ML20034H598

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1993 for Millstone, Unit 2 & Revised Rept for Jan 1993
ML20034H598
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/15/1993
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034H599 List:
References
MP-93-216, NUDOCS 9303190063
Download: ML20034H598 (1)


Text

.

e

' General Offices

i.e co acw son mwomecwne ema s.,oucn siers e"*

P.O. BOX 270 N((,,$,,7[Cd, HARTFORD. CONNECTICUT 06141-0270 k

J (203) 665-5000 os.* w wara wny u--

March 15, 1993 MP-93-216 Re: 10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR-65 i

Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown i

experience relating to Millstone Unit 2 for the month of February, 1993, in-accordance with Appendix A Technical Specifications, Section 6.9.1.6.

One additional copy of the report is enclosed. Also enclosed is a revised copy of the January, 1993, Operating Data Report, Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

=C Step dn E. Scace Vice President - Millstone Station SES/rab cc: T. T. Martin, R.egion 1 Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 P. D. Svetland, Senior Resident Inspector, Millstone Unit Nos. 1,2&3 190007

/ N

'i 9303190063 930315

/ /g osaan.ncy oes.

PDR-ADOCK 05000336

/

(-

R PDR i;;

y