Rev 4 to Engineering Operating Procedure 42-6.00, Design Verification Status Change Notice
ML20035F232
Person / Time
Site: 05200001
Issue date: 06/18/1990
From:
GENERAL ELECTRIC CO.
To:
Shared Package
ML20035F225 List:
References
EOP-42-6.00, NUDOCS 9304210060
Download: ML20035F232 (5)


Text

._

i Employees Only l

EOP 42-6.00 Engineering Operating Procedure supplement A

SUBJECT:

DESIGN VERIFICATION STATUS CHANGE NOTICE SD-028A h) GENuclearEnergy Design Venfication Status Change Notice Design Verification Q

gngg, __3__, op Q i

Status Change Notice

[

Re?e*erce DRF No.

Associated EON /ERtA!!)DR/FDDR No.

I V'*dcatort of the cocuments hsted herem a deterred for the hsted I rop ts Ve+dcation prevously cebrred by DVSONs a now complete for the cocuments and profects hsted herein, Profe::s-CNnrge Nu Reasort l

Hold Recuirements-b i

Schedues competon cate for verdcatort FW l

- s,-

DOCUMEM CENT *C DOCUMENT TM TA E ENT OR Su PS

- 1CTMER NOTESI O-for Addition,a1 Entries Use Continuation Sheet 50-0288 D!$TR'5JTON Ets ACTON WPS$ N3TFIED l

Date Issued Revision S p rsedes Page June 18, 1990 4

Rev. 3 (7/20/87) 1 of 5 9304210060 930406

)

PDR ADOCK 05200001 A-PDR-

Employees Only EOP 42-6.00 Engineering Coerating Procecure Supplement A DESIGN VERIFICATION STATUS CHANGE NOTICE CONTINUATION SHEET SD-028B

) GENuclear Energy Design t'erification S:atus Change Notice Design t'en5 cation sneer b or Status Change Notice D#

[,p pgl

"jrje{'{*

oxuuse etc.o oo: w s,n m a t

l i

i l

Issued: 6/18/90 Revision 4 Page 2 of 5 l

l Employees Only l

EOP 42-6.00 Engineenng Operating Procedure supplement A DESIGN VERIFICATION STATUS CHANGE NOTICE - FORM COMPLETION INSTRUCTIONS l

ITEM NOTE:

All blocks are completed by the Responsible Engineer, except where noted differently.

A.

Preprinted DVSCN serial number (enter on any continuation sheets).

l B.

Enter sheet sequence number.

C.

Identification number of Design Record File in which verification data is or will be located.

D.

Circle one, then enter corresponding document number; or enter "N/A" if there is no ERM, ECN, DDR, or FDDR associated with this DVSCN.

E.

Place an X in this block if independent design verification is being deferred.

F.

Place an X in this block if independent design verification has been completed, and list all DVSCN's that created the deferred status now being l

closed.

G.

List ea:h affected project with its applicable charge number listed immediately below.

H.

Enter the reason for deferral, or the basis for removing the deferral condition.

1.

Enter any limitations on the application of the data or product hold reouirements resulting from the deferred verification.

J.

Date on which design verification will be completed (this date will be entered into WPSS).

K.

Signature and component number of Responsible Engineer. Date of signature.

L.

Signature and title of Responsible Manager. Date of signature.

M.

Signature and title of Section Manager authorizing deferral of independent design verification. Date of signature.

N.

Distribution key codes, project names, or names and mail codes of indi-viduals who are to receive copies of DVSCN.

Issued: 6/18/90 Revision 4 Page 3 of 5

l I

I Employees Only EOP 42-6.00 Engineenng Operating Procedure Supplement A DESIGN VERIFICATION STATUS CHANGE NOTICE - FORM COMPLETION INSTRUCTIONS (continued)

ITEM P.

Enter identification numbers of documents affected by design verification status change.

I Q.

Record the Completion Status Code'that EIS should show as the result of i

this DVSCN:

i Incomplete document for which no further work is planned.

(Typi-S cally applied to documents applicable to only suspended or cancelled projects.)

I l

U Unverified or deferred verification, i

l

  • R Incomplete for both internal and external reasons.

l l

  • E Incomplete for external reasons (awaiting customer or supplier j

input).

l l

  • I Incomplete for internal reasons (awaiting GE-NE input).

Complete

  • C N

Not evaluated (no status code has been assigned to this document).

These four "ICER" codes also appear on the issued document. When any of these codes are used in EIS or on a Design Verification Status Change Notice (DVSCN), they must be the same as the status code marked on the issv;d document.

R.

For each document, enter one of the following, based on the document distribution code:

PR if coded PR PS if coded PS-N if none of the above S.

Enter applicable Master Parts List (MPL) item number for each document.-

If document is sublevel, identify as

~

T.

Enter the document title.

U.

For DVSCNs that complete verification, enter location of the verification statement, such as the DRF or ECN number when appropriate. Also enter the Issued: b/18/90 Revision 4 Page 4 of 5

i l

i I

Employees Only EOP 42-6.00 Engineering Operating Procedure supplement A DESIGN VERIFICATION STATUS CHANGE NOTICE - FORM COMPLETION INSTRUCTIONS (continued) l i

ITEM I

identification numbers of any documents that. support the completion of design verification, e.g. test reports, etc.

I V.

Initialed and dated by Configuration Management & Document Control.

i i

i i

}

Issued: 6/18/90 Revision 4 Page 5 of 5

, -,