Addendum to TS Change Request 162 to Licenses DPR-24 & DPR-27,adding Wording in Proposed Spec 15.3.1.A.3.a.(4)(a) Re 8 H Period for Components Required for Redundant DHR Capability,Inadvertently Omitted from 930226 Amend Request
ML20034H742
Person / Time
Site: Point Beach  
Issue date: 03/09/1993
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034H743 List:
References
CON-NRC-93-037, CON-NRC-93-37 VPNPD-93-062, VPNPD-93-62, NUDOCS 9303220005
Download: ML20034H742 (1)


Text

F Wisconsin 1 Electnc POWER COMPANY 231 At Mcngan. PO Ban 204h M,Woukee3A 53201-2046 1414)2202345 VPNPD 062 NRC 037 March 9, 1993 Document Contro', Desk U.

S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 ADDENDUM TO TECHNICAL SPECIFICATION CHANGE REOUEST 162, MODIFICATIONS TO TECHNICAL SPECIFICATIONS SECTION 15.1.3.A.3,

" COMPONENTS REOUIRED FOR REDUNDANT DECAY HEAT REMOVAL CAPABILITY" POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 On February 26, 1993, we submitted the subject Technical Specification Change Request.

During review of our submittal, we discovered that the phrase "in an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period" had been inadvertently omitted from proposed Specification

15. 3.1. A. 3. a. (4 ) (a).

The proposed wording should read:

(a)

"All reactor coolant pumps and residual heat removal pumps may be deenergized for up ta 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:"

To resolve this discrepancy, we are forwarding revised Technical Specification page 15.3.1-2 along with the remainder of the pages previously submitted.

Please replace the Technical Specification pages included with our February 26, 1993, submittal with the attached pages.

Please note that our February 26, 1993, transmittal letter, safety evaluation, and no significant hazards consideration are consistent with the above wording.

We apologize for any inconvenience this may have caused.

Sincerely, Subscribed and sworn to pefore me this 94's day of 77he d,

, 1993.

N r

c ob Link btwffy f1g&[

\\

Nuclear Power 170056 Notpry/sPublic, state of wisconsin d

I Vice President W ""M" W"

"W 9 6 9303220005 ADOCKoho Enclosures DR p

cc:

NRC Resident Inspector NRC Regional Administrator Public Service Commission of WI Asubsdan ofHionsinDryGepanw au-

xNx x

0%RATlqff FOR ON System.

System MrT NG C ND SYSTEM Coolant Coolant COOLANT 15.3 REACTOR of the Reactorof the Reactor

. J5.3.1-abil'ty operating status operation 1

for ions operation.

Applies to the limiting condit reactor safe e

Ohie.Cliy_t thos ensure least on e

specify met for tests, at3.5% of rated to To be ust n

are in peratio.immediate which m t

critical, excep S ecificati n OMPON.N be in peration. maintain d above o

o e

ONA rating, trative RAT Pumps

  • coolant pumps ll actor is ope administhan 3.5% of When the coolant pump shashall n ot be OP olant ases re A.

Co actor actor pounless both reaccoolant pump cei tor 1

wer wer is f rated o

a.

re oparating and pless Re actorshall reduce po be (1) power re If eitherreduction ssary cease to coolant pumpsower, butce immedia nece (2) hour lant power control as one coo e

both reactor % of rated pwill commenopened st on reactor lea wer.

rated po average 5

shutdownbreakers greater than 3 are If d the for o ided:

of (3) wer, reactorreactor trips bcritical an 350*F, except ause diluticn v

operation.be deenerg po u

that would c reactor isis greater thanbe in the ll may con least temperaturecoolant pump shacoolant pumpsare per When the maintained atval systes boron coolant system s

b.

actorBoth reactoroperations temperattsre israture, and con-re are pen. heat remothe boron No reactor (1) o breakers residualmade in o tlet a.

the saturation tempereactor tripcoolant u

. Core is

.b.

c.

Thereactor when coolant.

ret a

tt onein perationreactor verage o

a

~ of the whenever the operable Capability

  • be shall ve 350*F.

Removal thar

'or abo Heat350*F and gre is d

Decay Nndant ure:less thancay heat am ger

te m 9-pumpassociated s icp A, its

. coolant-

.B. its

,olant. pump reactor are in the les

  • :Q 9

s30266 E