Application for Amend to License SNM-1107 Per 930318 Discussion
ML20035G516
Person / Time
Site: Westinghouse
Issue date: 04/21/1993
From: Nardi A
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
CON-NRC-93-010, CON-NRC-93-10 NUDOCS 9304280029
Download: ML20035G516 (4)


Text

--_. -

?

l l

l Westinghouse Commercial Nuclear y g,3,,,7g73g Electric Corporation Fuel Division w3 773 mo NRC-93-010 April 21,1993 Chief, Licensing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

SUBJECT:

REQUEST FOR AMENDMENT TO LICENSE SNM-1107, DOCKET 70-1151 The Westinghouse Electric Corporation (WEC) hereby requests an amendment to the Special Nuclear Material License for the Columbia Fuel Fabrication Facility (CFFF). This request is a follow-up to discussions between Mr. Thomas Wenck (the CFFF Project Manager), and other members of NRC Licensing Staff, and Messrs. Charles Sanders and Robert Williams representing WEC at your offices on March 18, 1993. The enclosure to this letter provides detailed information relating to this request, in the form of changed pages to SNM-1107.

i If you have any questions regarding this matter, please contact our Mr. Robert Williams. He can be reached on (803) 776-2610 (Ext. 3393).

Sincerely, WESTINGHOUSE ELECTRIC CORPORATION

/

'42 (( &f j-U

.hjy A. J. Nardi, Manager Regulatory Services l

Itm l

200059 i

9304280029 930421 PDR ADDCK 07001151 N

C PDR The Wesung1ouse Commercia/Nuclearruetumivu - Winnerofthe 1988MalcolmBaldrigeNahona/Oualih'Awar.

l

i I

l SCHEDULE OF REVISIONS j

Page Revision Page Revision Number Number Number Number 3.1-10 2

3.1-11 2

3.1-12 3

3.2-1 2

3.2-2 2

3.2-3 2

l 3.2-4 3

3.2-5 2

3.2-6 2

3.2-7 2

3.2-8 3

3.2-9 3

3.2-10 2

t 3.2-11 3

l 3.2-12 3

3.3-1 2

3.3-2 2

3.3-3 2

4.0-1 3

4.1-1 14 4.2-1 3

4.3-1 2

4.4-1 3

4.5-1 14 4.6-1 2

4.6-2 2

4.7-1 8

4.8-1 14 4.8-2 14 4.9.1 25 Docket No. 70-1151 Initial Submittal Date:

4/30/83 Page No.

vii License No. SNM-1107 Revision Submittal Date:

4/21/93 Revision No.

25

REVISION RECORD

' Revision Date of Number Revision Paaes Revised Revision Reason 13 7/23/87 New pages 1.11-6 Added authorization for through 1.118.

off-site drying of calcium fluoride.

14 8/14/87 Revised page 4.5-1.

Added drying of calcium fluoride to scope of operations.

Revised pages 4.8-1 Delete Western Zirconium i

and 4.8-2.

as an authorized recipient of HF.

l l

Revised page 4.1-1.

Update document date.

l Revised pages 1.11-2 Added encapsulated 1.11-4,1.11-5, and materials to briquetting 1.Il-6.

description.

15 8/18/87 New pages 1.14-1 thru Added criteria to 1.14-5 and 2.2-14.

preclude foreign contaminants from UF. cylinders.

j 16 1/25/88 Revised page 2.2-3.

Add interlock pressure requirement positive pressure gloveboxes.

17 2/8/88 Revised page 2.5-1.

Update of Emergency Plan Section.

18 5/25/88 Revised page 2.5-1.

Update of Emergency Plan Section.

I 19 8/12/88 Revised page 2.5-1.

Update of Emergency Plan Section.

20 9/30/88 Revised pages 2.1-2.

Add frequency criteria 2.1-3, 2.2-9 and to the definitions 2.2-10.

Section.

Revised criteria for bulk containers.

21 6/23/89 Revised page 2.5.1 Update of Emergency Plan Section.

22 1/30/91 Revised page 2.5.1 Incorporate Site Emerg. Plan into license, to replace Radiological Contingency Plan.

1 23 7/16/92 Revised page 2.5.1 Update Site Emerg. Plan.

l 24 1/20/93 Revised page 2.5.1 Update Site Emerg. Plan.

25 4/21/93 New page 4.9-1 Added authorization for making license changes.

l l

t Docket No. 70-1151 Initial Submittal Date:

7/23/87 Page No.

ix l

License No. SNM-1107 Revision Submittal Date:

4/21/93 Revision No.

25

4.9 Chances to Sections 2,

3, or 4 of the Annroved License j

Application j

4.9.1 Chances Reauirina Prior Approval Westinghouse shall make no change that would decrease the

)

effectiveness of Sections 2,

3, and 4 of the approved license application, without the prior approval of duly authorized Nuclear Regulatory Commission Staff.

Requests for such changes shall be made through submittal of an application for license amendment pursuant to 10CFR70.34.

4.9.2 Chances Not Reauirina Prior Approval Westinghouse may make changes that would not decrease the I

effectiveness of Sections 2,

3, and 4 of the approved license application, without the prior approval of duly l

authorized Nuclear Regulatory Commission Staff.

Westinghouse shall maintain records of such changes --

including justification, safety demonstration, and management approval -- in dedicated datapacks, to enable l

l NRC Staff inspection upon inspector request. The datapacks shall be retained for a period of five (5) years from the date of the change.

Further, a report containing a description of each such change shall be furnished to the Chief, Licensing Branch, Division of Fuel Cycle Safety and Safeguards, U.

S.

Nuclear Regulatory Commission, Washington, DC 20555, within six (6) months of implementing the change.

1 l

l l

l Docket No. 70-1151 Initial Submittal Date:

4/30/83 Page No.4.9-1 License No. SNM-1107 Revision Submittal Date:

4/21/93 Revision No. 25