Confirms 930713-0813 Svc Water Sys Operational Performance Insp Rept 50-298/93-15 Revised to Accommodate Other Site Activities
ML20035A345
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/17/1993
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 9303250178
Download: ML20035A345 (5)


See also: IR 05000298/1993015

Text

_

-

UNITED STATES

gAOh

a f

g.

NUCLEAR REGULATORY COMMISSION

'

9[

j

REGION IV

~[

611 RYAN PLAZA DRIVE, SulTE 400

-ej<,

d'

ARLlNGTON, TEXAS 760114064

. MAR l'T e93

Docket:

50-298

[.

License: DPR-46

f-

Nebraska Public Power District

.

' ATTN: Guy R. Horn, Nuclear Power

Group Manager

-

i

P.O. Box 499

i

Columbus, Nebraska 68602-0499

,

L.

'

SUBJECT: SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE NRC INSPECTION

REPORT 50 4 82/93-15

i

'

.2']B

!

We are planning to conduct a Service Water System Operational Performance

Inspection (SWSOPI) at your Cooper Nuclear Station during the period July 13

through Au9_st 13, 1993. The inspection schedule was revised from that

presented in our December 17, 1993, letter to accommodate other site

-

activities. This revised schedule was discussed with Mr. G. Smith of your

,

staff on January 25, 1993.

i

The inspection will be conducted in accordance with Temporary Instruction

2515/118, " Service Water System Operational Performance -Inspections (SWSOPI)."

"

The team leader and principal contact for this inspection effort is Mr. Philip

Wagner. The inspection team will consist of the team leader, three

inspectors, and a mechanical design consultant.

j

In order to implement an efficient inspection, the team would like to conduct

a short entrance meeting with those involved members of your staff at 1 p.m.

on July 13, 1993. At the conclusion of the entrance meeting, the team'would

,

appreciate a short (one hour) presentation on the design, operation, and

history of the service water system. The team will spend the remainder of the

,

first week in meetings with members of your staff to identify documentation

>

needs and in completing the necessary training to support unescorted access to

the facility for NRC personnel. The team leader will request an escort for

i

the consultant as necessary.

-

' Attached to this letter is a list of materials that the team will require for

i

the inspection. We request that the materials be made availabie for the taam

!

on July 13, 1993.

i

r

,

f

7

9303250178g30

PDR

ADOCK

PDR

n

G'

U

u

L

4

-.

.

.

, . . - _

,

e

.f

'l

.

-

Nebraska Public Power

-2-

District

!

'

Should you have any questions on the inspection.or the requested material,

please contact Mr. Wagner at (817) 860-8127.

i

Sinc rely,

l

gb

.

rthur T. Howe , Acting Di ector,

i

Division of Re ctor Safety

Attachment: As stated

cc w/ Attachment-

I

Nebraska Public Power District

~

ATTN:

G. D. Watson, General Counsel

P.O. Box 499

Columbus, Nebraska 68602-0499

Cooper Nuclear Station

ATTN: John M. Meacham, Site Manager

i

!

P.O. Box 98

Brownville, Nebraska 68321

,

Nebraska Department of Environmental

Control

ATTN:

Randolph Wood, Director

P.O. Box 98922

,

Lincoln, Nebraska 68509-8922

Nemaha County Board of Commissioners

ATTN: Richard Moody, Chairman

Nemaha County Courthouse

1824 N Street

i

Auburn, Nebraska 68305

Nebraska Department of Health

ATIN: Harold Borchert, Director

Division of Radiological Health

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509-5007

Kansas Radiation Control Program Director

J

m.

. . _ . _

.

.

_

_

.

.

. _ _

I

~

,

i

!

!

.; Nebraska Public Power

-3-

!

District

l

1

J6'l

bcc to DMB IE01

NRC Inspection Report 50-392/93-15

l

t

bec distrib. by RIV.

,

J. L. Milhoan

Resident Inspector

!

DRP

Section Chief (DRP/C)

i

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

Section Chief (DRP/TSS)

l

Project Engineer (DRP/C)

RIV File

j

DRS

P. Wagner

j

P. Goldberg

C. Paulk

j

T. Westerman

S. McCrory

C. McCracken, NRR, MS: 8D1

G. Imbro, NRR, MS: 9Al

'

Senior Resident Inspector - River Bend

Senior Resident Inspector - Fort Calhoun

!

i

!

!

!

!

.

!

!

l

I

.

I

!

1

i

!

!

i

l

'

RIV:TL:DRMO DD:DRS n[

Df)RP

D:DRhh,/

PCWagner:cs

ATHowell

MJ3st li

SJCoffi5k

l

3 /is/93

l3 / )[r/93

% /th /93

_'b /0 /93

-

,

!

"

l

i

l

-

. ~

. . .

. - , . _ - -

m . - . . - - - - -

. . - - - .

- ._-

-.

-

-

- -

_.

__ _

cs

7

,

_

r

.

I

t'

'

!

r

Nebraska Public Power

-3-

l

District

l

'

!

J'78

!

bec to DMB IE01-

NRC Inspection Report 50-382/93-15

l

i

bcc distrib, by RIV:

!

J. L. Milhoan

Resident Inspector

i

DRP

Section Chief (DRP/C)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

!

DRSS-FIPS

Section Chief (DRP/TSS)

i

Project Engineer (DRP/C)

RIV File

!

DRS

P. Wagner

a

P. Goldberg

C. Paulk

i

T. Westerman

S. McCrory

e

C. McCracken, NRR, MS: 8D1

G. Imbro, NRR, MS: 9Al

i

Senior Resident Inspector - River Bend

I

Senior Resident Inspector - Fort Calhoun

!

!

'

l

'

!

l

<

l

l

l

,

!

I

!

!

!

!

!

RIV:TL:DRS')jd DD:DRSn[

D/')RP

D:DRS[,j

PCWagner:cs

ATHowefl

AB5st ah

SJColii)(

3 /is/93

[3/K,:/93

% /tG/93

<b/0/93

i

. - . .

.

_

. . _ - . . - _

. .

i

_

_

._

_ _ _ _

. _ . -

.

.

_ . . _ . . _

..

. _ _ .

.

f

.

f

ATTACHMENT

LIST OF MATERIALS TO SUPPORT THE SWSOPI

,

.

i

1.

Service Water System (SWS) descriptions and associated P&lDs;

2.

Design basis and other design documents (procurement specifications for

pumps, valves, heat exchangers, etc.; thermal ard hydraulic calculations

and analyses);

3.

Pump curves and test results data;

l

4.

Flow and heat transfer test results data;

5.

Licensing basis, Technical Specifications, and commitments;

,

6.

Water hammer and surge pressure protection information and analyses;

7.

Descriptions of all inodification to the SWS;

,

8.

Documentation relevant to the analyses, testing, procedure changes, and

inspections of the SWS credited for satisfying the actions requested by

Generic Letter 89-13;

9.

Normal, off-normal, and emergency operating procedures;

10.

Maintenance and surveillance (including ISI and IST) procedures;

y

11.

Vendor manuals for involved equipment;

4

12.

Maintenance histories of major SWS components, the status of maintenance

and surveillance that were overdue, and a listing of all such activities

that are scheduled to be conducted during the inspection period;

i

i

13.

Descriptions of the programs for the control of biofouling, silting, and

corrosion, including the involved implementing procedures;

'

)

14.

A copy of the completed preoperational testing program results and

copies of any subsequently completed system tests not included in the

above requests; and

15.

Description of the scope, findings, and conclusions of any service water

system self-assessment activity.