ML20035E060

From kanterella
Jump to navigation Jump to search
Forwards SSAR Markup Addressing Draft FSER Open Item 8.3.5-1 Re Dc Emergency Lighting (Class 1E Dc Power Supply) Per 930407 Telcon,To Support Accelerated Advanced BWR Review Schedule
ML20035E060
Person / Time
Site: 05200001
Issue date: 04/09/1993
From: Fox J
GENERAL ELECTRIC CO.
To: Poslusny C
Office of Nuclear Reactor Regulation
References
NUDOCS 9304140227
Download: ML20035E060 (3)


Text

.

~

I

)

A-GENuclear Energy l

  • ^

OP3fIdl ?!PC?kC ClifHDnnf 5 !J Carmt's Asvnstr. San.htve. C4 Le5125 i

April 9,1993 Docket No. SM52-001 r

i i

Chet Poslusny, Senior Project Manager l

Standardization Project Directorate '

Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation i

Subject:

Submittal Supporting Accelerated ABWR Review Schedule - DFSER Open -

l Item 83.5-1 i

Dear Chet:

r Enclosed is a SSAR markup addressing DFSER Open Item 83.5-1. This markup is a result of l

our April 7,1993 telephone call.

t t

Please provide a copy of this transmittal to Clare Goodman and Pat Eng.

r Sincerely, b

l Jack Fox l

Advanced Reactor Programs 4

l cc: Norman Fletcher (DOE)

Bob Strong (GE) 1

.l i

l nms 9304140227 930409-

{DR ADOCK 05200001 i

PDR

M 2W100AH

, Standard Plant Rev. n 2

TABLE 9.5-4 l

DC EMERGENCY LIGHTING i

( C L ASS IE QC PotJEt? SoffLY)

AREA DIVISION OF POWER Foe 1xemdfe3 - ptge lesef l

Main Control Room 7f-c Div. H, HI DC power supply Div. I essential electric 7 fi.

.Div. I DC power supply l

J;uipment room (RB) j f

Div. II essential electric 7 f-i Div. H DC power supply l

equipment room (RB) l Div. HI essential electrie 7f-4 Div. III DC power supply equipment room (RB)

Div. I diesel generator 7 f-c Div. I DC power supply area and associated control room (RB)

[

t Div. H diesel generator 7'f-c Div. II DC power supply j

area and associated i

control room (RB)

[,

l DivIU dieselgenerator 7 f-c Div.III DC power supply i

area and associated controlroom (RB) i Div. I DC electrical 7 f-c Div. I DC power supply equipment room (CB)

Div. II DC electrical 7 f-c' Div. H DC power supply equipment room (CB)

Div. HI DC electrical 7 f-c Div. IH DC power supply l

h equipment room (CB)

Div. IV DC electrical 7.f-c Div. IV DC power supply l

equipment room (CB)

Div. I Remote Shutdown 7 f-c!

Div. I DC power supply System antrol area (RB) l l

I Div. II Remote Shutdown 7.f-c Div. II DC power supply j

System control area (RB) i Radwaste control room (RB) 7, f-c Non-div. DC power supply

]

l Non Essential electrie 7.f-c Non-div. DC power supply l

equipment rooms l

7h Non-div. DC power supply CTG room Amendment 22 9.5-10.12 Working areas in front of Class 1E penets containing instruments or controis shalt gi - -

be a miniman of 10 foote:ndles measured 1 meter'(40 inches) up from the floor leve h

.