Monthly Operating Rept for Mar 1993 for Callaway Plant Unit 1
ML20035E737
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/31/1993
From: Campbell W, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2791, NUDOCS 9304190170
Download: ML20035E737 (6)


Text

_

- mo, Etscriac h

April 8,1993 j

Callaway Plant Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 UL.NRC-2 7 9 l'

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANTUNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MARCH.1993 L

The enclosed Monthly Operating Report for March,1993 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

l

/

/

W. R. CampbcIl

.,ps p

Manager, Callaway Plant 4/

WRC/DEY/J M/ TAM /J M/cre Enclosure cc: Distribution attached L

Y 9304190170 930331 PDR ADOCK 05000483 R

PDR

/ b 'i t;.

Maky A#est P.O. Box 62Q Fulton, MO 65251_.

I

}

cc distribution for ULNRC-2791 i

with enclosures Mr.1. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commi sion Region III i

799 Roosevelt Road i

GlenEllyn,IL 60137 Mr. L. R. Wharton (2 copies)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

(

l White Flint, North, Mail Stop 13E21 I155 Rockville,MD 20852 NRC R:sident inspector i

Manager, Electric Department Missouri Public Service Commission I

P.O. Box 360 Jefferson City,MO 65102

?

f i

a J

1 I

4 t

. +

DOCKET NO.

50-483 i

UNIT NAME CALLAWAY UNIT 1 l

' DATE 4-08-93 COMPLETED BY J. B. McInvale TELEPilONE 314/676-8247 PART A OPERATIONS SUhtMARY The p an: operated at approximately 100% power for the entire month with the following execption:

On 3-19-93 load was reduced to 93% to perform main turbine controh21ve testing. Full power operation resumed on 3-20-93.

j PART B PORV AND SAFETY VALVE

SUMMARY

[

9 None d

[

+

- -=

l r

PART C AVERAGE DAILY UNIT POWER LEVEL' DOCKET NO 50-483

.l UNIT Callaway Unit 1 DATE 4-08-93 COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 MONTH: MARCH 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1 1170 17 1178 r

2 1171 18 1174 1

3 1174 19 1170 4

1175 20 1157 5

1175 21 1169 6

1174 21 1165 7

1174-23 1171 8

1175 24 1173 i

9 1176 25 1168 10 1175 26 1166 11 1176 27 1165 12 1177 28 1161 13 1179 29 1156 j

14 1176 30 1151 15 1168 31 1167 16 1169 i

l l

l a

. i, I

I t

PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 4-08-93

'(

COMPLETED BY L B. McInvale l

TELEPHONE 314/676-8247

'5 OPERATING STA7US

i (YTD)

(CUM)

.j 1.

RFJORTING PERIOD: MARCil 1993 GROSS IlOURS IN REPORTING PERIOD:

744 2160 72,565.5 1

2 CURRENTLY AUTIIORIZED POWER LEVEL (MWt): 3565 MAX DEPEND. CAPACITY (MWe-Net): 1120 l

DESIGNELECTRICALRATING(MWe-Net)* 1171 l

3.

POWER LEVEL TO W111CII RESTRICTED (IF AhT)(MWe-Net):

i 4.

REASONS FOR RESTRICTION (IF ANY).

j THIS MONTII YR TO DATE CUMULATITI 5.

NUMBER OF llOURS REAC1DR WAS CRITICAL 744.0 2,160.0 63,537.7 l

i 6.

REACTUR RESERVE SIIUTDOWN llOURS 0

0 0

?

' LOURS GENERATOR ON LINE 744.0 2,160.0 62,215.7 7.

i 8.

' UNIT RESERVE SIIUTDOWN llOURS 0

0 0

9.

GROSS TIIERMAL ENERGY GENERATED (MWil).

2.625.029 7,610.211 208,690,161 l

10.

GROSS ELFCFRICAL ENERGY GENERATED (MWII).

910,746 2,642,274 71,204,170 b

11.

NET ELECTRICAL ENERGY GENERATED (MWII) 870,612 2,525,239 67,699,337 i

12.

REACTOR SERVICE FACTCR.-

100.0

. 100.0 87.6 13.

REACTOR AVAILABIUTY FACTOR -

100.0 100.0 87.6 j

i 14.

UNIT SERVICE TACWR -

100.0 100.0 85.7 i

15.

UNIT AVAILADILITY FACTOR 100.0

'100.0 85.7

' 6.

UNITCAPACITY FACTOR (Ihing MDC) 104.5 104.4 83.3 17.

UNIT CAPACITY I' ACTOR (Using Design MWe).

99.9 99.8 79.7 0.0

- 0.0 2.8 18 UNIT FORCED OUTAGE RATE 19.

SliUTDOWNS SCIIEDULED OVER NENT 6 MONTIIS (TYPE, DATE AND DURADON OF EACll):

20.

IF SIIUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

)

1 l

q i

l i

e q

4

'r

'a PART E tJNIT SillTfDOWNS AND PO%TR REDLETIONS DOCKET NO.

50-483 UNTINAME CALIAWAY UNTT I DATE 448-93 CUMPLETED BY 1 B. McInvale TELEPIIONE 314'676-8247 REPORT MONTil: MARCil 1993 METilOD OF TYPE SIRTITING DOWN F: FORCED DURATION Tile REACIUR OR NO.

-DATE S; SCIIEDULED

(!!OURS)

REDUCING POWER CORRECTDT/ACTIONSIOMMENTS 3

SUMMARY

REASON METIIOD A: EQUIPMENT FAILURE (EXPIAIN) 1: MANUAL D: MAINT.ORTEST 2: MANUALSCRAM C: REFUEllNG 3: AITTOMATICSCRAM

& REOULATORYRESTRICTION

- 4: OTIIER(EXPLAIN)

E: OPERA 1DRTRAINING AhV LICENSE EXAMINA110N F: ADMINISTRATION -

0: OPERATIONALERROR(EXPIAIN)

II: OTIIER(EXTIAIN) '