t GPU Nuclear Corporation
. 9 Nuclear
=;%"am.
201-316-7000 TELEX 13&482 Writer's Direct Dial Numbet April 1, 1993 C300-93-2097 C311-93-2045 C321-93-2098 I
U. S. Nuclear Regulatory Commission Att:
Document Control Desk L
Washington, DC 20555
Dear Sir:
l
Subject:
Oyster Creek Nuclear Generation Station (OCNGS) i DPR-16/ Docket No. 50-219 Three Mile Island Unit 1 (THI-1)
DPR-50/ Docket No. 50-289 i
NUREG CR-5975 NUREG CR-5975, " Incentive Regulation of Investor-Owned Nuclear Power Plants by Public Utility Regulators," published in January 1993, contains several-inaccuracies.
In particular, Table 2.16, which displays data for Jersey Central Power and Light, includes incorrect data in the columns for Capacity Factor and I.v. ntive Values.
The table below shows the appropriate numbers.
Corrections are in bold type.
Period Caoacity Factor Incentive Values -
March 1987-Feb. 1988 69.4%
0 March 1988-Feb. 1989 54.1%
-54,300,000 March 1989-Feb. 1990 61.7%
0 March 1990-Feb. 1991 82.2%
+S2,700,000 March 1991-Feb.-1992 64.0%
-5500,000
-In addition, the description of the reward calculation in paragraph 2 on page 2.27 is incorrect.
In New Jersey, a utility is allowed to recover all of its replacement power costs as long as the capacity is in the deadband range or above.
If the capacity falls into the reward range, a utility can also recover a percentage of the avoided replacement power costs. (cost savings),
calculated from the edge of the desdband, not "120% of replacement power costs." Similarly, Table 2.14 refers to cost recovery as 120%, 125% or 130%
of replacement power costs. This also is incorrect.
9304050291 930401 PDR ADOCK 05000219 l (w P
PDR GPU Nuclear Corporation is a subsid:ary of General Pubhc Utikt:es Corporation
jL.
G300-93-2097 C311 93-2045 i
r
'C321-93-2098 Page 2 GPU Huclear suggests that the preparers of HUREG CR-5975 contact Michael W.
Laggart, Manager Corporate Nuclear Licensing (201) 316-7968 prior to publishing the subsequent report to ensure that the values ascribed to Jersey i
Central Power and Light are accurate.
Sincerely, 7
c J. C. Fornicola Licensing and Regulatory Affairs Director JCF\\DK\\plp cc: Administrator, Region 1 Oyster Creek NRC Resident Inspector Oyster Creek NRC Project Manager THI-1 NRC Resident Inspector TMI-1 NRC Project Manager T. Gould - NJ Board of Regulatory Commissions I
?
,