Provides Listing of Testing Described in Chapter 14 of FSAR Which Was Conducted During Mode 6 Through Mode 2 Since Issuance of CPSES Unit 2 Low Power Operating License
ML20035B144
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/28/1993
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-93158, NUDOCS 9303310209
Download: ML20035B144 (3)


Text

_-

r.e i

Log # TXX-93158 File # 10010 3_

~

Ref. # 10CFR.50.57' 7UELECTR/C March 28, 1993 William J. Cahill, Jr.

Genup Vur he.ddent U. S. Nuclear Regulatory Commission i

Attn: Document Control Desk Washington, DC 20555 I

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 2 DOCKET NO. 50-446 READINESS FOR ISSUANCE OF THE UNIT 2 i

FULL POWER OPERATING LICENSING REF:

1)

TU Electric letter logged TXX-93093 i

from William J. Cahill, Jr. to the NRC dated February 19, 1993 i

2)

TU Electric letter logged TXX-93011 from William J. Cahill. Jr. to the NRC dated January 8, 1993 3)

TU Electric letter logged TXX-93051 from William J. Cahill, Jr. to the NRC dated January 25, 1993 4)

TV Electric letter logged TXX-93140 from William J. Cahill, Jr. to the NRC dated March 22, 1993 Gentlemen:

1 TU Electric has completed and evaluated the low power physics testing and the additional testing that can be completed prior to proceeding above 5% reactor power. provides a listing of the testing that is described in Chapter 14 of the Final Safety Analysis Report (FSAR) which was conducted during Mode 6 through Mode 2 since the issuance of the CPSES Unit 2 low power operating license.

Additionally, TU Llectric has performed a self-assessment of the readiness of CPSES Unit 2 for proceeding above 5% power in accordance with the description provided in Reference 1.

This self-assessment has been reviewed and evaluated by the Station Operations Review Committee (50RC). The 50RC has concluded that CPSES Unit 2 is ready for operation above 5% power.

0 Cb1A111 I

9303310209 930328 PDR ADOCK 05000446 4(0 h. Ouve street LII El D.dlas, Tcxas 75201 I

r m

  • s TXX-93158 Page 2 of 2 TU Electric is at this time ready to receive an operating license for_CPSES Unit 2 which authorizes operation up to 100% reactor power.

Sincerely, f

a.

William J. Cahill, Jr.

Enclosure c - Mr. J. L. Milhoan, Region IV Resident Inspectors, CPSES (2)

Mr. T. A. Bergman, NRR Mr. B. E. Holian, NRR v

Mr. L. A. Yandell, Region IV i

1 l

I

.?

i l

a, Enclosure to TXX-93158 Page 1_of 1 1

A.

Deferred Preoperational Tests and Retests conducted during Mode 6 l

through Mode 2.

(Reference 2 Reference 3, and Reference 4).

l 1.

Prec urizer Spray Valve Leak Tightness 2.

Power Operated Relief Valve (PORV) Leak Tightness 3.

Reactor Cavity Humidity Detectors 4.

Steam Dump Valve Stroke Verification 5.

Public Address and Emergency Evacuation Alarm System 6.

Main Stream Isolation Valve (MSIV) Stroke Timing 7.

Plant Computer Flux Mapping Module 8.

Plant Computer Data Archive Capability 9.

Plant Computer Delta I Module 10.

Heat Ventilating and Air Conditioning (HVAC) System Flow Balance Test results for the tests listed above have been evaluated by the Test Review Group as acceptable for proceeding to full power.

B.

Initial Startup Tests conducted during Mode 6 through Mode 2 (Reference FSAR Chapter 14, Table 14.2-3 and Figure 14.2-4B).

1.

Reactor Trip System 2.

Boron Reactivity Worths 3.

Rod Drop Tests

  • 4.

Reactor Coolant Flow Test 5.

Reactor Coolant Flow Coastdown

  • 6.

Control Rod Drive Tests 7.

Rod Position Indicators 8.

Moderator. Temperature Reactivity Coefficient 9.

Control Rods Reactivity Worths 10.

Auxiliary Startup Instrumentation

  • 11.

Chemical Tests

  • 12.

Core Performance Evaluations

  • 13.

Calibration of Nuclear Instrumentation

  • 14.

Radiation Survey

  • 15.

Core Reactivity Balance

  • 16.

Incore Nuclear Instrumentation 17.

Reactor Coolant Leak Test 18.

Rod Control System Test Test results for the testing listed above have been evaluated by the Test Review Group as acceptable to proceed above 5% power.