1 APR 71993 Docket No. 50-220 Mr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road Syracuse, New York 13212
Dear Mr. Sylvia:
1 i
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION In a telephone conversation on March 31,1993, Mr. R. Sanaker, General Supervisor -
Operations Training, Unit 1, and Ms. T. Walker, Sr. Operations Engineer, arranged to evaluate the requalification program at Nine Mile Point, Unit 1. The NRC will evaluate the facility licensee's requalification program based on inspection activities in accordance with NRC Inspection Manual Temporary Instruction TI-2515/117. The inspection will be performed based on facility administered examinations which are scheduled to start May 24,1993. The specific on-site inspection will be performed during the week of June 7,1993.
On February 9,1993, the NRC staff met with members of your staff, identified in Enclosure 1, at the NRC Region I office in K'ag of Prussia, PA, and discussed NRC Inspection Manual Temporary Instruction TI-2515/117. Your staff was provided a copy of revision 7 of the Examiner Standards and a copy of TI-2515/117.
In order to prepare for the inspection activities, you will need to furnish a sample plan / test outline for the examinations to be administered, as well as copies of the examinations.
Mr. Sanaker agreed to provide these materials by May 24,1993. Your staff should assure appropriate measures are taken to preclude examination compromise when subm.itting the examinations.
I 5
t 9304130023 930407 PDR ADOCK 05000220 G
PDR OFFICIAL RECORD COPY G:NM120DA.TEW b$
v
Mr. B. Ralph Sylvia 2
APR 71993 Thank you for your cooperation in this matter. If you have any questions on the evaluation process, please contact Mr. R. Conte, Chief, BWR Section, at (215) 337-5210.
Sincerely, Od;iral Sij <
!.cc M. E
~.
Ixe H. Bettenhausen, Chief Operations Branch Division of Reactor Safety
Enclosure:
List of Attendees cc w/ encl:
C. Terry, Vice President - Nuclear Engineering J. Perry, Vice President - Quality Assurance Vice President - Nuclear Generation K. Dahlberg, Unit 1 Plant Manager M. McCormick, Unit 2 Plant Manager D. Greene, Manager, Licensing R. Sanaker, General Supervisor, Operations Training (Unit 1)
J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn Director, Energy & Water Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Ikpartment ofI2w Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York, SLO Designee OFFICIAL RECORD COPY G:NM120DA.TEW
Mr. B. Ralph Sylvia 3
bec w/ encl:
Region I Docket Room (with concurrences)
L. Bettenhausen, DRS R. Conte, DRS T. Walker, DRS C. Cowgill, DRP J. Yerokun, DRP L. Nicholson, DRP S. Greenlee, DRP W. Schmidt, SRI - Nine Mile V. McCree, OEDO R. Capra, NRR D. Lange, OLB/NRR J. Menning, NRR D. Brinkman, NRR D. Holody, EO OL Facility File DRS File l
RI:DRS RI:DRS RI:DRS Walker /ajk Co
/
Bettenhausen 04 /93 04/f/93 93 l,
l OFFICIAL RECORD COPY G:NM120DA.TEW I
I
ENCLOSURE 1 LIST OF ATTENDEES Niagara Mohawk Power Corooration R. Seifried Supervisor, Operations, Unit 1 R. Sonaker General Supervisor, Operations Training, Unit 1 M. Peterson Senior Training Instructor Nuclear Reculatory Commission i
L. Bettenhausen Chief, Operations Branch, DRS R. Conte Chief, BWR Section, OB, DRS T. Walker Senior Operations Engineer, DRS D. Weaver Reactor Engineer, DRP