ML20035E737
| ML20035E737 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 03/31/1993 |
| From: | Campbell W, Mcinvale J UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-2791, NUDOCS 9304190170 | |
| Download: ML20035E737 (6) | |
Text
_
- mo, Etscriac h
April 8,1993 j
Callaway Plant Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 UL.NRC-2 7 9 l'
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANTUNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MARCH.1993 L
The enclosed Monthly Operating Report for March,1993 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
l
/
/
W. R. CampbcIl
.,ps p
Manager, Callaway Plant 4/
WRC/DEY/J M/ TAM /J M/cre Enclosure cc: Distribution attached L
Y 9304190170 930331 PDR ADOCK 05000483 R
/ b 'i t;.
Maky A#est P.O. Box 62Q Fulton, MO 65251_.
I
}
cc distribution for ULNRC-2791 i
with enclosures Mr.1. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commi sion Region III i
799 Roosevelt Road i
GlenEllyn,IL 60137 Mr. L. R. Wharton (2 copies)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
(
l White Flint, North, Mail Stop 13E21 I155 Rockville,MD 20852 NRC R:sident inspector i
Manager, Electric Department Missouri Public Service Commission I
P.O. Box 360 Jefferson City,MO 65102
?
f i
a J
1 I
4 t
. +
DOCKET NO.
50-483 i
UNIT NAME CALLAWAY UNIT 1 l
' DATE 4-08-93 COMPLETED BY J. B. McInvale TELEPilONE 314/676-8247 PART A OPERATIONS SUhtMARY The p an: operated at approximately 100% power for the entire month with the following execption:
On 3-19-93 load was reduced to 93% to perform main turbine controh21ve testing. Full power operation resumed on 3-20-93.
j PART B PORV AND SAFETY VALVE
SUMMARY
[
9 None d
[
+
- -=
l r
PART C AVERAGE DAILY UNIT POWER LEVEL' DOCKET NO 50-483
.l UNIT Callaway Unit 1 DATE 4-08-93 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 MONTH: MARCH 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1170 17 1178 r
2 1171 18 1174 1
3 1174 19 1170 4
1175 20 1157 5
1175 21 1169 6
1174 21 1165 7
1174-23 1171 8
1175 24 1173 i
9 1176 25 1168 10 1175 26 1166 11 1176 27 1165 12 1177 28 1161 13 1179 29 1156 j
14 1176 30 1151 15 1168 31 1167 16 1169 i
l l
l a
. i, I
I t
PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 4-08-93
'(
COMPLETED BY L B. McInvale l
TELEPHONE 314/676-8247
'5 OPERATING STA7US
- i (YTD)
(CUM)
.j 1.
RFJORTING PERIOD: MARCil 1993 GROSS IlOURS IN REPORTING PERIOD:
744 2160 72,565.5 1
2 CURRENTLY AUTIIORIZED POWER LEVEL (MWt): 3565 MAX DEPEND. CAPACITY (MWe-Net): 1120 l
DESIGNELECTRICALRATING(MWe-Net)* 1171 l
3.
POWER LEVEL TO W111CII RESTRICTED (IF AhT)(MWe-Net):
i 4.
REASONS FOR RESTRICTION (IF ANY).
j THIS MONTII YR TO DATE CUMULATITI 5.
NUMBER OF llOURS REAC1DR WAS CRITICAL 744.0 2,160.0 63,537.7 l
i 6.
REACTUR RESERVE SIIUTDOWN llOURS 0
0 0
- ?
' LOURS GENERATOR ON LINE 744.0 2,160.0 62,215.7 7.
i 8.
' UNIT RESERVE SIIUTDOWN llOURS 0
0 0
9.
GROSS TIIERMAL ENERGY GENERATED (MWil).
2.625.029 7,610.211 208,690,161 l
10.
GROSS ELFCFRICAL ENERGY GENERATED (MWII).
910,746 2,642,274 71,204,170 b
11.
NET ELECTRICAL ENERGY GENERATED (MWII) 870,612 2,525,239 67,699,337 i
12.
REACTOR SERVICE FACTCR.-
100.0
. 100.0 87.6 13.
REACTOR AVAILABIUTY FACTOR -
100.0 100.0 87.6 j
i 14.
UNIT SERVICE TACWR -
100.0 100.0 85.7 i
15.
UNIT AVAILADILITY FACTOR 100.0
'100.0 85.7
' 6.
UNITCAPACITY FACTOR (Ihing MDC) 104.5 104.4 83.3 17.
UNIT CAPACITY I' ACTOR (Using Design MWe).
99.9 99.8 79.7 0.0
- 0.0 2.8 18 UNIT FORCED OUTAGE RATE 19.
SliUTDOWNS SCIIEDULED OVER NENT 6 MONTIIS (TYPE, DATE AND DURADON OF EACll):
20.
IF SIIUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:
)
1 l
q i
l i
e q
4
'r
'a PART E tJNIT SillTfDOWNS AND PO%TR REDLETIONS DOCKET NO.
50-483 UNTINAME CALIAWAY UNTT I DATE 448-93 CUMPLETED BY 1 B. McInvale TELEPIIONE 314'676-8247 REPORT MONTil: MARCil 1993 METilOD OF TYPE SIRTITING DOWN F: FORCED DURATION Tile REACIUR OR NO.
-DATE S; SCIIEDULED
(!!OURS)
REDUCING POWER CORRECTDT/ACTIONSIOMMENTS 3
SUMMARY
REASON METIIOD A: EQUIPMENT FAILURE (EXPIAIN) 1: MANUAL D: MAINT.ORTEST 2: MANUALSCRAM C: REFUEllNG 3: AITTOMATICSCRAM
& REOULATORYRESTRICTION
- 4: OTIIER(EXPLAIN)
E: OPERA 1DRTRAINING AhV LICENSE EXAMINA110N F: ADMINISTRATION -
0: OPERATIONALERROR(EXPIAIN)
II: OTIIER(EXTIAIN) '