ML20035F960

From kanterella
Jump to navigation Jump to search
Monthly Operating Status Rept for Feb 1993 for McGuire Nuclear Station Units 1 & 2
ML20035F960
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/28/1993
From:
DUKE POWER CO.
To:
Shared Package
ML20035F957 List:
References
NUDOCS 9304230127
Download: ML20035F960 (1)


Text

_

k 4

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT February 1993 1.

Personnel Exposure -

Duke Power Company has changed the monthly monitoring exposure report to quarterly.

First quarter TLD results will be available for inclusion in the April 1993 report.

2.

The total station liquid release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for February has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this list.

9304230127 930414 PDR ADOCK 0"4003 9 R