_
-
UNITED STATES
gAOh
a f
g.
NUCLEAR REGULATORY COMMISSION
'
9[
j
REGION IV
~[
611 RYAN PLAZA DRIVE, SulTE 400
-ej<,
d'
ARLlNGTON, TEXAS 760114064
. MAR l'T e93
Docket:
50-298
[.
License: DPR-46
f-
Nebraska Public Power District
.
' ATTN: Guy R. Horn, Nuclear Power
Group Manager
-
i
P.O. Box 499
i
Columbus, Nebraska 68602-0499
,
L.
'
SUBJECT: SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE NRC INSPECTION
REPORT 50 4 82/93-15
i
'
.2']B
!
We are planning to conduct a Service Water System Operational Performance
Inspection (SWSOPI) at your Cooper Nuclear Station during the period July 13
through Au9_st 13, 1993. The inspection schedule was revised from that
presented in our December 17, 1993, letter to accommodate other site
-
activities. This revised schedule was discussed with Mr. G. Smith of your
,
staff on January 25, 1993.
i
The inspection will be conducted in accordance with Temporary Instruction
2515/118, " Service Water System Operational Performance -Inspections (SWSOPI)."
"
The team leader and principal contact for this inspection effort is Mr. Philip
Wagner. The inspection team will consist of the team leader, three
inspectors, and a mechanical design consultant.
j
In order to implement an efficient inspection, the team would like to conduct
a short entrance meeting with those involved members of your staff at 1 p.m.
on July 13, 1993. At the conclusion of the entrance meeting, the team'would
,
appreciate a short (one hour) presentation on the design, operation, and
history of the service water system. The team will spend the remainder of the
,
first week in meetings with members of your staff to identify documentation
>
needs and in completing the necessary training to support unescorted access to
the facility for NRC personnel. The team leader will request an escort for
i
the consultant as necessary.
-
' Attached to this letter is a list of materials that the team will require for
i
the inspection. We request that the materials be made availabie for the taam
!
on July 13, 1993.
i
r
,
f
7
9303250178g30
ADOCK
n
G'
U
u
L
4
-.
.
.
, . . - _
,
e
.f
'l
.
-
- Nebraska Public Power
-2-
District
!
'
Should you have any questions on the inspection.or the requested material,
please contact Mr. Wagner at (817) 860-8127.
i
Sinc rely,
l
gb
.
rthur T. Howe , Acting Di ector,
i
Division of Re ctor Safety
Attachment: As stated
cc w/ Attachment-
I
Nebraska Public Power District
~
ATTN:
G. D. Watson, General Counsel
P.O. Box 499
Columbus, Nebraska 68602-0499
Cooper Nuclear Station
ATTN: John M. Meacham, Site Manager
i
!
P.O. Box 98
Brownville, Nebraska 68321
,
Nebraska Department of Environmental
Control
ATTN:
Randolph Wood, Director
P.O. Box 98922
,
Lincoln, Nebraska 68509-8922
Nemaha County Board of Commissioners
ATTN: Richard Moody, Chairman
Nemaha County Courthouse
1824 N Street
i
Auburn, Nebraska 68305
Nebraska Department of Health
ATIN: Harold Borchert, Director
Division of Radiological Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
Kansas Radiation Control Program Director
J
m.
. . _ . _
.
.
_
_
.
.
. _ _
I
~
,
i
!
!
.; Nebraska Public Power
-3-
!
District
l
1
J6'l
bcc to DMB IE01
NRC Inspection Report 50-392/93-15
l
t
bec distrib. by RIV.
,
J. L. Milhoan
Resident Inspector
!
Section Chief (DRP/C)
i
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
Section Chief (DRP/TSS)
l
Project Engineer (DRP/C)
RIV File
j
P. Wagner
j
P. Goldberg
C. Paulk
j
T. Westerman
S. McCrory
C. McCracken, NRR, MS: 8D1
G. Imbro, NRR, MS: 9Al
'
Senior Resident Inspector - River Bend
Senior Resident Inspector - Fort Calhoun
!
i
!
!
!
!
.
!
!
l
I
.
I
!
1
i
!
!
i
l
'
RIV:TL:DRMO DD:DRS n[
Df)RP
D:DRhh,/
PCWagner:cs
ATHowell
MJ3st li
SJCoffi5k
l
3 /is/93
l3 / )[r/93
% /th /93
_'b /0 /93
-
,
!
"
l
i
l
-
. ~
. . .
. - , . _ - -
m . - . . - - - - -
. . - - - .
- ._-
-.
-
-
- -
_.
__ _
cs
7
,
_
r
.
I
t'
'
!
r
Nebraska Public Power
-3-
l
District
l
'
!
J'78
!
bec to DMB IE01-
NRC Inspection Report 50-382/93-15
l
i
bcc distrib, by RIV:
!
J. L. Milhoan
Resident Inspector
i
Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
!
DRSS-FIPS
Section Chief (DRP/TSS)
i
Project Engineer (DRP/C)
RIV File
!
P. Wagner
a
P. Goldberg
C. Paulk
i
T. Westerman
S. McCrory
e
C. McCracken, NRR, MS: 8D1
G. Imbro, NRR, MS: 9Al
i
Senior Resident Inspector - River Bend
I
Senior Resident Inspector - Fort Calhoun
!
!
'
l
'
!
l
<
l
l
l
,
!
I
!
!
!
!
!
RIV:TL:DRS')jd DD:DRSn[
D/')RP
D:DRS[,j
PCWagner:cs
ATHowefl
AB5st ah
SJColii)(
3 /is/93
[3/K,:/93
% /tG/93
<b/0/93
i
. - . .
.
_
. . _ - . . - _
. .
i
_
_
._
_ _ _ _
. _ . -
.
.
_ . . _ . . _
..
. _ _ .
.
f
.
f
ATTACHMENT
LIST OF MATERIALS TO SUPPORT THE SWSOPI
,
.
i
1.
Service Water System (SWS) descriptions and associated P&lDs;
2.
Design basis and other design documents (procurement specifications for
pumps, valves, heat exchangers, etc.; thermal ard hydraulic calculations
and analyses);
3.
Pump curves and test results data;
l
4.
Flow and heat transfer test results data;
5.
Licensing basis, Technical Specifications, and commitments;
,
6.
Water hammer and surge pressure protection information and analyses;
7.
Descriptions of all inodification to the SWS;
,
8.
Documentation relevant to the analyses, testing, procedure changes, and
inspections of the SWS credited for satisfying the actions requested by
9.
Normal, off-normal, and emergency operating procedures;
10.
Maintenance and surveillance (including ISI and IST) procedures;
y
11.
Vendor manuals for involved equipment;
4
12.
Maintenance histories of major SWS components, the status of maintenance
and surveillance that were overdue, and a listing of all such activities
that are scheduled to be conducted during the inspection period;
i
i
13.
Descriptions of the programs for the control of biofouling, silting, and
corrosion, including the involved implementing procedures;
'
)
14.
A copy of the completed preoperational testing program results and
copies of any subsequently completed system tests not included in the
above requests; and
15.
Description of the scope, findings, and conclusions of any service water
system self-assessment activity.
9