Joyner

. Tames H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

.

'

and Safeguards

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-277/93-07 and 50-278/93-07

(Contains Safeguards Information (SGI) in Paragraph 5.2)

OFFICIAL RECORD COPY

A:PB9307SG.CIR

April 20,1993

i

,

..

.

.

.

Philadelphia Electric Company

3

cc w/enci (w/o SGI):

D. Smith, Senior Vice President - Nuclear

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Vice President, Nuclear Services Department

G. Cranston, General Manager, Nuclear Engineering Division

J. Doering, Chairman, Nuclear Review Board

i

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

K. P. Powers, Plant Manager, Peach Bottom Atomic Power Station

A. Wasong, Manager, Experience Assessment, Peach Bottom Atomic Power Station

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department, Atlantic Electric

B. Gorman, Manager, External Affairs

R. McLean, Power Plant Siting, Nuclear Evaluations

'

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

D. Poulsen, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

TMI - Alert (TMIA)

G. Rombold, Manager, Nuclear Safety and Security

K. Abraham, PAO (2)

!

Public Document Room (PDR)

-

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Pennsylvania

cc w/ encl (w/SGI):

'

NRC Resident Inspector

t

-

i

i

OFFICIAL RECORD COPY

A:PB9307SG.CIR

April 20,1993

.

.

.

.

7

Philadelphia Electric Company

4

bec w/enci (w/o SGI):

Region I Docket Room (with concurrences)

J. Joyner, DRSS

E. Wenzinger, DRP

,

C. Anderson, DRP

B. Norris, DRP

J. Shea, NRR

C. Miller, PDI-2, NRR

'

DRS/EB SALP Coordinator

V. McCree, OEDO

M. Johnson, EDO

,

R. Martin, NRR

D. McGuire, Region II

J. Creed, Region III

B. Murray, Region IV

M. Schuster, Region V

B. Grimes, NRR/DRIS

P. McKee, NRR/RSGB

L. Bush. NRR/RSGB

-

G. McPeck, NRR/RSGB

l

,

!

i

RI:DRSS

RI:DRSS

RI:

S'

RI:DRSS

Della Ratta/ tmh

Albert

'J

9er

,

^h A

0

\\

(R

l

04/2 /93

04/ S 93

04////93

04/7//93

I

OFFICIAL RECORD COPY

A:PB9307SG.CIR

April 20,1993

1

.

.

  • "

,

,