i OPERATING DATA REPORT REVISED DATA UNIT NAME Millstone Unit 2 DATE 2/02/93 COMPLETED BY S. Doboe TELEPHONE (203) 447-1791 EXT 4678 i

OPERATING STATUS 1.

Docket Number:

50-336 Notes: Items 22 and 23-2.

Reporting Period:

January 1993 cumulative are weighted 3.

Utility

Contact:

S. Doboe averages. Unit operated l

4.

Licensed Thermal Power (MWt):

~2700 at 2560 MWTH prior to its 5.

Nameplate Rating (Gross MWe):

909 uprating to the current 6.

Design Electrical Rating (Net MWe):

870 2700 MWTH power level.

7.

Maximum Dependable Capacity (Gross MWe):

903.10 8.

Maximum Dependable Capacity (Net MWe):

873.10 9.

If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:

N/A

10. Power Level To Which Restricted, If any (Net MWe):

N/A

11. Reasons For Restrictions, If Any:

N/A This Month Yr.-To-Date Cumulative

12. Hours In Reporting Period 744.0 744.0 149928.0
13. Number Of Hours Reactor Was Critical 519.5 519.5 105777.1
14. Reactor Reserve Shutdown Hours 0.0 0.0 2205.5
15. Hours Generator On-Line 434.0 434.0 100791.4
16. Unit Reserve Shutdown Hours 0.0 0.0 468.21
17. Cross Thermal Energy Generated (MWH)
  • 968933.0
  • 968933.0
  • 276997615.4
18. Gross Electrical Energy Generated (MWH) 316494.0 316494.0 84720801.5
19. Net Electrical Energy Generated (MWH) 298274.0 298274.0' 81249161.3
20. Unit Service Factor 58.3 58.3

-67.2

21. Unit Availability Factor 58.3 58.3 67.5 22.' Unit Capacity Factor (Using MDC Net) 45.9 45.9 63.5
23. Unit Capacity Factor (Using DER Net) 46.1 46.1 62.4
24. Unit Forced Outage Rate 0.0 0.0 15.4
25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A i
26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

N/A 27.

Units In Test Status (Prior to Commercial Operation):

l Forecast Achieved 4

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

  • REVISED DATA VALUES DUE TO CALCULATIONAL ERROR