ML20035G806
| ML20035G806 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/09/1993 |
| From: | Merschoff E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Watson R CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 9304300043 | |
| Download: ML20035G806 (3) | |
Text
.
.i APR 9 1993 7
O Docket Nos. 50-325, 50-324 b
License Nos. DPR-71, DPR-62 Carolina Power and Light Company ATTN: Mr. R. A. Watson Senior Vice President Nuclear Generation P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
BRUNSWICK UNIT 2 RESTART ISSUES On January 22, 1993 and March 10, 1993, Carolina Power & Light Company (CP&L) requested that Emergency Diesel Generator (EDG) No. I testing requirements and the methodology for establishing corrective actions as pre-or post-startup, respectively, be revised.
We have evaluated your su'm.. ttal on EDG No. I and are satisfied that its crankshaft is adequate to meet its intended function.
Further, your root cause analysis of the damaged components and their repair is satisfactory, and the performance of a 24-hour reliability run on EDG No.1 is acceptable.
i l
We have also reviewed your changes to Brunswick Nuclear Plant Procedure PN-30, Integrated Recovery Methodology. We concur that the changes to the procedure will still provide an adequate review and approval process for the unit's backlog of items.
1 Furthermore, we have reviewed your Unit 2 Startup and Power Ascension Perfor-mance Cbjectives and Management P un.
We concur with your Logic Plan of Assessment Hold-points and Decision Points. As discussed in the April 5,1993 meeting, you will obtain concurrence of the Regional Administrator prior to proceeding past each assessment hold-point.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, Original signed by:
l Jon R. Johnson /for Ellis W. Herschoff, Director Division of Reactor Projects cc:
(See page 2) l 290104 I Dj 9304300043 930409 PDR ADOCK 05000324 P
. ~ _ _
i Ng e i993
)
. Carolina Power and Light Company 2
1 cc:
R. A. Anderson Ms. Gayle B. Nichols Vice President Staff Counsel i
Brunswick Nuclear Project SC Public Service Commission P. O. Box 10429 P. O. Box 11649 Southport, NC 28461 Columbia, SC 29211 i
M. Brown Plant Manager Unit 1 Brunswick Steam Electric Plant P. O. Box 10429 i
Southport, NC 28461 1
C. Warren i
Plant Manager Unit 2 Brunswick Steam Electric Plant l
P. O. Box 10429 Southport, NC 28461 Mr. Mark S. Calvert Associate General Counsel i
Brunswick Steam Electric Plant P. O. Box 10429 a
Southport, NC 28461 f
' Kelly Holden l
Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment, Health & Natural Resources P. O. Box 27687 Raleigh, NC 27611-7687 H. A. Cole Special Deputy Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC 27626-0520 bcc:
(See page 3)
l 1
.. b A 'ri 9 1993 Carolina Power and Light Company 3
bcc: Document Control Desk H. Christensen, RII P. Milano, NRR l
NRC Resident Inspector U.S. Nuclear Regulatory Commission Star Route 1, Box 208 Southport, NC 28461 l
l l
l l
l l
i RII:DRP RII:DRP RII:DRP rih.:DRP tj HCh sen DV r 111 J o)nson 04/7/93 04/'/93 04/ /93 04/'j /93 I
l