Text
-.
MWNWWWNWWWNA%WWWWW61,%%%WW6WW6444dffffWgg(lygig
/
Occument Control Desx 016 Phillips C
- AMSMIT'AL 70:
~
d 3
ADVANCED CCPY TO:
The Public Occument ocem c
3 3
3 ATE:
C C
3 SECY Correspondence & Recoros Branen g
FROM:
g 3
3 G
u Attacnec are ccoies of a Comission meeting transcript and related meeting 3
dccument(s).
They are being forwarced for entry on the Daily Accession List and 2
No other cistribution is recuested or placement in the Public Occument Room.
G Q
recuirec.
MM@
M?v' Seeting
Title:
Ahnuw g
u l
Mkb Open
)/
Closec Meeting Date:
5 a
3 Copies 5
Item Cescription*:
,[
5 Advanced DCS h
to POR Cg
(
g 8:
h; 1
1 g
- 1. TRANSCRIPT V
YL4 JAA 0 h A Af
_s 3
9
/
a g
g 2.
C cb l
E l
3-7
=>
=5 E
C Ci:
4*
3
%:E 5
55 c
E 5
- t
~ -
9304280096 930422
~*
()
[
- POR is advanced one copy of each document two of each SECY paper.
h C&R Branch files the original transcript, with attachments, witheut SECY 4
c
=;;:
- acers.
hl 2'O 1/AK /
- 1111 t MMMMMMMM- ---=====---- M a1 11111ana um1=manaimaa,1,1,ia
(
l r
UNITED STATES OF AMERICA 1
t NUCLEAR REGULATORY COMMIS SION i
l
.I i
t Sk$O*.
BRIEFING ON DESIGN BASIS THREAT REEVALUATION
.i
(
l LOCatiODl ROCKVILLE, MARYLAND f
i
?
hd(6l APRIL 22. 1993
.i
-i Pa06S:
83 PAGES k
~?
NEALR.GROSSANDC0.,INC.
j
)
count-arrontras Ano taawscatstas 1323 Rhode-Island Avenue, Northwest.
Washington, D.C.
20005:
i (202) 234-4433
- i i
t i
i I
DISCLAIMER I
This is an tinofficial transcript of a meeting of the United States Nuclear Regulatory Commission held on April 22, 1993, in the Commission's. of fice at One White Flint North, Rockville, Maryland.
The meeting was open to public attendance and observation.
This transcript has not been reviewed, corrected or edited, and it may contain inaccuracies.
~
The transcript is intended solely for general informational purposes.
As provided by 10 CFR 9.103, it is not part of the formal or informal record of decision of the matters discussed.
Expressions of opinion in this i
transcript do not necessarily reflect final determination or beliefs.
No pleading or other paper may be -filed with the Commission in any proceeding 'as the result of, or
~
t addressed to, any statement or argument contained herein, j
i except as the Commission may authorize.
j a
NfAL R. GROS $
couaf ateoefft$ AND TRANSCR$th$
I 1313 AHoDI t$ LAND AYtNut, N.W.
J (202) 234 4433-WASHIN6 ton. 01 2000$
' (202) 232-6600
i 1
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION e
BRIEFING ON DESIGN BASIS THREAT REEVALUATION PUBLIC MEETING Nuclear Regulatory Commission One White Flint North Rockville, Maryland Thursday, April 22, 1993 i
The Commission met in open
- session, pursuant to
- notice, at 2:35 p.m.,
Ivan
- Selin, e
Chairman, presiding.
i f
COMMISSIONERS PRESENT:
IVAN SELIN, Chairman of the Commission.
t KENNETH C. ROGERS, Commissioner
[
JAMES R. CURTISS, Commissioner FORREST J. REMICK, Commissioner E. GAIL de PLANQUE, Commissioner
?
l NEAL R. GROSS
' COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON. D C. 20005 (202) 2344 433
2 STAFF AND PRESENTERS SEATED AT THE COMMISSION TABLE:
SAMUEL J.
CHILK, Secretary WILLIAM C.
PARLER, General Counsel JAMES TAYLOR, Executive Director for Operations ROBERT BERNERO, Director, NMSS FRANK MIRAGLIA, Deputy Director, NRR ROBERT BURNETT, Director, Division of Safeguards &
Transportation, NMSS FRANK
- CONGEL, Director, Division of Radiation Protection and Emergency Preparedness, NRR i
PAUL LEVENTHAL, President and Executive Director, Nuclear Control Institute DAN HORNER, Deputy Director, Nuclear Control Institute ELDON V.C.
GREENBERG, Counsel to Nuclear Control Institute n
(
T NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS '
1323 RHODE ISLAND AVENUE, N W.
. (202) 2344433 WASHINGTON, D.C. 20005 (202) 234-4433
3 1
P-R-O-C-E-E-D-I-N-G-S 2
2:35 p.m.
3 CHAIRMAN SELIN:
Good afternoon, ladies 4
and gentlemen. The Commission is meeting at this time 5
to receive a briefing on the reevaluation of the 6
design basis threat.
7 Mr. Leventhal, please have a seat.
8 Following the intrusion at the Three Mile 9
Island facility and the bombing of the World Trade 10 Center, the Commission requested the staff reevaluate 11 and update if necessary the design basis threat for a 12 vehicle intrusion and the use of vehicular bombs.
13 The briefing this afternoon will occur in 14 two sections.
First there will be a public meeting 15 and after that a closed meeting where more specific 16 security information will be discussed.
17 I wish to assure the crowd that the closed 1
18 meeting really does go into more specific information i
19 and nothing more than that.
The essence of the staff 20 presentation will be given at the public meeting.
21 This is a means, first, for our invited 22 witnesses, the NCI, to discuss their views and then I
^
23 for the staff to explain directly to the Commission 24 what options are being considered.
By this means the 25 Commission hopes to gain a better understanding of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 234-4433 WASHINGTON D.C. 20005 (202) 234-4433
4 1
staff recommendations.
2 The Nuclear Control Institute, which has 3
requested to address the Commission, will present to 4
us their views first.
I understand copies of the 5
viewgraphs are available at the entrance to this room.
6 Do any of the other Commissioners have any 7
opening remarks?
8 Mr. Leventhal, we welcome you and your 9
colleagues here and you may proceed.
10 MR. LEVENTHAL:
Thank you very much, Mr.
11 Chairman, and also the members of the Commission.
r 12 We thank you for this opportunity to 13 present the views of both the Nuclear Control 14 Institute and the Committee to Bridge the Gap on the 15 need, as we see it, to require protection of nuclear 16 power plants against truck bombs and other forms of 17 vehicular attack.
l 18 As you know, we've been petitioning the 19 Commission to take such action over the better part of 20 the past decade and we do appreciate your willingness 21 to hear our views today and we hope to seriously l
l 22 consider our appeal to take the requested action now.
i l
23 As I said, we have been making these j
24 appeals to the Commission on a pretty regular basis 25 since 1985 actually and my Institute established a --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
(202) 234-4433 WASHINGTON, D.C. 20005 (202) 2344433 l
5 5
1 first held an international conference on prevention r
2 of nuclear terrorism and then convened a task force 3
with representatives of over nine countries looking at 4
various aspects of this rather troublesome problem.
5 One of the issues looked at was the importance of 6
establishing denial of access at nuclear power 7
facilities, denial of access being the best defense.
8 We've consistently over the years with the Committee 9
to Bridge the Gap, in their testimony before the 10 Advisory Committee on Reactor Safeguards and our 11 letter to the Commission at the time of a specific 12 nuclear threat made over Radio Tehran at the time when 13 the U.S.
was possibly prepared to knock out the 14 Stuttgart missile batteries to the time of the Gulf j
15 War when again we perceived a possible threat to 16 nuclear facilities.
We've just been doing this for 17 some time and we hope, as I will testify now, that 18 recent events will make it clear that such action is 19 indeed warranted.
20 As we stated in our recent communications 21 with Chairman Selin, as well as in Senate testimony on 22 March 19, our position is as follows:
1 i
~
23
- One, current security requirements at 24 nuclear power plants are inadequate to protect against 25 vehicle bombs because vehicular attack is not included NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W, (202) 234 4433 WASHINGTON. D.C. 20005 (202) 2344433
]
6 1
in the design basis threat for radiological sabotage.
2 Second, recent events have made clear that 3
such attacks are credible and that the Commission 4
cannot rely on sufficient advance warning to put 5
protective measures in place.
6
- Third, the Commission must therefore 7
promptly mandate permanent measures to upgrade 8
security at licensed reactors.
9 We're encouraged by the Commission's March 10 1 directive on reevaluation of a design basis threat 11 and the staff's March 11 action plan is encouraging, 12 but in our view they do too little, too slowly and 13 provide no assurance of real reform at the end of the 14 process.
We think that the one year time line built l
15 into the plan is excessive given the potentially l-16 catastrophic consequences of a truck bomb attack and 17 the feasible and relatively inexpensive measures that 18 can be put into place quickly to prevent such an 19 attack.
20 The issue has been before the Commission 21 for a decade, since the truck bombings of the U.S.
22 Embassy and the military compound in Beirut. There is 23 no reason after the TMI and the World Trade Center i
l-24 incidents here in this country for further delay in 25 acting to protect our reactors against vehicular 1
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON, D.C. 20005 -
(202) 234 4433
7 1
attacks.
We emphasize and wish to stress that the 2
action plan you have-before you does not preclude the 3
Commission's acting more expeditiously than within the 4
one year time frame that's laid out in that plan and 5
we ask the Commission to seize the opportunity today 6
to issue an immediately effective rule modifying the 7
design basis threat to include vehicular attack in 8
ordering utilities to proceed immediately with 9
installation of permanent roadway barrier and 10 perimeter denial systems.
11 The other elements of upgrading the design 1.2 basis threat, namely increasing the number of presumed 13 attackers, the capability of their armaments and the 14 level of insider assistance to be protected against, 15 all of those can be considered in accordance with the 16 time line of the March 11 action plan.
But we wish to 17 emphasize the importance that we place on immediately 18 effective rule to first of all acknowledge that 19 nuclear power plants can be attacked with a vehicle 20 and, secondly, to require utilities to put in the l
21 basic defenses that would make such attacks virtually 22 impossible.
Talk about simple physical barriers that 23 have been costed out for the Commission on previous 24 occasions.
25 You're familiar with the Sandia National s
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS
[
1323 RHODE ISLAND AVENUE N W.
(202) 234 4433 WASHINGTON, D.C. 20005 (202) 2344433
8 1
Laboratory's report that was commissioned by the NRC 2
in 1984 after the Beirut bombings and the non-3 classified summary of that report which states that 4
the results show that unacceptable damage to vital 5
reactor systems could occur from a relatively small l
6 charge at close distances and also from larger but 7
still reasonable sized charges at large setback 8
distances greater than the protected area of most 9
plants.
A second report from Sandia was prepared on 10 the variety of counter measures that could be used and 11 SECY-86-101 that same year estimated that a vehicle 12 denial system for roadway access would cost about 13
$100,000.00 to
$200,000.00 for a
facility and 14
$10,000.00 to $20,000.00 annual to maintain while a 15 perimeter access denial system would only cost 16
$500,000.00 to $1 million to install and $25,000.00 to 17
$50,000.00 annually to maintain.
18 Chairman Selin, you cited similar figures 19 in your Senate testimony of March 19.
1 20 Now, past Commissions have chosen not to 21 upgrade the design basis threat on the grounds that a 22 truck bomb attack in the United States was not 23 credible, that there was no specific credible threat l
24 against nuclear facilities and if such a threat l
25 materialized there would be sufficient advance warning l
l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON, D C. 20005 (202) 2344433
1 to take appropriate preventive measures.
2 We believe that these claims were 3
dramatically debunked by the surprise truck bomb i
i 4
attack on the World Trade Center on February 26th and 5
by the letter received by the New York Times which, 6
according to published reports, has been linked by 7
federal investigators to defendants in the case.
As 8
you know, that letter, in the name of the Liberation 9
Army 5th Battalion, included a threat against " nuclear 10 targets" and claimed "more than 150 suicidal 11 soldiers."
12 This incident, on top of the Three Mile 13 Island incident in which a
demented terrorist 14 successfully penetrated a plant and brought his 15 vehicle within the "close distances" required to 16 conflict " unacceptable damage" with a "relatively 17 small charge," to use the terms of the 1984 Sandia 18 studr.
We believe that this event, in combination 19 with the TMI event, should make the required action by 20 the Commission quite clear and we remain puzzled as to
?
21 why the Commission will not act more promptly to close 22 what we regard to be an obvious vulnerability.
23 Chairman Selin, you yourself indicated 24 that had the motorist been transporting explosives, 25 that he could have damaged safety and emergency NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N.W.
(202) 2344433 WASHINGTON, O C. 20005 (202) 234 4433
10 1
systems and, to use your words, and then you're 2
skating on very thin ice.
We submit that the 3
Commission really does not know just how thin the ice 4
was at TMI or is at other reactors, or to put it 5
another way, how deep is defense in depth without 6
applying the IPEEE program to apply to radiological 7
sabotage.
8 For this reason, we believe that an 9
enhanced implementation of the IPEEE program, one that 10 examines the ability of vital systems to withstand 11 credible explosions, should be among the items in the 12 ongoing reevaluation of the design basis threat.
13 Because a single explosion could destroy multiple 14 safety systems, examples of which we specified in the 15 annex to our original request for action for an IPEEE l
t 16 program applying to this particular danger, we believe l
17 that IPEEE is an essential corollary to upgrading the 18 design basis threat.
I 19 My testimony goes on to cite the 20 chronology laid out in the Incident Investigation 21 Team's report on the TMI intrusion and to point out 22 that -- what should be obvious in the report, which is 23 that both TMI and NRC personnel failed to considered 24 promptly the possibility of radiological sabotage.
25 But, of course, we note that they were not required to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
l (202) 234-4433 WASHINGTON. D C. 20005 (202) 234-4433 I
I
11
.~.
consider the possibility of a vehicle bomb since that 2
possibility is not included in the design basis 3
threat.
4 In short, personnel were not prepared for S
the possibility of radiological sabotage and more than 6
two hours elapsed before they even checked for a bomb 7
and a total of four and a half hours passed before 8
explosives were finally ruled out by the experts.
9 We support the action taken by General 10 Public Utilities.
They obviously read the writing on 11 the wall, realized the extent to which their plant was 12 vulnerable or, to put it another.way, how lucky they i
13 are that Mr. Nye did not carry explosives in his car.
14 We believe the NRC should take its cue from GPU and
)
i 15 promptly upgrade the design basis threat to protect 16 against such attacks without waiting to see whether 17 one materializes, whether a
truck bomb attack 18 materializes at a domestic nuclear power plant.
19 None of the Commission's past reasons for 20 refusing to act can be plausibly ' defended by this 21 Commission today.
A vehicular intrusion has occurred 22 at an operating nuclear power plant.
A successful 23 truck bomb attack has taken place in. the United 24 States.
There was no advance warning in either case 25 and there is now a specific and credible threat NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON, D C. 20005 (202) 2344433 w
12 1
against nuclear facilities.
Under such compelling 2
circumstances, continued inaction by the NRC would be 3
imprudent and would endanger the public health and 4
safety and the common defense and security of the 5
United States, both of which it is your mission to 6
protect under the Atomic Energy Act.
7 So, we asked the Commission today to adopt 8
an immediately effective rule upgrading the design 9
basis threat to include attacks with a vehicle.
We 10 asked the Commission to order licensees to immediately r
11 erect roadway barrier and perimeter denial systems.
12 We asked the Commission to implement an IPEEE program 13 to determine the ability of vital systems to withstand 14 credible explosions, and we asked that you vote to 15 take these actions today before the conclusion of this 16 meeting.
7 17 There's no question that the NRC's own 18 rulemaking procedures permit the Commission to take 19 such action by means of an immediately effective rule l
20 if it finds that for good cause the usual notice and 21 comment are " impractical or impracticable or contrary 9
22 to the public interest." We submit that to delay any 23 longer taking the basic measures needed to address the
~
24 obvious vulnerability of nuclear power plants to truck 25 bomb attacks is both impracticable and contrary to the t
i NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE N W.
(202) 2344433 WASHINGTON, D.C. 20005 (202) 2344433 i
13 1
public interest.
2 We thank you again for this opportunity to 3
express our views and I and my associates, Eldon 4
Greenberg, our counsel, and Daniel Horner, our Deputy 5
Director, would be pleased to answer any questions you 6
might have.
t 7
CHAIRMAN SELIN:
Thank you for your 8
presentation.
Thank you for a
well prepared 9
presentation. You stayed within the time limits.
You 10 even quoted me accurately.
I thank you for that.
11 I'll turn to Commission Rogers first.
Do t
12 you have questions for the witnesses?
13 COMMISSIONER ROGERS:
Well, do you have 14 any knowledge of what's happening in any other Western j
15 countries that have commercial nuclear power programs 16 that perceive a growing and credible threat of this 17 sort? What is your information with request to other t
18 situations in other countries?
19 MR. LEVENTHAL: I do not know what they're 20 doing in the current circumstances.
There have been 21 threats made by the Serbs actually, a couple of i
22 threats made by the Serbs to attack European nuclear 23 power plants in the event that there were military 24 intervention in the former Yugoslavia.
But it is my 25 understanding that use of a vehicle is contemplated in
+
1 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS I
1323 RHODE ISLAND AVENUE, N W.
l (202) 234 4433 WASHINGTON, D C. 20005 (202) 2344433
14 1
1 preparing the defenses for those plants.
I visited 2
plants in Germany and in Japan, two nations that come 3
to mind, and it's obvious that they have the kinds of 4
barriers in place that have attacked by vehicle rather 5
than attacked with sneakers in mind.
Whether they're 6
on a heightened state of alert today because of this 7
situation in the U.S. with the World Trade Center or j
8 because of the Serbian situation, I don't know, but I 9
think the point is that those plants are better 10 protected against vehicular attack than U.S.
plants.
11 COMMISSIONER ROGERS:
Thank you.
12 COMMISSIONER REMICK:
If you have any 13 specific information on what you just stated, I would 14 appreciate receiving it.
15 MR. LEVENTHAL:
Okay.
Thank you.
16 COMMISSIONER CURTISS:
I just have two or 17 three areas I'd like to explore.
i 18 I take it from your recommendation that we l
19 move forward with immediate action, an immediately 20 effective rulemaking to a rule to address what you see 21 as the problem.. Do I correctly infer from that that I
l 22 in the context of the procedures that we've I
l 23 established for backfits, if you applied those here, l
24 that you would view this as an adequate protection 25 question, action ought to be taken to protect the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 2344433 WASHINGTON, D C. 20005 (202) 2344433
r 15 1
public health and safety today immediately and it
\\
2 ought to be done irrespective of the cost?
3 MR. LEVENTHAL: In other words, taking the 4
cost effective factor into consideration? Is that the 5
thrust of your question?
6 COMMISSIONER CURTISS:
Let me phrase it 7
differently.- Under the regime that we have, we were 8
able to take action without regard to cost when 9
necessary to protect the public health and safety. To 10 go beyond that, the regulation requires that we 11 evaluate the costs associated with those actions.
12 MR. LEVENTHAL:
Yes.
I'm sorry.
Now I 13 understand the question.
I would say that the 14 circumstances in this case clearly would justify that.
15 I think the TMI intrusion which was recaptured on 16 video tape on sort of a
delayed replay
- basis, j
17 indicated that this was not a hard target, this was a 18 soft target.
He drove through an open gate, he 19 crashed through two protected area fences and through r
20 the aluminum door of the turbine building and 60 feet 21 into the plant, close enough so that had the car had 22 explosives, it would have affected vital systems.
~
23 That suggests a vulnerability that if someone was 24 determined to engage in this kind of an attack today, 25 he might well be able to be successful.
I don't NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(2D2) 2344433 WASHINGTON, D C. 20005 (202) 2344433
1 16 l
1 understand why U.S. plants should be vulnerable in 2
that'way when other buildings that are important to 3
the public, not only in health and safety terms but in 4
governmental terms, are protected.
5 COMMISSIONER CURTISS:
I asked the 6
question because the written statement and your 7
presentation here does include some discussion of what 8
the costs are of the various options.
Just to be 9
clear here, what you're proposing is that we take this 10 action as an action necessary to protect the public 11 health and safety, to maintain adequate protection and 12 it should be taken irrespective of what the cost is.
t 13 MR. LEVENTHAL:
That's correct.
14 COMMISSIONER CURTISS:
Okay.
Secondly, I 15 take it your organization's respective positions 16 throughout this discussion, going back to 1985, I 17 think you said, have consistently been that the 18 vehicle threat, even though we hadn't had one prior to 19 TMI,. was sufficiently credible in your view, given 20 what was going on in the world generally, that we 21 ought to modify the design basis threat to account for 22 at least prior to TMI a yet to be demonstrated vehicle 23 bomb threat.
Is that an accurate statement for you?
24 MR.
LEVENTHAL:
That's correct.
We 25 considered the threat credible even before the TMI 3
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
{202) 234 4433 WASHINGTON, D C. 20005 (202) 234-4433
.=
17-1 intrusion and the World Trade Center explosion.
2 COMMISSIONER CURTISS:
Okay.
All right.
3 Now, recognizing that your testimony here is focused 4
on the vehicle bomb threat, taking those two points, 5
as we've just discussed them, that this action is 6
necessary to protect the public health and safety and 7
hence cost ought to be irrelevant in what we do, and 8
secondly it doesn't take an actual vehicle threat as 9
we had with the TMI, you could know that beforehand, l
10 the logic of your argument would suggest, and here I 11 want to explore how far you would carry the argument, 12 would suggest that we ought to do the same thing for 13 waterborne bombs or for airplanes.
You're not 14 suggesting that here at least today.
How do you 15 distinguish, given the logic of your argument, why we i
16 should address vehicle bombs and not, if in fact 17 that's your position, go beyond that to address l
18 waterborne bombs or airplane attacks or what have you?
i 19 What is the basis for distinguishing the two?
l 20 MR. LEVENTHAL: Well, we don't really make 21 that distinction, at least not in our petition for 22 rulemaking which was, as you know, rejected by the 23 Commission.
There we included all surface vehicle j
24 bombs, both boat borne and truck or car borne bombs.
5 I believe we specifically 25 We did not deal with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS
[
1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON, D C. 20005 (202) 2344433
18 1
excluded at the time reference to bombs borne by 2
aircraft simply because we realized that that was a 3
different type of a problem, one that would be more 4
difficult to defend against and our logic was that if
~
S you have the opportunity to defend against one type of 6
an attack on a pretty effective basis, that you 7
perhaps should move promptly to deal with that and 8
ponder further the more difficult form of attack and 9
one that would probably be less likely to occur, since 10 one has to assume that it's easier and more feasible 11 to attack by boat or by car or truck than it is by 12 plane.
13 COMMISSIONER CURTISS:
Is your argument 14 there that it is less likely to occur because they j
i 15 don't rent airplanes at U-Haul centers or what have 16 you, that they're less able to obtain that form of 17 transport or that it's more difficult, read more 18 costly and perhaps impossible to protect against that 19 kind of threat?
20 MR. LEVENTHAL:
Well, it's surely easier 21 to rent a truck than it is to rent a plane.
So, I 22 guess one has to assume on that basis that it's 23 somewhat less probable that an attack would come by 24 plane.-
25 MR. GREENBERG:
If I could interject here NEAL R. GROSS i
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 234 4433 WASHINGTON D.C. 20005 (202) 234 4433
=
l 19 1
for a moment.
2 COMMISSIONER CURTISS:
Yes, please.
3 MR.
GREENBERG:
We were looking at-a 4
situation where there was substantial evidence that 5
truck bombs were weapons of choice by terrorists.
We 6
had the Beirut incidents in 1983 that really 7
stimulated the whole U.S.
government to look at the 8
particular problem of land borne vehicles carrying 9
explosives.
When you start looking at something like 10 an airplane, that's a hypothetical possibility but we 11 don't have any experience, at least none that I'm t
12 aware of.
13 COMMISSIONER CURTISS:
Yes.
Would it be 14 fair to say that airplanes and boats are not credible 15 threats?
16 MR. LEVENTHAL: No, I think attack by boat 17 is a credible threat and I also understand that there 18 has been some attention paid to that in terms of the 19 design of the plants themselves.
There appears to be 20 no attention paid to penetration by cars-or trucks.
21 Surely it's not included in the design basis threat I
22 and the TMI intrusion is proof positive that the plant 23 was highly vulnerable.
1 24 COMMISSIONER CURTISS: An airplane threat, 25 I guess, would be a not credible event then.
Is that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE N W. '
4 (20?) 234-4433 WASHINGTON, D C. 20005 (202) 234-4433 q
20 1
1 what I should infer?
[
2 MR. LEVENTHAL:
No, it could be credible, 3
but it's also harder to defend against.
What I'm 4
trying to argue here is that simply because there's 5
another type of threat that's harder to defend 6
against, that's not a reason for not defending against 7
a threat that you can more readily defend against.
8 COMMISSIONER CURTISS:
Logically I think 9
you make a persuasive argument, a compelling argument 10 and in some respects I agree with the points that you 11 make. But from the standpoint of the framework within 12 which we have to render a decision on this, the logic 13 of the argument that when one makes the case that it's 14 an adequate protection issue, that is to say you e
15 assume that this is necessary to protect the public 16 health and safety and that you don't need an intrusion 17 to be d.emonstrated, as you've maintained since 1985 l
f 18 that vehicle borne threats are, in f act, credible long 19 before we had the TMI event. The logic does cause you t
20 to ask the question, "How far would you carry that?
21 Would you carry that to waterborne bombs or airplane 22 threats to the plant or what have you?"
23 MR. LEVENTHAL:
We'd definitely include 24 waterborne bombs.
There are ways.to assure a setback 25 distance in that given situation. We are here talking NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE N.W.
(202) 234-4433 WASHINGTON. D.C. 20005 (202) 2344433
I I
21 l
1 essentially about setback distances.
We're talking i
2 about denial of access.
With a plane, it's obviously 3
a very different type of a situation and it's a very i
4 difficult situation.
Some plants are better equipped j
^
5 to defend against it than others.
In fact, TMI, as it 6
turns out, is better defended against an airborne 7
attack because of this special containment because the f
8 plant is close to an airport.
9 COMMISSIONER CURTISS:
Okay.
10 MR.
LEVENTHAL:
I think what the 11 Commission has to look at is in the worst case how are 12 you going to defend not having taken action if there 13 is an attack against a plant?
On what basis are you j
14 going to explain to the public why, af ter TMI-1, after 15 the World Trade Center it was still felt that there i
I i
16 was not an urgent enough situation to take the most 17 fundamental kind of defense here and the one that is 18 the least costly to implement, namely physical j
19
- barriers, i
20 COMMISSIONER CURTISS:
Okay.
Let me pick
)
21 up on that point because I have two other quick areas 22 I'd like to pursue with you.
23 In your_ testimony in 1988 before the l
24 Gejdenson Subcommittee, at the time what you described
{
25 in terms of the physical protections that you would j
l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
j (202) 2344433 WASHINGTON, D.C. 20005 (202) 2344433
)
l n.
22 i
1 recommend be taken and described in the public record 2
was a double chain link fence with an aircraft cable 3
between the fence with a standoff distance of 100 i
4 yards, assuming a five ton truck and I think that was 5
the gist of the steps that you suggested be taken.
Is t
6 that your position today, that action if taken would l
l 7
be sufficient to address the problem?
8 MR. LEVENTHAL:
Those types of defenses, 9
I believe that was on the basis of some expert advice 10 we got at the time as to what would work best.
There 11
- may, in
- fact, have been improvements in the 12 technology.
But basically aircraft cable to prevent f
i 13 penetration of the perimeter fence and hydraulically 14 lifted gates to prevent access through the main i
T-15 driveways as well as perhaps concrete flower pots to 16 require a zigzag route into the plant.
These are 17 methods and technologies that are well
- known, 18 relatively inexpensive and can be installed fairly j
19 quickly.
20 COMMISSIONER CURTISS:
Okay.
If one were l
21 to take those steps that you've just outlined and i
22 emphasizing here that that would include the requisite f
r 23 standoff distance, which you defined at the time as l
24 100 yards, would that moot the question of whether we i
25 should address this issue in the context of IPEEE?
L NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 234-4433 WASHINGTON, D C, 20005 (202) 234-4433 i
23 1
What's left to address in IPEEE if you take steps that 2
essentially eliminate the threat?
3 MR. LEVENTHAL: I guess what's lef t is the 4
question if there were an explosion at that point because the truck couldn't get any further in.
Are 5
6 there any systems on the plant grounds or within the 7
plants that could be affected by a blast, a credible 8
explosion that could be achieved at that distance?
9 COMMISSIONER CURTISS:
Yes.
I'm taking i
10 your proposed standoff distance of 100 yards as the 11 assumption here.
Let's assume for the sake of 12 argument that that would be sufficient to counter the 13 effects of the blast.
4 14 MR. LEVENTHAL: I don't know the answer to 15 that question.
I think that's what you need an IPEEE 16 program to find out and that's a very good example of 17 why the program makes sense.
We don't know how great 18 the defense in depth is when it comes to redundant i
19 systems that could be knocked out with a single 20 explosion.
We did submit, as I mentioned in my i
21 testimony, a list that we wanted to submit under seal.
I 22 The Commission advised us we did not have to submit it 23 under seal, even though it was our preference to do 7
i i
24 so.
We were advised by experts that those are 25 examples of potentially vulnerable systems that you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l
1323 RHODE ISLAND AVENUE, N W.
(202) 234 4 433 WASHINGTON, D C. 20005 (202) 234 4433
24 1
want to check out and would be appropriate to be 2
checked out with an IPEEE program.
3 COMMISSIONER CURTISS: Okay. I don't have 4
any other questions.
5 CHAIRMAN SELIN:
Commissioner Remick?
6 COMMISSIONER REMICK: Just following up on 7
your answer to one of the Commissioner Curtiss' 8
questions, you indicated that you thought the boat 9
bomb and aircraft bomb were less likely.
But it seems 10 if you had --
11 MR. LEVENTHAL:
Not the boat bomb.
12 COMMISSIONER REMICK:
Oh, I'm sorry.
13 MR. LEVENTHAL:
I didn't say the boat 14 bomb.
Aircraft.
15 COMMISSIONER REMICK:
Okay.
Aircraft 16 bomb.
But if you had determined terrorists and you 17 were able to prevent vehicle bombs and prevent against 18 boat bombs, I would think the aircraft bomb approach 19 would become more likely then if you had determined 20 terrorists.
21 MR. LEVENTHAL:
It might well, and then I 22 think you'd also have to think through how you can 23 best defend against that.
I wouldn't deny that, but 24 I would argue, as I did before, that if there.are 25 vulnerabilities that you can effectively close at NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 Rr4DDE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON D.C. 20005 (202) 234-4433
f 25 7
1 relatively little cost and do it quickly, that you 2
should do that even if there are other forms of attack 3
that are still possible.
4 COMMISSIONER REMICK:
You indicated both 5
in your written testimony and your oral presentation, 6
"And there is now a specific and credible threat 7
against nuclear facilities."
What specifically are 8
you referring to there?
9 MR. LEVENTHAL:
I was referring to that 10 letter received by the New York Times and that we 11 understand has been linked to the defendants in the 12 World Trade Center case.
13 COMMISSIONER REMICK: And you view that as l
14 a credible threat?
15 MR. LEVENTHAL:
Well, we don't have full 16 access to the intelligence available and to the 17 investigation itself, as I assume the Commission does 18 and as I assume you may be briefed on this afternoon.
19 I guess I would say this.
If there's any uncertainty 20 in the minds of the federal investigators as to 21 whether this group has links with other groups or 22 whether it is presenting the views of others who are 23 still at large and have the same kinds of capabilities
[
24 that were employed at the World Trade Center, if I l
25 were in your position I'd be very nervous about that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON. D C,20005 (202) 234 4433 i
26 1
and I wouldn't want to hang my hat on assurances by a
2 the same agencies that missed the World Trade Center
{
3 attack entirely that you have nothing to fear right 4
now.
i 5
I think if you can take prudent action to 6
close existing vulnerabilities, you can breathe a lot
[
7 easier about the possibility that intelligence j
8 agencies might miss the next threat and that the next 9
threat might be directed to a nuclear facility.
10 COMMISSIONER REMICK:
Do you happen to 4
11 know in that letter what they were referring to when 12 they said nuclear targets?
- I 13 MR. LEVENTHAL:
No.
They spelled nuclear i
14 with a capital N.
I don't know what that suggests.
15 But we are aware of what the potential nuclear targets 16 are in the United States and one of them is the more l
17 than 100 operating nuclear power plants. Those are in la your charge.
They may mean defense establishments, l
19 they may mean transports.
Some of the transports are 20 in your charge, others are not.
But what's clearly in l
21 your charge I think you should attend to.
22 COMMISSIONER REMICK:
- Well, in your 23 proposal, are you proposing thht we address just r
24 nuclear power plants of the varioun facilities under
[
25 our jurisdiction?
NEAL R. GROSS i
COURT REPORTERS AND TRANSCRIBERS 1323 RHODC ISLAND AVENUE, N.W.
(202) 2344433 WASHINGTON. D C. 20005 (202) 234-4433 i
27
?
1 MR. LEVENTHAL:
Well, you're aware that l
2 nuclear fuel facilities -- there was a review of the 3
design basis threat there to make it comparable to the 4
requirements that DOE applies to its facilities, and 5
the Commission took an interesting action at that 6
time.
They said, "Well, DOE doesn't have any nuclear 7
power plants.
We do.
They're not -- so, whatever 8
applies to their reactors doesn't necessarily apply to 9
us.
With their nuclear fuel facilities, since there i
10 was a comparability question involved there, the 11 Commission did upgrade to the design basis threat to i
12 contemplate attack with a
vehicle.
We don't 13 understand why an attack with a vehicle is credible at 14 a nuclear fuel facility licensed by the NRC, but is 15 not credible with regard to a reactor licensed by the 16 NRC and we think it's that kind of inconsistency that 17 you should address realistically, not legalistically, 18 although realistic and legalistic are not necessarily j
19 in conflict.
But one can often get in the way of the i
20 other.
21 I think you've got a real world situation 22 on your hands here today.
You've got an immediately 23 effective way to deal with it and we're urging you to 24 please do it.
25 COMMISSIONER REMICK:
Yes.
But you are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N.W.
(202) 2344433 WASHINGTON. D C. 20005 (202) 234-4433
28 1
addressing nuclear power plants strictly.
f 2
MR. LEVENTHAL:
In this testimony, yes.
3 COMMISSIONER REMICK:
In this testimony, 4
okay.
5 MR. LEVENTHAL:
That's correct.
6 COMMISSIONER REMICK: Now, I assume that--
7 it's not clear, but I'm assuming that your interest is
?
8 preventing radiological sabotage and not diversion or 9
economic loss to the plant.
Am I correct?
10 MR. LEVENTHAL:
I think if there were an 11 explosion, there would probably be all of the above, i
12 but we are dealing specifically with radiological 13 consequences, that's correct.
14 COMMISSIONER REMICK: Does the Institute's 15 interest include facilities-other than nuclear i
16 facilities that might be subject to terrorist threats 17 also?
18 MR. LEVENTHAL:
Well, we are the Nuclear
,1 19 Control Institute, so our assigned interest is that of 20 nuclear facilities.
I guess I
would like to 21 concentrate my testimony on that question.
There are 22 a lot of facilities to worry about.
Some of them are 23 already protected in ways that we think nuclear power f
24 plants should be protected.
25 COMMISSIONER REMICK:
But you're not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 2344433 WASHINGTON, D.C. 20005 (202) 2344433
r 29 1
proposing all public buildings or all reservoirs or 2
chemical plants or anything like that?
It's not your 3
purview?
4 MR.
LEVENTHAL:
It's not part of our 5
proposal, but I would say logic would dictate that i
6 there ought to be a lot of different types of 7
facilities in buildings where security should be 8
addressed as a consequence of the World Trade Center 9
explosion.
But in our testimony and because of our 10 particular mission, we deal with nuclear facilities.
11 COMMISSIONER REMICK:
Would that 12 protection include vehicle bomb barriers, vehicle 13 access barriers and so forth, those various other 14 potential targets?
15 MR. LEVENTHAL: In non-nuclear facilities?
16 COMMISSIONER REMICK:
Yes.
17 MR. LEVENTHAL:
Yes, to the extent it can i
18 be practically and feasibly applied.
19 COMMISSIONER REMICK:
Okay.
I think that 20 answers my question.
21 CHAIRMAN SELIN: Thank you, Commissioner.
22 Commissioner de Plangue?
l
~
23 COMMISSIONER de PLANQUE:
I have no i
24 further questions.
i 25 CHAIRMAN SELIN:
- Fine, i
i NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON. D.C. 20005 (202) 234-4433
E 30 1
COMMISSIONER CURTISS: Just one question.
2 CHAIRMAN SELIN:
I'm sorry.
Go on, 3
Commissioner Curtiss.
4 COMMISSIONER CURTISS:
I'11 plead guilty 5
to being legalistic, I guess, since I'm the lawyer on 6
the Commission.
I do think it's important though that i
7 as we hear your appeal and there is some logic to it, s
8 but as we hear your appeal whatever action we take is 9
one that is based upon what we've seen to date that is P
10 consistent with the decisions that we've taken in 11 other contexts and that can be defended as such when j
12 it comes to future circumstances that might arise.
13 You pointed to a question on your part as to why I
14 category 1 fual facilities and reactors were treated 15 differently, what you perceived to be an 16 inconsistency.
I actually think there is an answer to 17 that and that is that there's material at category-1 18 facilities that might be quite attractive to a 19 potential terrorist and maybe more attractive and l
20 hence there is a logic to that.
21 Similarly in asking the questions that I e
[
22 did about whether you view this as a backfit, an t
23 adequate protection issue, how you would propose to 24 treat waterborne and airborne threats, one ought to 25 ask the question if we move forward in a particular NEAL R. GROSS t
COURT REPORTERS AND TRANSCRIBERS I
1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON. D.C. 20005 (202) 2344433
31 1
way in this context, is there a basis for it, will i
2 people come in and argue at some future point based upon the action we take here?
The logic of that 3
4 action dictates that we ought to protect against 5
waterborne or airborne bombs or what have you j
6 irrespective of the cost.
7 So, if that's a legalistic view, I plead 8
guilty to that.
I think it is a question that goes to 9
the logic of whatever we do and I think that is an 10 important consideration here.
11 MR.
LEVENTHE:
I guess I
sort of 12 subscribe to the logic of someone we know in common, 13 Big Al Simpson, which would be to say if there's 14 something you can do easily 'md practically, why not 15 do it and be done with it and not belabor it?
That 16 was the philosophy he expounded upon when I was co-17 chairing the TMI investigation with Jim Asselstine and 18 I think it's a pretty good logic to apply here.
19 COMMISSIONER CURTISS:
I came to know it 20 well.
21 CHAIRMAN SELIN:
Yes.
I would like to 22 make a couple of comments.
It's really for the f
23 record.
r 24 Our view on those fuel facilities which 25 handle enriched uranium, more highly enriched uranium, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
[
(202) 234-4433 WASHINGTON. D.C. 20005 (202) 234-4433 l
32 1
is not to protect them against the vehicle bomb threat 2
but to protect them against vehicle penetration that 3
might lead to the special nuclear materials being 4
carted away.
Right or wrong, it's a different logic.
~
5 I don't think there's an inconsistency that we handle j
6 those facilities different --
l 7
MR. LEVENTHAL:
But if I may respond to 8
- that, those facilities
- have, because of those 9
defenses, built in protection against radiological 10 sabotage that might be affected by a vehicle.
11 CHAIRMAN SELIN:
Could be, but the design 12 threat does not include a vehicular bomb, it includes 13 vehicular penetration.
'f 14 MR. LEVENTHAL:
But that's how vehicular 15 bombs are executed.
They get in as close as they can 16 and then they explode.
So, the point I'm making is 17 that you do have implicitly protection --
18 CHAIRMAN SELIN:
Mr. Leventhal, you're 19 arguing we were handling them inconsistently.
I'm 20 debating that.
I'm not saying that inadvertently we 21 might actually have satisfied you on the facilities 22 that may have happened.
i 23 The second is that the ground rules for.
24 our review are limited to radiological damage.
Our l
25 charter is to radiological protection of the general l
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N.W.
(202) 2344433 WASHINGTON. D.C. 20005 (202) 2344433
I 33 s
1 public, that if in so doing we manage to' protect the 2
economic investment or the people who work in the 3
plant, that would be so much better, but that's not in 4
our ground rules.
Our ground rules are should we 4
the design threat 5
reconsider the threat of what 6
that would lead to radiological damage.
7 The third is I really do have to -- as 8
plausible and as interesting as your testimony is, I 9
guess I can't quite say that I'm the realistic on the 10 Commission, to go with Commissioner Curtiss being the 11 lawyer on the Commission, but realistic or not, if we -
12 say that this threat is plausible enough that it 13 should be fixed immediately, then we don't have to 14 look at our backfit rule.
If we argue that the threat 5
15 is reasonably plausible, no more nor less than other 16 threats but the defenses are so easy we should do 17 them, then we do have to go through our backfit rule 18 and say, "Are the defenses -- the costs commensurate?"
19 because if it really is a threat to health and safety, 20 then we're not supposed to take the degree of defense 21 in hand.
22 I
will also say, in my opinion the 23 waterborne threat is considerably less plausible than 24 the bomb threat, particularly because of the amount of i
of the vehicular threat partly because of 25 l
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS j
1323 RHODE ISLAND AVENUE, N W.
(202) 7344433 WASHINGTON, D C. 20005 (202) 234 4433
i 34 i
1 experience with vehicular threats and partly because 2
of the difficulty of'getting a waterborne vehicle to 3
a place where you have reasonably high confidence that 4
4 you would do severe damage to the plant.
t 5
You're a very good witness.
I noticed no 6
matter what the question is your answer is always the 7
same, and that's a sign of sophistication.
8 MR. LEVENTHAL:
Could I say at one point I
9 on the economic aspect, I wonder if there is a single 10 public utility commission in this country that would 11 object to a $1 million or so cost being folded into i
12 the rate base to provide the kind of protection that i
13 could be affected here today by simply voting aye on 14 the question of the immediately effective rule and the 15 required installation of those barriers.
{
16 CHAIRMAN SELIN:
Sure.
But we don't have 17 the authority to issue an immediately effective rule 18 on the grounds that it's only $1 million.
It would 19 have to be on the grounds that the threat calls for it 20 from the point of view of the protection of --
21 MR. LEVENTHAL:
I understand that.
22 CHAIRMAN SELIN:
Otherwise we -- whether 23 we get comment or not, we need to go.through the 24-backfit calculations, et cetera.
25 MR. LEVENTHAL:
We think the health and l
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
(202) 2344 433 WASHINGTON, D.C. 20005 (202) 2344433 i
35 1
safety arguments are quite plausible and quite 2
compelling.
3 CHAIRMAN SELIN:
Okay.
Thank you --
4 4
COMMISSIONER ROGERS:
I'd like to just say 5
one -- make one little point on cost.
The costs that 6
you've alluded to here are financial costs, dollars.
7 Our concerns are not only with those kinds of costs, 8
but the costs that come about in perhaps diverting 9
attention or making it more difficult to carry out the 10 operation of the plant itself in the safest possible i
11 way.
We've seen already from the TMI experience that 12 the physical security requirements do interfere with 13 the safe operation of the plant under normal i
14 circumstances.
That's a cost in my view and it's a 15 very high cost and probably a much higher cost than 16 the dollar cost that one talks about here.
17 So, I think that when one talks about 18 cost, the costs have to be not only in purely economic 19 terms, but the overall cost in the safe operation of 20 the plant, whether that is improved or perhaps in some 21 way reduced as a result of improving -- responding to l
22 another possible threat.
I think you must take into 23 account that this Commission considers all of these 24 matters and we certainly are not dictating or not 25 directing our attention solely to dollar costs of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON. D C. 20005 (202) 2344433
=.. _. -
36 1
installing some kind of physical barrier.
I think 2
we're concerned in moving into this domain with what 3
the operational difficulties are that may come about.
I'm not giving this as 4
For example 5
something that we really have studied, but for example 6
the access of fire equipment to respond to something I
7 going on in the protected area.
To what extent would 8
these kinds of barriers interfere with that in a way 9
that might possibly cause a much more serious problem 10 that we know about that can happen.
So, these are 11 other matters that must be taken into account as we 12 view introducing new additional impediments to the 13 operation of the plant.
14 MR. LEVENTHAL:
I would just respond very 15 briefly that I'm familiar with what some of those i
16 impediments are when it comes to dealing with the 17 insider threat and the pat-down rule and that sort of 18 thing.
I think putting cable up around the perimeter 19 of the protected area to prevent unauthorized 20 penetration and installing hydraulically lifted gates 21 that can be immediately lifted when there is a i
22 perceived threat, I don't think those should interfere 23 too severely with the safe operation of the plant.
In 24
- fact, I would argue that's a further reason for 25 proceeding along the lines that we recommend today.
NEAL R. GROSS f
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON, D.C. 20005 (202) 2344433
37 4
1 MR. GREENBER3:
I think we pointed out in 4
2 our testimony as well, Consissioner Rogers, that there t
3 are a number of plants, not a large number,- but 4
several at
- least, that do have these kinds of 9
5 vehicular protections.
To my knowledge, no one hac 6
suggested that those compromise the safe operations c
7 of --
L 8
COMMISSIONER ROGERS:
But every single i
9 plant in this country is different from every other 10 plant.
The physical layouts are different.
They're 11
- very, very different and you cannot argue that 12 something that doesn't interfere with safe operation 13 at one plant would automatically not interfere at 14 another plant.
It could very well -- it very well 15 might.
16 MR. LEVENTHAL:
But where is the greater i
l ',
danger?
Is the greater danger that tomorrow or the 18 day after someone might actually attempt to explode a 19 bomb inside the plant grounds, or is the greater 20 danger that by putting in these barriers you're 21 somehow going to interfere with fire fighting 22 equipment arriving for an entirely different matter?
23 CHAIRMAN SELIN:
That's exactly the 24 question --
25 COMMISSIONER ROGERS:
That's exactly the f
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 234 4433 WASHINGTON, D.C. 20005 (202) 2344433 t
l 4
38 1
question.
i l
2 CHAIRMAN SELIN:
-- that we're going to 3
have to look at.
4 COMMISSIONER ROGERS:.That's exactly the 5
question.
l 6
MR. LEVENTHAL: Well, my answer to that is 7
that, at least to my mind, it's pretty obvious what 8
the answer is.
9 COMMISSIONER ROGERS:
Well, it's not at 10 all obvious to this mind.
11 CHAIRMAN SELIN: Fair enough. At the risk 12 of not letting you get in the very last word, Mr.
l 13 Leventhal, remember the Hebrews had to wander around 14 40 years in the wilderness.
Eight isn't that long.
15 Thank you very much for having been i
16 witnesses and we call the staff at this point.
17 MR. LEVENTHAL:
I'd like to leave with you 18 also our counsel, Eldon Greenberg's testimony before 19 the Senate Subcommittee.
It does lay out the 20 chronology of the various efforts and I alluded to 21 those.
l 22 CHAIRMAN SELIN: -Would you give it to the 23 Secretary?
Fine.
24 MR. LEVENTHAL:
Thank you again.
25 CHAIRMAN SELIN:
Thank you.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(20?) 234-4433 WASHINGTON. D C. 20005 (202) 2344433
39 1
COMMISSIONER CURTISS:
Thanks, Paul.
2 CHAIRMAN SELIN:
I think without further 3
adieu, we'll welcome you, Mr. Taylor and the staff, 4
and ask you to go ahead with your presentation.
5 MR. TAYLOR: We're here in response to the 6
Commission's request that staff reevaluate the current 7
design basis threat for radiological sabotage.
Our 8
briefing today represents the first phase of that 9
reevaluation in which we will briefly describe the 10 Commission's previous deliberations on vehicle threats 11 and then identify an updated list of physical security 12 options for consideration.
13 I note that in the interest of an open and 14 thorough review of the design basis threat, the staff 15 will conduct a subsequent public meeting to obtain 16 information from all interested parties and that 17 meeting is scheduled for May 10th at the Crown Plaza.
18
- Thus, the staff will not provide specific 19 recommendations to the commission today, but will do 20 so after the public meeting so that the results of it 21 can be considered by the staff and used appropriately 2'
for its recommendations.
J.
I'll now ask Bob Burnett to commence the 24 presentation.
25 MR. BURNETT:
Good afternoon.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
[202) 234-4433 WASHINGTON, D C. 20005 (202) 2344433
~
40 1
You'll have to bear with me a little bit 2
today.
Today's briefing is going to be somewhat 3
difficult.
Some of the supportive details, Mr.
4 Chairman, that you already referred to are classified 5
and it makes the job of asking questions and answering i
6 them somewhat difficult.
But we are going to try our 7
very, very best to be candid and as open as possible 8
within the security boundaries.
9 Also, another difficulty that we incurred, 10 the World Trade Center incident, which we all know 11 happened in February, we had hoped that we would have 12 additional data available for today.
But because of 13 a gag order that has been put in place in the State of 14 New York, no additional information has been made 15 available to our Agency.
16 As the EDO mentioned, the public meeting 17 is now scheduled for May the 10th at the Holiday Inn 18 in Rockville.
We have put out a' news release and a 19 Federal Reaister notice and copies of those were 20 provided at your desk when you showed up.
They are at i
21 both doors.
22 Now, with all of those caveats, what are 23 we going to cover today?
Well, we hope to give the 24 Commission some background on how this issue was dealt 25 within the past, what the staff actions were in the l^
l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON, D.C. 20005 (202) 2344433
41 1
past and outline the options that staff have currently 2
under consideration, and then sometime after the
[
3 3
public meeting we will come back to the Commission 4
with an analysis of the public meeting, a more 5
detailed presentation of staff analysis and 6
recommendations from the staff.
7 (Slide)
Slide 2, please.
8 All right.
Why are we here today?
I 9
think we've all said it several times.
It's because 10 of recent incidents, the Three Mile Island intrusion 11 and the World Trade Center bombing.
Both of these 12 incidents has caused the Commission, as well as the 13 staff, to reconsider the design basis threat and the 14 subsequent protection that is afforded to nuclear.
15 facilities in this country.
16 During the review, I think it is important 17 that we mention the relevant petitions submitted by 18 the Nuclear Control Institute and the Committee to 19 Bridge the Gap.
It was originally submitted 1/11/91 20 and it did suggest that vehicle protections be 21 immediately put into place, increase the number of 22 attackers that should be protected against, also 23 increase the weaponry employed by those adversriries 24 and, in addition, ask for an immediate remedy in the 25 form of an action to put the contingency plans that NEAL R. GROSS l
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON, D.C 20005 (202) 2344433
42 i
1 are required by the generic letter in place j
2 immediately.
3 Both the action plan and the petition was 4
subsequently denied.
The action was denied in the 5
same month of January and the petition later in June 6
of that year.
1 7
Further, recently, the FBI and the DOE and 8
the CIA have met with the Commission and provided 9
relative information.
Again, it's not possible to go 10 into that, but we will look into it in greater depth 11 in the meeting to follow.
12 Also, the recently held Lieberman hearing.
13 Basically, Mr. Lieberman, Senator Lieberman suggested 14 that the Commission move as fast as possible on this 15 issue.
16 Also in response to the Commission 17 direction, the staff has forwarded up a' multi-phased 18 work place, promising to give a fresh look at the 19 complete design basis threat, including soliciting 20 public opinion.
As I've said earlier, current plans 21 are to get back to the Commission as soon as possible 22 after that public meeting.
~
23-(Slide)
Next slide, 3, please.
24 Turning now to past deliberations, l
25 alternatives were developed in SECY-88-127 based on
(
NEAL R. GROSS 3
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
}
(202) 2344433 WASHINGTON, D.C. 20005 (202) 2344433
43 1
staff analysis and interaction with the intelligence 2
community.
Basically that paper presented three 3
options for contingency planning and three options for 4
physical security.
I'd like to cover first the 5
contingency planning.
6 The first alternative was for the NRC 7
itself to complete and develop a contingency plan in 8
the event that information was received that a
9 licensed facility was targeted by a vehicle or a 10 vehicle bomb.
Basically we were asked to do 11 prethinking and get all documentation prepared that 12 would be necessary to order the licensee to respond.
t 13 The second alternative, which we labeled
)
14 short-term contingency planning, required the licensee 15 to review his sites for land vehicle approaches and 16 device a contingency plan to intercept a would be 17 design basis vehicle. This contingency plan had to be i
18 operational within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of notification by the 19 NRC.
20 The third alternative, long-range 21 contingency planning, would require the licensee to go i
22 through all of the necessary designs to install a 23 permar.ent vehicle protection system, but not install 24 it.
In essence, get ahead of the power curve.
In all 25 cases, adequate standoff distances would be required NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
(202) 2344433 WASHINGTON, D C. 20005 (202) 2344433
44 1
for a
design basis vehicle that would be yet 2
developed.
3
- Now, turning to the physical security 4
alternatives.
The licensee in alternative 1 would 5
install a vehicle protection roadway system only.
6 Alternative 2, he would extend the vehicle protection 7
system all the way around the perimeter.
Both of 8
those cases would be required to protect against a 9
design basis vehicle.
The third alternative would do 10 all of the above except would assume the presence of 11 a design basis explosive on the vehicle.
Therefore, 12 added standoff ranges, where necessary, would have to 13 be provided.
The design basis vehicle and the 14 explosive was considered safeguard information and 15 would be provided under separate cover.
16 (Slide)
Next slide, please.
17 During the 1985 through 1988 time period, i
18 the Commission met with the CIA, the FBI, the DOE and 19 the National Security Council.
In particular, the j
t 20 National Security Council was solicited for their view 21 of the status or the existence of a vehicular design, 22 a vehicular threat or vehicular bomb threat in 23 America.
The Agency views and resulting data will be 24 briefed in the follow-on meeting and are considered 25 classified.
However, I can note at this point that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D.C. 20005 (202) 2344433 i
t 45
~
i 1
during the Lieberman hearings recently held, that the I
2 FBI said that they knew of no credible threat directed 3
towards the nuclear community.
4 (Slide)
Next slide, please.
5 After the Commission received several 6
staff papers and briefings and data from the 7
intelligence community, the Commission issued their 8
staff requirements memorandum in June, on June the 9
16th, 1988.
It directed the staff to develop the 10 Headquarters contingency plan previously briefed, and 11 to require the licensee to develop contingency plans 12 to protect against the design basis vehicle alone. No t
13 explosives were to be presumed aboard.
b 14 The staff issued Generic Letter 89-07, 15 April 28th, 1989 requiring licensees to create a i
16 contingency plan within six months.
That plan would l
17 be available on-site for review by NRC inspectors.
18 Indeed, the specifications of the design basis vehicle k
19 was provided under safeguarded information, separate 20 cover.
i 21 COMMISSIONER REMICK:
Bob, before leaving 22 that slide, what classes of our licensees have some 23 form of contingency plan, not only for vehicles but 24 requirement of having security contingency plan or 25 safeguards?
l NEAL R. GROSS COURT REPORTERS AND TRANSORIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433
. WASHINGTON, D C,20005 (202) 234 4433 j
f
i 46 1
MR. BURNETT:
Okay.
Both reactors and i
2 category 1 plants have contingency plans. Contingency 1
3 plans, however, come in two major colors, should I 4
say, the vehicular denial system, which is at the 4
5 power reactors, and at category 1.
In addition, both 6
of those facilities have what I call safeguards 7
contingency plans to address such things as hoax bomb threats when they're
- received, standoff firing 8
9 attacks, fires that could start on-site that you would 10 have to move, in the case of a category 1 site, people 11 into a holding pen area to make sure we didn't lose 12 special nuclear material.
And, in fact, all forms of 13 contingencies, if a weapon was discovered on site, if 14 a weapon was discovered on a person, almost every form 15 of contingency you can think of.
16 COMMISSIONER REMICK:
When you say 17 reactors, you mean power reactors only?
18 MR. BURNETT:
Yes, power reactors only.
19 COMMISSIONER REMICK:
Don't non-powr 20 reactors also have contingency plans of some type, not 21 talking about vehicular?
22 MR.
BURNETT:
I'll yield to Mr. Frank 23 Miraglia on that one.
24 MR. MIRAGLIA:
I don't believe that they 25 have security contingency plans. The requirements are i
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
(202) 2344433 WASHINGTON, D C. 20005 (202) 2344433 h
47 4
1 established in Part 73 of the regulations and I think 2
it's an Appendix E or Annex E to that that talks to t
3 the general outline of a requirement contingency plan.
4 As Mr. Burnett said, it establishes planning criteria 5
to respond to a whole range of contingencies, from 6
bomb hoax to degraded security features to say what 7
steps would be taken and how would they be implemented I
8 under those various contingencies.
9 COMMISSIONER REMICK:
What level of staff 10 review have contingency plans received? I'm referring i
11 mostly to reactors now.
Have all of the contingency 12 plans been subject to staff review and to what extent?
13 MR. MIRAGLIA:
To use Bob's phrase, they 14 come in different colors.
The broad requirement for i
I 15 contingency planning that was required under Part 73 16 was reviewed in the licensing context for Part 73, did l
17 they have contingency plans and what contingencies 18 would be covered.
Those were reviewed in the 19 licensing context and then they would be reviewed by 20 inspection and the like.
21 The generic letter expanded the 22 contingency plan to say that there should be 23 contingency planning for protection against surface 24 vehicle bombs that could be implemented in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
25 Those contingency plans in that generic letter said NEN_ R. GROSS COURT REPOFTERS AND TRANSCRIBERS 1323 RHODI lSLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D C. 20005 (202) 234-4433
48 1
that that did not require it to be submitted to P
2 Headquarters for review in a licensing context and 3
should be made available in the field and would be 4
looked at in the inspection process. We have examined 5
that on at least two occasions via the resident 6
inspectors and reasonable base inspectors.
{
7 COMMISSIONER REMICK:
Two occasions 8
meaning two different times --
9 MR. MIRAGLIA:
Two different times.
I 10 COMMISSIONER REMICK:
-- or two different f
11 plants?
12 MR. MIRAGLIA:
Two different times at the 13 facilities.
I believe shortly after the 14 implementation date, the effective implementation date t
15 of the regulations there was some looking.
I think we 16 did something at the Persian Gulf time and there's I
17 just recently, after the World Trade Center, we' had 18 licensees and resident inspectors to look down.
19 I think I should emphasize that these 20 plants have never been exercised, so we have not 21 inspected them from the point of view of total 22 effectiveness.
But, number one, were there plans in
~
23 place, were there vehicles or appropriate instruments 24 by which they could get vehicles or if they had said 25 that they were going to have ditches or whatever the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS I
1323 RHODE ISLAND AVENUE, N.W.
(202) 2344433 WASHINGTON, D C. 20005 (202) 2344433
---.s
49 1
things are, that those things were there and they 2
appeared to be implemented in the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> time frame.
3 COMMISSIONER ROGERS:
Excuse me.
Do we 4
actually go and look to see or do we get letters from 5
people telling us they had these?
l l
6 MR. MIRAGLIA:
The inspectors looked at 7
the plans and verified to what they could.
I wouldn't l
8 go as far, Mr. Rogers, to say that they looked at the 9
-- if there was a letter and agreement to say where i
10 they would get vehicles if vehicles were going to be 11 used to provide a standoff distance, whether those 12 contracts -- there was documents to say that that was 13 in their plan and there was letters of agreement.
14 Whether they could actually pull those number of 15 vehicles in at a time, we didn't check that kind of a i
16 factor.
So, it was that type of review.
17 COMMISSIONER REMICK:
Frank, when you say 18 that they were never exercised, am I correct that 19 you're talking about for vehicle threat?
Have 20 contingency plans in general --
i 21 MR. MIRAGLIA:
Yes.
i ever been 22 COMMISSIONER REMICK:
23 exercised or activated?
24 MR. MIRAGLIA:
In the normal safeguards l
25 program, they are required to conduct contingency NEAL R. GROSS f
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE N W.
e (202) 2344433 WASHING 10N, D.C. 20005 (202) 234-4433
50 1
drills and exams.
l 2
CHAIRMAN SELIN: Are they contingencies or 3
are those just regular security plans?
4 MR.
MIRAGLIA:
They exercise the 5
contingency plan.
They would presume a fire or they 6
would presume a protected area intrusion and the 7
guards would --
t 8
CHAIRMAN SELIN:
The reason I'm drawing 9
the dif1erence is that the protection against f
10 vehicular threat is not --
11 MR. MIRAGLIA:
That's correct.
12 CHAIRMAN SELIN:
I mean first you have to 13 say, " Assume that we give you warning," and then in i
14 the case of that warning, wherein as in the other h
15 cases they're supposed to be able to do that from a 16 standing start.
17 MR. MIRAGLIA: You're absolutely correct, 18 Mr. Chairman.
I was addressing Commissioner Remick's 19 concern. We're talking about contingency plans of two l
20 different colors.
I'm not talking about the vehicle i
i l
21 contingency plan, I'm talking about the contingency l
22 plans that are developed in concern with Part 73 that l
l 23 said there should be contingency planning for certain l
24 security events, those that would be consistent with i
l 25 the existing design basis threat other than the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D C. 20005 (202) 234-4433 l
51 1
vehicle threats.
Those contingency plans are 2
exercised.
3 COMMISSIONER REMICK:
Have they ever been 4
activated for cause?
I mean either by us or by i
5 licensees other than an exercise, have there been 6
any --
7 MR. MIRAGLIA:
You're talking of either j
8 type?
9 COMMISSIONER REMICK:
Any type, yes.
10 MR.
MIRAGLIA:
To the best of my 11 knowledge, I don't believe the vehicle ones have been 12 in place in toto.
I believe that during the Persian' 13 Gulf crisis some licensees elected as a matter of 14 prudence to implement at least parts of those plans.
l 15 To the other licensees, there may have been some i
16 instances under bomb threats and these kind of things 17 where they have exercised those parts of the plan.
l lt 18 That's the best answer I can give you.
We can give i
19 you a more definitive answer --
20 MR. BURNETT: Contingency plans address so i
21 many different contingencies.
The lower level 22 contingencies are being not really exercised, but i
23 being reacted to more aften than you might think.
If 24 you look at the incidents that we report where 25 somebody accidently came through the detectors with a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
(202) 234-4433 WASHINGTON, D C. 20005 (202) 234 4433
52 1
weapon because he had come from a shooting ranc c
- hey 2
have a contingency on how to deal with that ar-a 3
know that that's happening all the time.
You know 4
that there are fires that have happened, so they have 5
used their contingency plan there.
You've heard of 6
people having medical demands on site.
So, there are 7
always different levels of a contingency plan.
8 COMMISSIONER REMICK: Thank you. You made 9
the point I was trying to make, is that there's 10 nothing new about contingency plans or are they unique 11 to vehicle threats? It's a part of our safeguards and 12 security apparatus in Part 73, right?
It was not 13 specifically designed to answer vehicle threats, it's 14 to handle all kind of contingencies at facilities.
15 I would like you to check because my 16 memory tells me that at least some non-power reactors i
17 at least one time had to develop contingency plans.
18 Maybe I'm getting old, but I would appreciate it if at 19 a later date you let me know if I'm incorrect on that.
20 MR. MIRAGLIA:
We can do that.
i 21 CHAIRMAN SELIN:
Commissioner Curtiss?
22 COMMISSIONER CURTISS:
Yes.
Do you have
}
23 any more, Forrest?
24 COMMISSIONER REMICK:
No.
l 25 COMMISSIONER CURTISS:
At the risk of l
NEAL R. GROSS COJRT REPORTERS AND TRAf; SCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON. D C. 20005 (202) 234 4433
r 53 i
1 sounding legalistic, let me turn back to the subject 2
of the backfit issue because the question has come up, 3
as I look at the history, at every juncture when we've 4
looked at what the options are in this area, beginning 5
in 1986.
1 6
The SECY paper, Bob, that you're referring 7
to now, the 1988 SECY paper which led to the decision 8
to require contingency plans discusses in some terse 9
- detail, I
- guess, the backfit question and in 10 particular expressed the staff's view at the time that 11 the contingency plan options, both short-term and 12 long-term, as well as the two options that you laid 13 out there, two additional options, each of which would 14 have led to a modification of the design basis threat, 15 and I'll read here, "May present difficulties in 16 justifying backfitting.
Based upon staff opinion, 17 change to the regulatory base is unwarranted because l
t l
18 no change to the threat environment has occurred.
19 Under these circumstances, it may be difficult to 20 satisfy the substantial additional safety requirements
[
21 for the regulatory analysis portion of a backfit i
22 analysis."
23 Now, from the standpoint of the relevant
{
24 regulatory provisions, 50.109, we've essentially got l
l in fact, we do have the I
25 today the very same i
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N.W.
(202) 2344433 WASHINGTON. D C. 2000$
(202) 234-4433
54 1
identical backfitting framework that we had back-in 2
1988 and that led the staff to this conclusion.
I l
i 3
have two questions here.
One is more of a historical 4
- one, i
5 When we have modified the design basis 1
6 threat, or if we were to modify the design basis 7
threat to account for some form of action, does that 8
action itself mean that the steps that have to be-9 taken to respond to that threat are themselves i
10 adequate protection measures?
That is to say they
[
11 need not be justified based upon the backfit.
That's 12 the first question.
13 The second question is do I -- should I i
14 infer from this paragraph, and in particular the 15 language that says, " Based upon staff opinion, change i
16 to the regulatory base is unwarranted because no 17 change to the threat environment.has occurred," that r
18 if a change in the thzeat environment has occurred, in i
19 this case perhaps TMI and the World Trade Center l
20
- together, that that fact is relevant from the 21 standpoint of the backfit analysis, and if so, how?
1 22 Does it mean that the potential benefits that would 23 accrue from protecting against that threat would be
'l 24 significant?-
Does it mean that it's an adequate 25 protection issue?
How should I view the application NEAL R. GROSS COURT REPORTERS AND TRANS&l*ERS l
1323 RHODE ISLAND AVENI.C, N b (202) 234 4433 WASHINGTON, D C. 2G %
(202) 2344433 t
i 55 1
of the backfit provision in this context and what 2
you've said to date on this issue?
3 MR. TAYLOR:
We may have to answer that 4
when we actually come forward with recommendations.
i 5
I don't know that we -- are you prepared to answer 6
that today?
7 MR. BURNETT:
Only partially.
We have 8
started thinking about the issue, Mr. Commissioner.
9 If we modify the design basis threat under prudence, 10 in other words we're seeing a trend in this country 11 and therefore it would be prudent to do that, then 12 it's very hard for us then to say that it's not 13 subject to backfit. That's one of the statements that 14 I've received from the lawyers in preparing for really i
15 the final determination that we have to present after 16 the open meeting.
17 COMMISSIONER CURTISS:
Can I expand on 18 that? Historically we've taken what appear to be two 19 kinds of actions.
We have taken some steps that we l
20 believe would be prudent to take even though the l
21 design basis threat itself need not be modified. That 22 was the gist of the contingency plans that the
~
23 Commission approved in 1988.
In that context, I think 24 one might argue that a cost benefit justification 25 ought to be applied there.
You're not changing the 4
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON. D C. 20005 (202 D4-4433
56 1
design basis threat, you are not perhaps therefore 2
arguing that it's necessary to protect the public 3
health and safety.
But we have taken that kind of 4
action.
S 5
The other kind that comes to mind is a 6
change to the design basis threat itself.
There the 7
question that I have, and I 21 be as clear as I can, 8
when we modify the design basis threat, are the 9
actions that a licensee has to take as a result of 10 that action on our part actions necessary to protect 11 the public health and safety and hence ones that can i
12 be taken irrespective of cost?
It's important 13
- because, as you point out in your SECY
- paper, 14 depending upon how we come out on the standoff r
15 distances, the costs may be much more substantial than 16 simply putting in an aircraft cable or delta barriers 17 or what have you, and depending, of course, on the 1P recommendation that is taken.
So, if you're prepared 19 to speak to it now, I'd be interested in your 20 response.
If you'd like to reflect on that more 21 carefully, I'd like to hear your response at some 22 point.
23 MR. TAYLOR:
I think we'd prefer it.
f
~
24 MR. MIRAGLIA:
One reason for that is the 25 original' Part 73 I think preceded some of the backfit NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 234 4433 WASHINGTON, D.C. 20005 (202) 2344433 1.
57 1
considerations.
I think we need to go back and look 2
at that.
i 3
CHAIRMAN SELIN:
When you're looking at 4
that, if I may add something to that, commissioner?
5 COMMISSIONER CURTISS:
Yes, go ahead.
i 6
CHAIRMAN SELIN:
By definition, a design 7
basis threat is not intelligence.
It may be affected 8
by intelligence, et cetera, as the Commission said in 9
its testimony, the testimony I
gave that the 10 Commission went through.
We take a
look at 11 intelligence, we take a look at a range of threats, we 12 take a look at the costs to counter them.
So, it's 13 not a linear process where one set of people get I
14 together and say, "What is the threat?" and then 15 another set of people say, "How can we best respond to 16 it?"
There is a back and forth here.
So, this is a 17 much trickier question than the normal one you get 18 into about how likely is it a pressure vessel will 19 fail under certain kinds of pieces.
.So, it's a very, 20 very important question.
I don't think I know the 21 answer and I don't think it's an easy answer to come l
l 22 up with.
23 MR. TAYLOR:
We'll.try to be prepared.
24 CHAIRMAN SELIN:
Fine.
25 MR. BURNETT:
(Slide)
All right.
I-was i
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
l (202) 2344433 WASHINGTON, D.C. 20005 (202) 234-4433
d 4_4 I__+=
m ad 58 1
on slide 6.
2 The Commission directed in their March 1 3
direction to staff that we take into account any 4
deficiencies or lessons learned or articulated by the 5
incident investigation team looking into the Three 6
Mile Island incident.
The findings that do concern t
7 the design basis threat are: one, vehicles are not 8
currently addressed in the design basis threat, and 9
specifically what should the licensee response be to 10 a vehicle intrusion? That was one of their findings.
11 A
second finding was licensee response can be 12 significantly affected by the mode of transport 13 utilized by the adversary.
We are integrating their 14 findings into our analysis, just to let you know that l
15 we are doing that.
16 (Slide)
Slide'7.
17 This particular slide was created 18 hopefu1]y to pass on as much information as we could 19 about the Trade Center bombing.
However, as I've 20 said, the gag order is in effect and it does address 21 and does affect all federal agencies.
So, I'm sort of 22 hung up there.
But the motivation of the adversaries 23 is still unknown, nor do we know the exact composition 24 of the explosive.
25 (Slide)
Next slide, please, slide 8.
t i
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 VfASHINGTON, D.C. 20005 (202) 234-4433 i
59 1
I would like to get into the current 2
options that the staff have under consideration and 3
have it included in the staff paper that supports this 4
meeting.
I would also like to remind you that the 5
current contingency planning that exists at all the 6
reactors does use a design basis vehicle, and we will 7
brief more detailed on what that vehicle is.
Just 8
keep in mind that all of the contingency planning is 9
premised on the fact that we have advanced information 10 of pending attack.
11 CHAIRMAN SELIN: Mr. Burnett, would you go 12 back to the previous chart for a moment, please?
13 Let's see if we can get the screen to go back to the 14 previous chart also.
15 When you say 500 to 1500 pounds of 16 explosive, that's sort of straightforward,
)
i 17 nitroglycerine type --
i 18 MR. BURNETT:
Well, that's what I said.
]
19 The exact composition is not known and if I refer 1
20 strictly to media reports, I have heard it go from 1
21 everywhere to a mixed composition, which would be 1
22 dynamites and high explosives, including ANFO, but I P
23 do not know --
24 CHAIRMAN SELIN:
But it's stuff you could 25 pick up at a construction site?
We're not talking NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON D.C. 20005 (202) 2344433 J
- A
60 as far as the 1
about Semex or some sophisticated 2
media are concerned, et cetera?
3 MR. BURNETT:
I wish I could tell you.
4 We're not.
I don't know.
I literally have not been 5
privy to the information.
6 CHAIRMAN SELIN:
I'm not that concerned 7
with what happened at Three Mile Island -- I mean at 8
the World Trade Center.
I am concerned in the design 9
basis whether we end up talking about stuff that's 10 readily available or some of the much more 11 sophisticated explosives that have been found with 12 terrorists later on.
13 MR.
BURNETT:
When we talk about 14 explosives in the design basis, we will talk in 15 equivalent terms of TNT.
16 CHAIRMAN SELIN:
Okay.
17 MR.
BURNETT:
So, we will make that 18 transition during the process.
19 CHAIRMAN SELIN:
Thank you.
20 MR. BERNERO:
And we can give you some 21 equivalences of these lesser or better high explosives 22 to relate to that.
23 MR. BURNETT: Okay. The first option that 24 I would -like to address, of course, is the edge of the 25 envelope and that.is no change.. There are some people NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON. D.C. 20005 (202) 2344433
61 1
that could argue that that is applicable because 2
intelligence sources still have not reported any 3
targeting of nuclear facility, and the official words 4
used by the FBI is that the chance of nuclear 5
terrorism is low.
Okay?
However, on the con side, 6
there has been now. the intrusion in TMI and the 7
incident at the World Trade Center and in neither did 8
we receive any advanced warning.
So, we certainly are 9
acknowledging that.
10 As for the cost, I would like to say it's 11 not specifically addressed on this slide, but the cost 12 of implementing the contingency plans that now exist 13 when they say, "Let's do it."
It cost them something 14 between $25,000.00 and $150,000.00 to create the i
15 documents and the necessary systems and it's estimated 16 that to put it into action will cost $4,000.00 a day.
17 (Slide)
Next slide, please, slide 9.
18 CHAIRMAN SELIN:
I'm sorry.
Just one 19 other question.
If the contingency plan, in this case f
20 it's really based on some intelligence --
21 MR. BURNETT:
Yes.
22 CHAIRMAN SELIN: -- as opposed to an event i
~
23 that happens on the plant, the contingency plan is 24 implemented, kept up for say two months just to be 25 arbitrary.
At the end of that time, is there any i
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D C. 20005 (202) 234-4433 I
l
62 1
deleterious effect on the security of the plant?
In 2
other words, having implemented the plant and then 3
coming back from it, obviously there are operational 4
problems while the plant is implemented.
But at the 5
end of the two months, does the licensee ability to 6
then react to a second contingency, is that negatively 7
effected or would these things be contingencies such 8
that once they've been done, other than the cost and 9
the inconvenience of having done them --
10 MR. BURNETT:
Hopefully he could call on 11 them a second time.
12 CHAIRMAN SELIN:
Yes, that's what I was 13 trying to say.
Thank you.
14 MR.
BURNETT:
Do keep in mind that 15 sometimes they are staff intensive.
Guard forces do 16 get burned out.
They may have to bring in second 17 sources of guards and implement that way.
But it's my 18 understanding that they could implement it a second 19 time.
20 Slide 9.
21 The second
- option, which is roadway 22 protection only, that again was one mentioned in 1988.
23 In this case, however, we've extended it slightly to j
24 give some protection on either side of the roadway so 25 that a car could not easily circumvent the gate.
If NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234 4433 WASHINGTON. D C. 20005 (202) 234 4433
63 1
the vehicle did get captured or engaged a roadway 2
protection system, keep in mind that some explosive 3
protection would result being caught at that position 4
rather than being able to penetrate and nestle into
[
5 some vital equipment.
Of course the remainder of the 6
perimeter would still be vulnerable and if an 7
adversary did a reconnaissance of his targets, he 8
could certainly see the most vulnerable portions of 9
the perimeter.
10 Option 3 --
11 COMMISSIONER de PLANQUE; Before you go on 12 to
- that, I'd like to understar.d how you would I
13 implement this in a practical situation. For example, 14 at a shift change.
If the barrier is not raised and i
i 15 lowered for every vehicle entering, then how would you 16 protect against the TMI type intrusion?
l t
17 MR. BURNETT:
There are many ways to put 18 in a vehicle denial syst'em.
There is a possible r
19 utilization of double barriers where the cars go 20 through one, one remains up and then it Xs out the l
21 second one.
22 COMMISSIONER de PLANQUE:
The air lock 23 equivalent, yes.
24 MR. BURNETT:
Yes.
Okay.
So, that would 25 counter what you just said there.
i L
NEAL R. GROSS j
COURT REPORTERS AND TRANSCRIBERS 1323.RHODE GLAND AVENUE, N W.
(202) 2344433 WASHINGTON. D.C. 20005 (202) 234-4433 l
~
64-1 COMMISSIONER de PLANQUE:
Except it would 2
also be a rather tedious process.
3 MR. BURNETT: It would add time and tedium 4
to the process.
5 MR. MIRAGLIA:
Or they can remove it to a 6
vehicle control access further out.
In other words, 7
move the vehicle access --
8 COMMISSIONER de PLANQUE:
Providing --
9 MR.
BURNETT:
Away from the protected 10 area.
11 MR. MIRAGLIA:
Away from the protected 12 area.
13 COMMISSIONER de PLANQUE:
But you would 14 only'see it as being effective either that way -- or 15 in that way against a TMI type intrusion?
16 MR. BURNETT:
Yes, because if there was a 17 spacing in your exiting vehicles, then obviously 18 somebody could exploit that spacing.
Generally we i
19 discourage vehicles coming into the protected area 20 except for those that are doing maintenance type work.
21 The parking lots generally, in fact in all cases,-are 22 outside of the protected areas.
So, during shift 23 changes, you really don't get that much of.these gates 24 being opened and closed.
25 COMMISSIONER de PLANQUE: Is that true for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
(202) 234-4433 WASHINGTON, D.C. 20005 (202) 234-4433
65 1
every plant?
2 MR. MIRAGLIA:
We're talking about -- go 3
back to the TMI analogy.
It was the second gate.
The 1
4 first gate is owner controlled property and was not 5
the protected area.
This would be defending the 6
protected area perimeter with those kinds of gates.
7 There's not a large number.
It's usually the egress 4
8 of personnel to the parking lot and then out.
P 9
MR. BURNETT:
And I'm not aware of any i
I 10 large scale parking that is within the protected area l
11 boundaries.
12 MR. MIRAGLIA:
Most security plans have 13 vehicle control. Only certain vehicles can get access 14 to within the protected area.
They, in most cases, 15 they only be' driven by certain authorized people.
16 MR. BURNETT:
Absolutely.
i 17 MR. MIRAGLIA: So, it's that access that's 18 being talked about here.
19 MR. BERNERO: I think the Commissioner may 20 be thinking that' if - you _did adopt this roadway 21 protection option at a site like TMI, you would be 22 drawn toward the bridges as the most effective place 23 to put them and then that would give you the problem l
t 24 of shift change.
25 COMMISSIONER de PLANQUE:
Right.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433
. ASHINGTON, D C. 20005 (202) 234-4433 W
66 1
MR. BERNERO: But in general, this kind of 2
barrier would be for the protected area, not for the 3
owner controlled area, for the very reason of that 4
shift change burden.
5 MR. BURNETT: And the recommendation would 6
actually be at the existing protected area barrier, 7
not in the case of TMI out at that bridge that's 8
three-quarters of a mile --
9 CHAIRMAN SELIN:
It just happens that 10 they're not putting their protection at the bridge, 11 they're putting their protection at the --
12 MR. BURNETT:
That's correct.
13 MR. BERNERO:
Protected area.
14 CHAIRMAN SELIN:
They have seven egress 15 points instead of the two bridges that lead to the 16 island.
17 MR. BURNETT:
Yes, sir.
18 COMMISSIONER de PLANQUE:
Okay.
19 MR.
BURNETT:
Let's see.
I was on 20 okay, I was on option 3.
In this option, the complete 21 perimeter would be protected, thereby negating the 22 advantages of doing reconnaissance by the_ attackers 23 and hitting the weak point. They would be required-to 24 protect the entire perimeter against a design. basis 25 vehicle.
Again, _some explosi/e protection would NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON. D.C. 20005 (202) 234 4433
67 l
1 result, but it would result in a varying degree of 2
protection and very unique on a site basis.
Some 3
sites have vital equipments located relatively close 4
to the protected area and I
will talk more 5
specifically about that in the classified section, and 6
that even engagement of the truck at that existing PA 7
could endanger those vital equipments.
While others, 8
the vital areas are much more internally located and 9
you might get a high level of protection even at the i
10 existing fence lines.
So, it is a variable.
11 In this case, call your attention to the 12 fact that in addition to the costs show for larger 13 perimeters, more access points, staff estimates could 14 go as high as $.3 million.
15 CHAIRMAN SELIN:
Could you stop for a a
16 second?
f 17 MR. BURNETT:
Yes, sir, 18 CHAIRMAN SELIN:
I have to tell you I'm 19 really struck by how low the estimates are to carry 20 out these options.
Do we have a way of -- have we 21 communicated with the licensees in doing this already 22 or do we have a way to test these against reality or 23 are they sort of so much per linear foot and so much 24 per barrier?
25 MR. MIRAGLIA:
Most of the cost estimates NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D C. 20005 (202) 234-4433
68
~
1 are based upon vendor supplied information and then we 2
have had -- we did talk with TMI in trying to get a 3
feel for the cost estimates that they have generated 4
for their fixes and what was involved in those kinds 5
of activities.
So, I think the public meeting --
6 CHAIRMAN SELIN:
Will we smoke these out
)
7 there because it would be very unfortunate if we made 8
a set of decisions and then found that there's an 9
order of magnitude difference with the --
10 MR.
MIRAGLIA:
We've tried to look at 11 that.
As Mr. Burnett just said, there's a range.
12 We've tried to give you averages. The sites are very, 13 very dif ferent.
The site perimeters go from 1,000 14 feet to 9,000 or 10,000 feet.
Various number of 15 access gates.
It's a very variable.
We try to come 16 up with some kind of a median estimate and then 17 there's --
18 CHAIRMAN SELIN:
Im not questioning the 19 way the estimate was done.
20 MR. TAYLOR:
No, we hope to get input on 21 this.
22 CHAIRMAN SELIN:
The question is can we 23 get some corroboration from the licensees.
24 MR. MIRAGLIA:
Yes, sir.
I think that 25 would be one of the things we would focus on on the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON. D C. 20005 (202) 234-4433
69 1
public meeting, is to try to get comments and 2
realistic estimates.
3 COMMISSIONER ROGERS:
And really try to 4
find the extremes, really clearly the most expensive 5
and clearly the least.
6 MR. MIRAGLIA:
Yes, sir.
7 COMMISSIONER CURTISS:
- Now, in that 8
- regard, I'm looking for it in your
- paper, but 9
somewhere in your paper you note that you've detected 10 already an increased demand for --
11 MR. BURNETT:
Yes, sir.
It could affect 12 availability.
13 MR. MIRAGLIA:
Yes, sir.
It's been noted 14 because we tried to make some estimates of how long 15 would it take and we got the response back depending 16 on availability and the demand is high right now.
17 COMMISSIONER CURTISS:
There are really 18 two points here.
One, as you point out in the paper, 19 it affects the schedule, the pace with which, if that 20 option is pursued, the licensee can move forward.
21 To the Chairman's point, when you get to 22 the meeting it may well be that you have some real 23 life experience with people who are now engaged in 24 procuring this kind of equipment.
25 MR. BURNETT:
Yes, sir.
Okay, sir.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D.C. 20005 (202) 234-4433
1 70 1
(Slide)
Moving to slide 11, option 4 2
would require the licensee to protect against a design 3
basis vehicle and a design basis explosive.
The big 4
advantage of this option, it would make all sites 5
consistent in their level of protection to both 6
vehicles and explosives.
Some sites we believe would t
7 be able to provide this protection at their existing j
8 protected area fences while others would have to 9
modify their protected area of fence line. This could 10 be done in two methods: one, actually moving the fence 11 line and the vehicle protection systems out to the 12 correct standoff distances, or leave the current 13 personnel detection fences where they are and just i
14 kind of put a hump on the outside of the fence with f
15 Jersey bounces or some other physical denial technique 16 to engage the vehicle only and not the people.
(
17 CHAIRMAN SELIN:
This one would be truly 18 a performance rule that you'd be talking about.
19 MR. BURNETT:
Yes, sir.
20 CHAIRMAN SELIN: As opposed to the others, I'
21 which are really very much prescriptive rules, do take 22 these steps as opposed to get these results.
23 MR. BURNETT:
And of course, this is the t
24 most expensive option.
t i
v 25 MR. MIRAGLIA:
And again, going to your NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l
1323 RHODE ISLAND AVENUE, N W.
l (202) 234-4433 WASHINGTON, D.C. 20005 (202) 234-4433 5
71 1
previous comment, Mr. Chairman, the cost here would be 2
very variable.
It would be very site-dependant 3
depending on the analysis and how fine and how 4
complete the analysis would be.
This could be a very 5
costly one.
And again, this is just a best estimate 6
on our part and I think we could perhaps flesh that 7
issue out also during the public meeting.
8 MR.
BURNETT:
I would add,
- however, 9
depending on the size of the explosive which then 10 drives the size of the vehicle, this particular option F
11 really has a very wide range totally dependant upon 12 those two factors.
13 COMMISSIONER CURTISS:
Let me just refer 14 back to Mr. Leventhal's testimony in 1988, because he 15 addresses this point specifically, and I'll just read 16 the short sentence.
1 17 "The fencing would have to be at least 100 18 yards away."
Now we can pursue the question of 19 whether 100 yards is an appropriate standoff distance 20 in the closed session, but he goes on to say, "and 21 that perhaps may be the most troublesome aspect.of 22 this from the perspective of the utilities because 23 some plant sites may not be large enough to allow 24 that."
25 As we get into the follow-on discussion, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D C. 20005 (202) 234 443?
72 1
I'd like to pursue the question of what the 2
implications are in terms of the standoff distance, 3
how it's calculated for individual sites and what the 4
implications are for individual sites, but I raise 5
that question now because, as I alluded to earlier, I
6 that cost consideration of option number 4 is the one 7
that I think drives that option, if I understand what 8
you've outlined.
9 MR.
MIRAGLIA:
And there may be some 10 substantial outliers in that regard.
l 11 MR.
BURNETT:
That's true.
We are L
12 prepared, however, to talk about standoff distances 13 versus explosive sizes in the classified meeting.
14 CHAIRMAN SELIN:
That's not really the 15 issue.
The question comes, if 95 percent of the 16 plants could easily meet, say, this 100 yard measure 17 and five percent would have to spend $20 million to do 18 it, would we really stick to the 100 yards?
Is the 19 differential between 80 yards and 100 enough?
Which 20 really gets to the point about how you do design basis 21 threats versus what we mean by these different terms, 22 you know, what needs to be in backfit and what I
23 doesn't.
24 MR. BURNETT:
And we've run preliminary 25 analyses on a few number of sites, like 26, that by 2
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l
1323 RHODE ISLAND AVENUE. N.W.
(202) 234-4433 '
WASHINGTON, D C. 20005 (202) 234-4433 l
73 1
putting a barrier at the existing fence what effective t
2 explosive protection would you get, and that's where 3
you're coming from.
4 CHAIRMAN SELIN:
But you have the same --
5 I mean, you have really two variables and one is the 6
cize of the explosive and the second is the standoff 7
distance.
8 MR. BURNETT:
Yes, sir.
9 CHAIRMAN SELIN:
Even if you get 10 comfortable with the standoff distance, then the next 11 question comes, how large a design basis threat? Now 12 10,000 pounds is going to war, so we're probably not 13 going to talk about 10,000 pounds of explosives, but 14 when you're talking between 2,000 and 2,500 you're 15 going to do the same calculations.
They're at the 16 point of rapidly diminishing return.
17 MR. BURNETT:
I think we have some data 18 that we can make available in the closed meeting.
19 CHAIRMAN SELIN:
Okay.
20 MR.
BURNETT:
That's the end of this 21 portion of the briefing.
22 CHAIRMAN SELIN: I believe we need a fifth 23 option and I would like to try to sketch out why I 24 think this.
Until there's an SRM there's no 25 requirement for it, but I'd like you to think about NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 2344433 WASHINGTON, O C. 20005 (202) 2344433
74 1
what would be involved in this.
It's sort of a long 2
discussion.
I apologize in advance, but I don't mean 3
it because I'm going to do it anyway.
I mean, I feel 4
bad but I'm not --
l 5
MR. BURNETT:
Not that bad.
6 CHAIRMAN SELIN:
Yes, exactly.
We can't 9
7 go to intelligence, we can't go to some particular 8
development in either doctrine in a document we've 9
picked up or in explosives and say, "Here's the threat 10 that everybody has to be defended against." No matter 11 how you do it, we are talking about design basis in 12 the same way that the Commission talked about in its 13 testimony before Senator Lieberman's subcommittee, 14 namely take a look at a range of threats and take a 15 look at a range of responses and see what makes sense.
16 Really, although I don't agree with I far from 17 agree with everything that Mr. Leventhal said, his 18 basic concept says, "Look, you can do something about 19 this.
Why don't you do about it?" is really not very 20 far from a reasonable logic.
Different people will 21 come to different conclusions, but how tough is it to 22 fix and how much of a range of things can we fix is a 23 reasonable set of questions.
,t 24 It doesn't fit in very well with our logic l
25 that says this is the kind of risk to a power plant NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 234-4433 WASHINGTON, D.C. 20005 (202) 2344433
75 i
1 that everybody has to fix regardless of the cost and i
2 here's what we have to do, some tradeoffs.
One power 3
plant will turn out it's going to cost them 4
$300,000.00 and they should do it, another one is at 4
5
$500,000.00.
Does that mean they shouldn't do it?
6 We're not really set up for the formal process of 7
setting up -- saying, "This must be done and this will 8
depend on the cost with this move continue."
9 So, I would like you to consider another 10 option which is a little different from these, which i
11 basically says something like the following.
We 12 really are concerned.
We'd like the plants to take a 13 look at what it would cost to -- I'll make up some 14 numbers -- to handle 2,000 pounds at 100 yards from a 15 vehicle going no faster than 50 miles an hour and use 16 some common sense, taking into account your geography, 17 et cetera.
We basically ask the plants if they'll do
[
18 this without going to the point of passing a rule that 19 says you must do this and see what the results are and 20 after you get the results and then we go and say, "Do 21 we have to take'further action?"
22 Now, that's not exactly what I'm calling
'23 for, but my point is that each of the Commissioners-24 one way or another has said there are huge differences 25 from plant to plant.
One thing that seems to me that NEAL R. GROSS j
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
(202) 23 4 433 WASHINGTON, D.C. 20005 (202) 2344433
76 1
is not unreasonable may turn out to be a bad idea.
It 2
may turn out it's too hard to do and I'd sort of like 3
your reaction about whether you could do something 4
like this before we do the SRM, not afterwards, because I don't want to ask for something that's 6
impossible.
But maybe the status quo ante shouldn't 7
be -- in other words, a situation which would have to 8
be remedied by the rule needn't be what we have today, 9
but could be something where the Commission as a i
10 matter of policy expressed an interest in having the i
11 plants do what they reasonably can do to respond to r
12 this, see what the licensees would say they would do f
13 and then see if we need to go further than that with i
14 a rule.
This is something where you have to speak 15 very closely to the general counsel and say do we have 16 the authority to do something like this, would this be 17 an undesirable precedent? But, in effect, it would be 18 to bring the licensees in to looking at what the 19 design basis threat should be and what the response
[
20 should be and give it a chance to see if it turns out 21 that the Commission feels there's a question of l
l 22 policy, there should be some response to a vehicular
[
23 bomb, and it's a big if, what the licensees could do, I
24 what they'd be willing to do without being mandated to l
25 do it and see, after we went through that cycle, how I
1 L
NEAL R. GROSS COURT REPORTERS AND TRANSCR!BERS 1323 RHODE ISLAND AVENUE, N.W.
(202) 234 4433 WASHINGTON, D.C. 20005 (202) 234 4433 l
i
77 1
much more we would require in a rule.
i 2
Now, it may turn out that the Commission 3
doesn't want to do this, but I think you have to look 4
at a wider range of options than just we have these 4
5 kind of mandates we can put out, because this is f
r C
6 really a peculiar situation.
It just doesn't fit into 7
the normal pieces, both because it's hard to say, "Is 8
this something everybody must do, or is it a cost l
r I
9 benefit analysis?" and also because the situations are 10 just so different.
l 11 I would almost consider a rule that says l
12 every licensee must spend
$300,000.00 to defend 13 against a vehicular -- let's see what we get for it.
14 I'm exaggerating.
I don't mean that literally, but 15 what I'm saying is that --
16 COMMISSIONER ROGERS:
Mr. Parler would be 17 very uncomfortable.
You got his attention.
18 CHAIRMAN SELIN:
In other words, the 19 resources are central to this.
If you can do it 20 easily, why don't you do it without forcing us to i
21 order you to do it?
And if it's really hard, tell us 22-about it and let's see if there's a problem between
)
+
23 the two.
There may or may not be a.way to come'up I
24 with an option that counts for something like that.
25 We have to live within our own rules.
We can't set a i
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N.W, (202)1344433 WASHINGTON, D C. 20005 (202) 234-4433
]
78 1
whole new legal framework for a situation.
But I 2
don't believe that this type of situation was really 3
foreseen when we set up the sharp distinction between 4
this is what's required and this is a cost benefit r
5 analysis.
i 6
MR. TAYLOR:
We'll mull on that one, Mr.
7 Chairman.
That's about as far as I can go.
8 CHAIRMAN SELIN: Well, I mean we need some 9
interaction.
I don't want to --
10 MR. TAYLOR:
I understand.
11 CHAIRMAN SELIN:
But if there is an 12 approach that would be followable --
13 MR. TAYLOR:
Let us think through that, j
14 CHAIRMAN SELIN:
-- I would like to know 15 that before we end up giving you the instructions on 16 how to respond to this piece.
17 Commissioner Rogers?
18 COMMISSIONER ROGERS:
Yes.
I'd just like 19 to say that I find the Chairman's remarks very i
20 interesting and somewhat appealing, but they also 21 bring to mind the other side of that coin and that is L
22 one that was pointed out to us I think by the 23 Administrative Conference of Paper, I think it was, on I
24 nonprescriptive regulation, the enormous costs that 25 come about when there is too much freedom left in the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON. D.C. 20005 (202) 234-4433 m
79 1
system without enough specificity.
I think the 2
question was how high to put a fire extinguisher, you 3
know, and if you leave it to the licensee to decide 4
the proper height of the fire extinguisher to meet all 5
the possible situations, handicapped and various other 6
needs that might have to be addressed, the cost of i
7 trying to implement that is enormously greater than f
8 saying "the fire extinguisher should be a height at.
9 three and a half feet off the floor," period, just put t
10 it there.
11 And I think that that's another aspect of 12 this that one has to take into account, because I can 13 see the difficulties that licensees might have in l
l 14 grappling with these things.
"What should we do?"
15 Not "What can we do?" but "What should we do?" And so j
16 I think that while I agree that somehow we have to --
i i
17 I like the idea that there's yet another way of j
18 looking at this than just the options that have been i
19 offered to us, because I think there has to be more j
20 practicality interjected into this.
j 21 I do think at'some point we may have to 22 say "This is what you must do," if we can.
Now I know i
23 there's the legal aspects of that, but I think that 24 somehow we've got -- we can't just dump it back on the 25 licensees.
I think we'll have to give guidance in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W.
(202) 2344433 WASHINGTON. D C_ 20005 (202) 234 4433 m
m w---*
--.--- - m
80 1
1 some way.
Now whether it's a legal requirement or 2
not, I don't know. These are things that will have to f
3 emerge.
But I do think it is important to keep in 4
mind that whoi too much freedom is left, that that's I
5 also a very difficult situation to deal with.
It
[
6 doesn't necessarily simplify it for the licensee.
7 CHAIRMAN SELIN:
Do you have other points i
8 you want to --
l 9
COMMISSIONER ROGERS:
No.
10 CHAIRMAN SELIN:
Commissioner Curtiss?
l 11 You're not struck dumb by all this?
i 12 COMMISSIONER CURTISS:
Well, I'm struck.
t 13 I'm not sure I'm struck dumb.
14 CHAIRMAN SELIN:
Speechless.
1 15 COMMISSIONER CURTISS:
Speechless.
16 CHAIRMAN SELIN:
Commissioner Remick?
17 CO'(MISSIONER REMICK:
Just a
couple 18 questions. What do we know about what other countries 4
19 are doing from the vehicle threat standpoint?
1 20 MR. BURNETT:
I have some general data my 21 staff was putting together knowing this question was 22 coming, but I can also start.
For instance, some 23 countries, in particular the U.K.
- yes, that's i
M right. Be careful with classified, he just warned me.
25 COMMISSIONER REMICK:
You can provide it NEAL R. GROSS COURT REPORTERS AND TWSCRIBERS 1323 RHODE ISLAND AVENUE. N W.
4Mt 34-4433 WASHINGTON. D.C. 20005 '
(202) 2 % 4433 _
l
5 81 1
later.
2 MR. BURNETT: Can I better discuss this in 3
the classified section?
4 COMMISSIONER REMICK: Or provide it later, 5
that's fine.
Just curious.
l t
6 MR. TAYLOR:
I think we better.
i 7
COMMISSIONER REMICK:
Has the staff as of 8
this afternoon decided that public health and safety 9
is not being adequately protected from the N bicle as I
10 a result of not --
j 11 MR. TAYLOR:
We're not ready --
12 COMMISSIONER REMICK: You're not~ prepared I
13 to yet.
14 MR. TAYLOR:
-- to answer that today.
i 15 COMMISSIONER REMICK:
I'm thinking about 16 what was requested of us by Mr. Leventhal.
I L
17 The other thing, if the Commission should f
18 decide to require permanent vehicle barriers -- I'm 19 looking at the General Counsel at the moment -- and if 20 I read 50.13 as a Philadelphia lat a t ' ow do I 21 reconcile the wording there?
i 22 MR. PARLER: Well, you would have to go to 23 the background of 50.13 and not just stop'with the 24 wording itself.
Obviously there would have te 25 reconciliation, at least in my judgment, soix ' ace, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS j
1323 RHODE ISLAND AVENUE. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005 (202) 234-4433 Y
t
82 1
either in the rule that may come out of this subject, 5
2 this discussion, the follow-up meetings, et cetera.
l a
3 That would probably be the way to do it.
I 4
If you look at the background of 50.13, it 5
was the result of an issue that was raised in'the '60s l
6 in the Turkey Point proceeding by a lawyer that used 7
to work with us that went down to Florida to practice 8
law, and the focus there was on attacks from enemies 9
of the United States, specifically in that case 10 because of the situation in Cuba.
If you forget about l
11 that background and just look at the words themselves 12 in the regulation -- it talks about design features, F
13 et cetera, et cetera -- there would be perhaps some 14 lack of clarity at least on the part of those that are i
15 not familiar with the origins of the 50.13.
16 So there should be, to
- repeat, some 17 putting of the 50.13 in perspective in whatever I
l 18 change, if any, might come out of this exercise.
19 COMMISSIONER REMICK:
Would that include l
20 possibly needing to revise 50.13?
21 MR. PARLEn.
wouldn't think so.
i i
l 22 COMMISSIONER REMICK:
You would not think i
23 so?
24 MR. PARLER:
No, sir.
25 COMMISSIONER REMICK:
Okay.
Thank you.
i s
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVENUE, N W 7
(202) 234 4433
- WASHINGTON, D.C. 20005
. (202) 234-4433 7
h
-~
83 1
CHAIRMAN SELIN:
Anything else?
2 COMMISSIONER REMICK:
No, thank you.
j 3
CHAIRMAN SELIN:
Commissioner de Planque?
4 COMMISSIONER de PLANQUE:
No.
l 5
CHAIRMAN SELIN:
Did you care to say 6
anything else before we go to the closed session?
l i
7 MR. TAYLOR:
We have nothing else.
t i
8 CHAIRMAN SELIN:
Fine.
Why don't we take 9
a short break in which the room will be cleared?
l l
10 (Whereupon, at 4:15 p.m.,
the above-11 entitled matter was concluded.)
12 13 i
14 15 16 4
17
.i 18 t
19 i
20
{
21 22 i
-i 23 l
i 24 25 l
l NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS l
1323 RHODE ISLAND AVENUE. N.W,'
(202) 2344433 WASHINGTON, D.C. 20005 (202) 2344433 h'
t CERTIFICATE OF TRANSCRIBER This is to certify that the attached events of a meeting of the United States Nuclear Regulatory Com:nission entitled:
TITLE OF MEETING: BRIEFING ON DESIGN BASIS THREAT REEVALUATION PLACE OF MEETING: ROCKVILLE, MARYLAND DATE OF MEETING:
APRIL 22, 1993 I
were transcribed by me. I further certify that said transcription is accurate and complete, to the best of my ability, and that the transcript is a true and accurate record of the foregoing events.
/_M mig-d
'j Reporter's name:
Peter Lynch i
a h
t NEAL R. GROSS COURT RODORT9R$ AND TRANSCRIRERS
' 1333 RHODE ISLAND AVENUE, N.W.
I (202) 234 4433 WASHIN010N. D.C. 2000$
(202) 232 4 000
'f
i O
fog COMM,,*%
~\\
g N
tu
\\
.p i
W$*
%,#4v.i.sG*p o
l J
1
6 e
OPEN COMMISSION MEETING - APRIL 22.1992 VEHICLE THREATS O
BACKGROUND OF CURRENT ACTIVITIES O
PAST COMMISSION DELIBERATIONS i
O CURRENT OPTIONS FOR CONSIDERATION i
l j
O STAFF CONCLUSION 1
l
BACKGROUND O Current Reconsideration Reflects Cancerns Raised by TMI Intrusion and World Trade Center Bombing O Nuclear Control Institute Request to Reopen Petition for Rulemaking and Request for Action, February 19, 1993 O Commission Meeting, March 5,1993, Included Presentations by CIA and FBI O Senate Hearing on Nuclear Power Plant Security, March 19, 1993 O Staff Two Phase Plan to Revisit Design Basis Threat
- Phase 1 - Revisit 1985 through 1988 Commission Deliberation
- Phase 2 - Multimonth effort to examine design basis threat l
2
~
m--m--
-m--
PAST COMMISSION DELIBERATION - THE OPTIONS O
SECY-88-127, dated May 10, 1988, provides finalized list of six options O
Contingency Planning (3 options)
NRC HQ Contingency Plan Licensee Short-Range Contingency Planning Licensee Long-Range Contingency Planning O
Physical Security Measures (3 options)
Roadway Access Denial Protected Area Denial Vehicle Bomb Protection f
3
_ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ = _ _ -
SUMMARY
OF ASSESSMENTS AND GUIDANCE O Other Agencies Providing Threat-Related Information, Assessments, Participation in Commission Meetings
- Central Intelligence Agency
- Federal Bureau of Investigation
- Department of Energy O Guidance Solicited from NSC (DOD, DOE) 4
...w--.
1988 DECISION O Commission De sion
- Generic NRC HQ contingency plan for use in event vehicle bomb threat arises
- Licensee short-range contingency plan O Staff Issues Generic Letter 89-07, " Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs," dated April 28, 1989 i
O Staff Specifies A-Conservative Design Basis Vehicle (SGI) for Planning Purposes s
- _ _ _ - _ _ _ _ - _ _ _ _ - _ _ - _ _ _ _ - _ _ = _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ -
BACKDROP FOR CURRENT LIST OF OPTIONS l
0 Intrusion at Three Mile Island, February 7,1993 Incident Investigation Team Findings 1.
Performance objectives of 10 CFR Part 73 for establishing and maintaining a physical protection system do not effectively address the use of a vehicle for entering the.
protected area.
- 2. Method of entry into the protected area significantly affected the security program response strategy toward protecting the vital areas and protecting against radiological sabotage.
6 n.,
-,,-.,e
~
n a-a,
BACKDROP FOR CURRENT LIST OF OPTIONS - continued O World Trade Center Bombing, February 26,1993 Tentative Information 1.
Initial media reports indicate a van, loaded with between 500 and 1,500 pounds of explosive, was used in the attack in a public parking garage under the Vista hotel.
- 2. Motivation unknown.
7
.~.
CURRENT OPTIONS FOR CONSIDERATION O OPTION 1 - No Change Pro: Procedures established for temporary measures within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after notification by NRC to establish safe standoff distances.
A Safeguards Information addendum characterized a design basis tnick bomb.
Available threat-related information suggests that the threat to nuclear facilities is low.
Con:
Experience of TMI intrusion into protected areas not addressed.
Relies on advanced warning from the Intelligence Community, but the World Trade Center bombing demonstrated that a threat could materialize in the United States without being detected.
Costs: None 8
e.
n.
e
CURRENT OPTIONS FOR CONSIDERATION - CONTINUED O OPTION 2 - Road Protection - On existing roadways and some distance on either side of the vehicle control points into protected areas.
Pro: Would protect against a Three Mile Island type intrusion.
Con:
Remainder of the protected area perimeter vulnerable.
Cost to Licensee:
For four protected area access points with 4 active barriers and 400 feet of concrete barriers, the total initial capital cost would range between $200,000 and $300,000.
Costs would vary would vary by site.
l Cost to NRC: A one-half FTE to conduct licensing reviews and.5 FTE to inspect systems.
Schedule: If barriers are available, staff estimates that it would take 6 months for licensees to implement this option.
9
CURRENT OPTIONS FOR CONSIDERATION - Continued O OPTION 3 - Protected Area Perimeter Protection - Against vehicular intrusions PA.
Varying degrees of protection against a vehicle bomb.
Pro: Enharced, but varying, degrees of protection against vehicle attempting to rapidly approach vital areas, through the protected area, to cause radiological sabotage.
Con:
Protection against a vehicle bomb would be highly site specific and could be low at some sites.
Cost to Licensee:
Estimated typical initial capital cost between
$300,000 and $400,000.
Actual costs are site & measure specific.
Cost to NRC: A one-half FTE for licensing reviews and 1 FTE inspect systems.
Schedule:
6 months to implement, if active barriers available.
10 g
e a
CURRENT OPTIONS FOR CONSIDERATION - Continued O OPTION 4 - Vehicle bomb protection derived from within a range of postulated threats - Protection against vehicle int.rusions and design basis vehicle and explosive device.
Pro: All licensees would provide at least a known, consistent level of protection against vehicle intrusions and a land-vehicle bomb.
Con: Some sites may require either an additional layer of security and a commitment of additional security officers for the life of the plant or significant modifications to existing protected areas.
Cost to Licensee:
Estimated initial capital cost between $500,000 and $800,000.
Actual costs are site and measure specific.
Cost to NRC:
Four FTE to confirm licensee analyses,1 FTE licensing reviews, and 1.5 FTE inspect systems.
Schedule:
Nine months to implement if barriers available.
11
STAFF CONCLUSION O That staff recommendation be delayed until after the May 10, 1993, public meeting on the DBT for radiological sabotage to allow for staff consideration of public input.
l l
l l
12 n
-...-- y
~. - -
n.