" arch 25, 1993 1
Docket Nos. 50-334 l
and 50-412 i
Mr. J. D. Sieber, Senior Vice President and Chief Nuclear Officer I
Huclear Power Division
)
Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077-0004 l
Dear Mr. Sieber:
l i
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION RELATED TO CHANGE REQUESTS 199 AND 66 (TAC NOS. M84223 and M84224) j On September IS,1992, Du:;uccnc Light Ccmpcny (DLC) submitted an application to amend the Appendix A Technical Specifications (TS) for Beaver Valley Power i
Station, Unit I and Unit 2.
The proposed application would revise the TS which address containment air locks (Section 3/4.6.1.3). Our review of this 1
application is underway, but for us to complete our review we require additional information.
(
1 The required additional information is described in the enclosure. DLC is requested to provide a response within 45 days of receipt of this letter so
(
that the staff can continue its review.
The requirements of this letter affect fewer than 10 respondents, and, l
[
thereferc, are not subject to the Office of Management and Budget review under l
PL 96-511.
t Sincerely, l
l
/S/
Gordon E. Edison, Senior Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation j
Enclosure:
Request for Additional Information L
l
- ggp g; 7 r,
-~ -
cc w/ enclosure:
2,w :: au See next page DJSTRIBUTION:
Docket File JCalvo OGC RWoodruff l
~
NRC & Local PDRs WButler ACRS (10) 1 PDI-3 Reading TClark JLinville,RI SVarga ilEdisonh RLobel 0FFICE LA:PDI-3 PM:PDI-3h D:PDI-3 t k f
a m-v
- E 'u 4CTark GEdison:mw WButler N'
+
4 3 /Jh93 3 /d/93
[/ //jP/93
/ /
A/
DME OFFICIAL RECORD COPY FILENAME:
BVM84223.RAI
- - e a q r-
'O 0
9303290319 930524 t
i 4
3 PDR ADDCK 0500g34
[
t' a
((gemeGoh
=
UNITED STATES NUCLEAR REGULATORY COMMISSION
,E W ASm NGTON. O. C. 20555 N.....f "erch 20 1993 4
Docket Nos. 50-334 and 50-412 Mr. J. D. Sieber, Senior Vice President and Chief Nuclear Officer Nuclear Power Division Duquesne Light Company Post Office Box 4 j
Shippingport, Pennsylvania 15077-0004 Daar Mr. Sieber:
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION RELATED TO CHANGE REQUESTS 199 AND 66 i
(TAC N05. M84223 and M84224)
On September 16, 1992, Duquesne Light Company (DLC) submitted an application to amend the Appendix A Technical Specifications (TS) for Beaver Valley Power
]
Station, Unit I and Unit 2.
The proposed application would revise the TS j
which address containment air locks (Section 3/4.6.1.3). Our review of this application is underway, but for us to complete our review we require additional information.
1 The required additional information is described in the enclosure. DLC is requested to provide a response within 45 days of receipt of this letter so that the staff can continue its review.
l The requirements of this letter affect fewer than 10 respondents, and, i
therefore, re r.ot subject to Uie Office of nanagement and Budget review under PL 96-511.
Sincerely, a
f Gordon E. Edison, Senior Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
4 Request for Additional l
Information cc w/enr.losure:
}
See next page i
i
^
i i
~
Mr. J. D. Sieber Beaver Valley Power Station
-l l
Duquesne Light Company.
Units 1 & 2 i
cc:
]
Jay E. Silberg, Esquire Bureau of Radiation Protection
[
j Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW.
Environmental Resources i
Washington, DC 20037 ATTN:
R. Barkanic Post Office Box 2063
)
Nelson Tonet, Manager Harrisburg, Pennsylvania.17120 l
Nuclear Safety i
Duquesne Light Company Mayor of the Borrough of l
j Post Office Box 4 Shippingport j
i Shippingport, Pennsylvania 15077 Post Office Box 3 i
Shippingport, Pennsylvania 15077 Commissioner Roy M. Smith j
West Virginia Department of Labor Regional Administrator, Region I l
Building 3, Room 319 U.S. Nuclear Regulatory Commission j
Capitol Complex 475 Allendale Road Charleston, West Virginia 25305 King of Prussia, Pennsylvania 19406 i
}
John D. Borrows Resident Inspector
- 1 Director, Utilities Department U.S. Nuclear Regulatory Commission j
Public Utilities Commission Post Office Box 181 l
180 East Broad Street Shippingport, Pennsylvania 15077 l
l Columbus, Ohio 43266-0573 l
j Director, Pennsylvania Emergency
[
j Management Agency l
Post Office Box 3321
)
Harrisburg, Pennsylvania 17105-3321 i
I Ohio EPA-DERR ATTN: Zack A. Clayton I
Post Office Box 1049 l
Columbus, Ohio 43266-0149 I
i t
f l
4 i
i d
t
)
i
s Enclosure
.l 4
\\
4
~
RE0 VEST FOR ADDITIONAL INFORMATION 1
?
I b
Certain aspects of the standard technical specifications for Westinghouse-designed reactors appear not to be addressed in the September 16, 1992 proposal.
Please address the following:
l l
1.
In LCOs 3.6.1.3.a.1 and 3.6.1.3.b, verification within I hour that an operable door is closed.
l l
2.
Ir. LC0 3.6.1.3.a.1, limitation of entry and exit to 7 days when both air locks are inoperable.
3.
In LCO 3.6.1.3.b, iritiation of action to evaluate overall containment leakano,nor t he a n,n rn,n ri a t a lrn, and 4.
In LC0 3.6.1.3.b, reference to inoperable interlock mechanism.
i 5.
Any change in Bases needed to be consistent with changes proposed for Section 3/4.6.1.3.