ML20034H594
| ML20034H594 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/28/1993 |
| From: | Baron M, Miller D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CCN-93-14031, NUDOCS 9303190055 | |
| Download: ML20034H594 (14) | |
Text
-
' 2/
f
$ ACDyN3-ido31.:
[L ',.
- PHILADELPHIA ELECTRIC COMPANYi i
[c
. PEACH BOT 110M ATOMIC POWER STATION.=
t' R. D.1, Box. 208 :'
.x Delta, Pennsylvania 17314' nxn wrswniE rtmn or Exclu1Ner 0 17) 456,7014
.{
D. B. Miller, Jr.
" Vos Presdent March 12,.1993 Docket Nos. 277 50-278 I
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUI 3 JECT:
Peach Bottom Atomic Power Station Monthly Operating Report
' Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units.
i
'2 and 3 for the month of February 1993 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
3 Sincerely,.
j \\,g Q J)/f l_
\\
~
DBM/AAF/TJN/DRM/MJB: cmc j
Enclosure I
' ec:
R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania j
JJ. Lyash, USNRC Senior Resident Inspector R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC 1
H.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power l
~INPO Records Center
'i i
ccm3. sac t
~l l
M
/M i
I -'
9303190055 930228 U
7-NRC Monthly Operations Summary Peach llottom Atomie Power Station l'ebruary 1993 UNIT 2 Unit 2 operated the entire month at nominal 100% power. There were two brief power reductions. Load drops were taken on February 4 for MSIV testing, and on February 23 for main stop valve testing.
UNIT 3 Unit 3 operated at nominal 100% power for the entire month. There was a brief load drop on February for condensate filter demin regeneration.
a i
o P
i i
1 CC0293.NRC l
7-
.i l
' Docket No. 50-277 Attachment to Monthly Operating Report for February 1993 UNIT 2 REFUELING INFORMATION 1
1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 10 scheduled for September 10,1994.
l t
3.
Scheduled date for restart following refueling:
Restart following refueling forecast.for December 8,1994.
r i
4.
Will refueling or resumption of operation therefore require a technical specification change or other
]
license amendment?
No.-
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:.
i N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or stipplier, unreviewed design or performance analysis methods, significant changes in fuel design,' new operating..
procedures:
~
- i N/A b
' CGQ93.NRC f
- Docket No.50-277 -
Attachment to Monthly Operating.
Report for February 1993 -
Page 2 '
UNIT 2 REFUELING INFORMATION (Continued) 7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:
(a)
Core 764 Fuel Assemblies (b)
Fuel Pool - 2164 Fuel Assemblies,58 Fuel Rods -
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel poal assuming the present capacity:
September 2003 without full core offload capability.
September 1997 with full core offload capability.
CC0293.NRC lu
--,ry.,
k.,
Docket No. 50-278 -
1
. Attachment to Monthly Operating l
Report for February 1993
'[
UNIT 3 REFUEI.ING INFORM ATION 1.
Name of facility:
i Peach Bottom Unit 3 t
i r
~
2.
Scheduled date for next refueling shutdown:
)
Reload 9 scheduled for September 11,1993 i
I 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 14,1993 q
4 Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
92-19 Change safety limit MLPR for Cycle 10 i
92-13 CAD analyzer replacement 93-01 ARTS /MELLA 93-06 Drywell Rad Monitors 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
92-19 Scheduled for February 1993
.i 9213 Scheduled for February 1993
-[
93-01 Scheduled for April 1993 93-06 Scheduled for April 1993
(
- 6.'
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier,
-l unreviewed design or performance analysis methods, significant changes in fuel design, new operating ;
procedures:
N/A CCtCM.NRC i
1 Docket No.50-278-Attachment to Monthly Operating.
Report for February 1993 Page 2 r.
UNIT 3 REFUELING INFOR%fATION (Continued).
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblics (b)
Fuel Pool-1945 Fuel Assemblies,6 Fuel Rods 1
S.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the!
present capacity; f
September 2004 without full core offload capability.
September 1998 with full core offload capability.
i
- h
_t i
A CC0293.NRC
[!T'
- 6
.4' r-j-i-
?
h AVERAGE DAILY UNIT POWER LEVEL
~ +
t b
t DOCKET NO. 50 - 277-
[
UN!T PEACH BOT 10M UNIT 2 J[
l DATE MARCH 15, 1993 3
7 i'
COMPANY PHILADELPHIA ELECTRIC CDMPANY.
t M.'J. BARDW SUPERVISOR
'I REPORTS GROUP PEACH B0110M AfDMIC POWER $TA110N.
-f
.1ELEPHONE (717) 456-7014 EXT. 3321 -'
- i MONT H FEBRUARY 1993 j
r CAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-
.. [
(MWE NET)
(MWE-NET) 1 1071 17 1072 j
2 1063 18 1072 3
1071 19 1072 f
4 1067 20 1067 5
1056 21 1072 1
6 1067 22 1072 j
7 1059 23 1073-3 8
1072 24 1073 9
1068 25 1072 10 1072 26 1071-
-t 11 1072-27
>1072 12 1072 28 1071 1
13 1068 14 -
1D72 15 1072 16 1072 k
e
-f i
- =.
Y-
- AVERAGE DA!LY UNIT POWER LEVEL E'
DOCKET NO. 50 278
. UNIT PEACH BOTTOM UNIT 3
[;
DATE MARCH 15, 1993 COMPANY PHILADELPHIA ELECTRIC COMPANY-M. J. BARON SUPERVISOR.
REPORTS CROUP PEACH BOT 10M ATOMIC POWER STAT]DN TELEPil0NE (717) 456-7014 EXT.- 3321 MONTH IEBRUARY 1993 6
DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWE -NET)
(MWE NET) l 1
1070 17 1054 2
1033 18 1050-t u
3 1062 19 1046
{
4 1050 20 1050 1
5 1054 21 1053 6
1062 22 1049 1
7 1042 23 1047 8
1050 24 1052 9
1046.
25 1048 10 1058 26 105'3' i
11 1058 27 1050 12 1047 28 1054 13 1D46
' j 14 1059
. J 15 1046 l
16 1054 t
' f I
< 4
?
. k jL
4 2
.u.
f 7f DPERATING DATA REPORT
~+
DOCKETNo.Sb+277-
[
DATE MARCH 15, 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY ff l
H. J. BARON-SUPERVISOR REPORTS CROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATUS
- 1. UNIT KAME: PEACH BOTTOM UNIT 2 8 WOTES:
+
- 2. REPORTING PERIOD: FE BRUARY, 1993
'l g
3
- 3. LICENSED THERKAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (CROSS MWE):
1152
- 9 t
- 5. DESIGN ELECTRICAL RATING (kET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1055
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
-[
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY [ NET MWE):-
- 10. REASONS FOR RESTRIC110NS, IF ANY:
-I
.1 TH1$ MONTH-YR TO-DATE
. CUMULATIVE..
- 11. HOURS JN REPORTlWG PERIOD 672..
1,416 163,536
- 12. NUMBER OF H3URS REACTOR WAS CRITICAL 672.0 1,144.0
.99,528.1
.i
- 13. REACTOR RESERVE SHUTDOWN HDURS 0.0 0.0
' 0. 0.
g
- 14. H3URS GENERATGR DN LINE 6 72.0 -
~1,059.0-95,708.2,'
-i
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 s;
- 16. CROSS THERMAL ENERGY CENERATED (MWH) 2,202,739 3,398,069 283,767.813-
- 17. CROSS ILECTRICAL ENERCY GENERATED (MWH) 737,800 1,118,800 93,291,190~
i
- 18. NET ELECTRICAL ENERGY GENERATED IMWH) 718,793 1,087,417 89.374.,136
'I PAGE 1 0F 2' f
.. t
- 1
. I k
i i
. i
[
1 I
.l p
4 3y t
i 4
t e i
=
t '.
f 6
r
- +
t OPERATING DATA REPORT (CONTINUED)
DOCKET No. 50 - 2772 si 1
-i r
DATE MARCH'15,.1993 THIS MONTH
. YR-10-DATE'
'CUMULAllVE'
!u
- 19. UNIT SERV!CE f ACTOR 100.0 74.8
' 58.5.
- 20. UNIT AVAILABILITY FACTOR 100.0' 74.8 58.5 6
- {
- 21. UNIT. CAPACITY FACTOR (USING MDC NET) 101.4 72.8 _
- 51. 8 ~ -
- 22. UNIT CAPACITY f ACTOR (USING DER NET).
100.4 72.1 51.3
- {
- 23. UNIT FORCED DUTAGE RATE 0.0.
0.0 14.3
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF E ACH):
f I
- f
. t
- 25. If SHUTDOWN AT END OT. REPORT PERIOD, ESTIMATED DATE OF STARTUP; N/A
)
- 26. UNITS IN TEST STATUS (PRIOR TU COMMERCIAL OPERATION):
FORECAST - ACHIEVED l
INITIAL CRITICALITY 09/16/73 -
' {
1NITIAL ELECTRICITY 02/18/74'
.]
i COMMERCIAL DPERATION
, 07/05/74' l
c; Iq
- t 1
.1
[:
-i t
a k
PAGE 2 Of.2 i
r t
-+
9
' t.
1 P
1
};
1 e
r E
p~
.- w w.
, l*-f
_- 3_
fb v
4 hk
~
OPERATING DATA REPORT -
g;;
w DOCKET NO. 50 - 278
.............~..............
DATE MARCH 15, 1993L COMPLETED BY PHILADELPHI A ELECTRIC COMPANY :
M. J. BARON SUPERVISOR REPORTS CROUP:
PEACH BOTTOM ATOMIC POWER STAT!ON' TELEPHDNE (717) 456-7014 EXT. 3321 OPERAT]NG STATUS.
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIOD: FEBRUARY, 1993
+
- f
- 3. LICENSED THERMAL PDWER(MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152 f
{
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065 i
j
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
-l;
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1035
- 8. IF CHANGES OCCUR IN CAPACITY RAT!NCS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- j
- 9. PD'JER LEVEL TO VHICH RESTRICTED, IF ANY (NET MWE):
=h
?
- 10. REASONS FOR RESTRICTIONS, IF ANY:
h
.5 THIS MONTH YR TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1,416 159,432-
?
- 12. NUMBER OF HDURS REACTOR WAS CRITICAL 672.0
.1,416.0' 99,474.4 r
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0
' 0.0 0.0 i
- 14. HOURS CENERATDR DN LINE 672.0 1,416.0
-96,113.2 i
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,203,855 4,638,569 283,219,779
[
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,500 1,529,100L 92,969,232:
- 18. NET ELECTRICAL ENERGY CENERATED (MWH) 706,634 1,485,458 89,149,424 PAGE 1 OT 2'
-(
-i i
f
?
p i' "
T
s r-_
G
'q.,
.'M.
O OPERATING DATA REPORT { CONTINUED)
DOCKEi N0/ 50
- 278 '-
DATE MARCH 15,'1993-THl$ HONTH YR TO-DATE.
. CUMULATIVE
- 19. UN!T SERV!CE FACTOR 100.0 100.0 60.3-
.20. UNIT AVAItABIL17Y FACTOR 100.0 100.0 60.3 21.' UNIT CAPACITY FACTOR (USING MDC NET) 101.6 -
101.4-i54.0
- 22. UNIT CAFACITY / ACTOR (USING DER Nfi) 98.7 98.5 52.5
- 23. UNIT FORCED DUIACE RATE 0.0' 0.0 12.5 -
- 24. SHUTDOWNS SCHEDULED '0VER NEXT.6 MONTHS (TYPE, DATE, AND DURATION OF EACH);
- 25. IF 5HU100WM AT END OF REPORT PIRIOD, ESTIMATED DATE OF STARTUP: N/A'
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT!DN):
FORECAST ACHIEVED-INITIAL CR1TICAllTY 08/07/74' IN!TIAL ELECTRICITY 09/01/74 COMMERCIAL OPERAT10N 12/23/74
-PAGE 2 0F.2 --
' ' O ~!*^,
B.
l-py UNIT SHUTDOWNS AND POWER RLDUCTIONS'.
' DOCKET NO. 50 277.
F UNIT NAME. PEACH BOTTDM UNIT 2 '
DATE MARCH 15,.1993'-
REPORT MONTH FEBRUARY, 1993 COMPLETED BY PHILADELPHIA ELECTRIC CDMFANY H. J. BARON SUPERVISOR REPORTS CRDUP PEACH BOTTOM ATDMIC POWER STATION.
' TELEPHONE (717) 456-7014 EXT. 3321 i METHDD OF '
LICENSEE 'SYSTEN ' COMPONENT' 'CAUSE AND' CORRECTIVE TYPE DURATION RE ASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1) (HOURS), (2), REACTOR (3) 4.
REPORT #
(4)
(5)
PREVENT RECURRENCE I
5 9302D5 0.0 8
4 N/A CD VALVEX MSIV TESTING REACTOR WOT SHUTDOWN 6
930219 s
0.0 0
4 N/A-HB VALVEX MAIN STOP VALVE TESTING REACTDR NOT SHUT DOWN J
1 (1)
(2)
(3) i4) i F
FORCED REASON METHDD EXHIBIT G - INSTRUCTIONS
~
S + SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1.. MANUAL FOR PREPARAT]ON OF. DATA-B - MAINTENANCE OR TEST 2. MANUAL SORAM.
ENTRY SHEEl$ IDR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT. REPDRT (LER) <
D - RECULATORY RESTRICT 1DN 4 DiHER-(EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - DPERAT10NAL [RROR (EXPLAIN)
N - OTHER(EXPLAIN)
EXHIBli 1 SAME SOURCE h
1 i
f a
5 s
t b
7 L
o,
)
e h
Ne_'-
l 4
?
i
':9 l+,
y i
,e P
I:
T
-UNIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKET No. 50 + 278 1
................'............R UNIT NAME PEACH BOTTOM UNIT 3
- DATE MARCH 15, 1993
.. ~.........................,
REPORT MONTH FEBRUARY, 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY-Si M. J. BARON 5.I SUPERVISOR REPORTS CROUP
'i PEACH BOTTOM ATOMIC ' POWER STATION TELEPHONE (717) 456 7014 EXT. 3321 l
METHOD OF LICENSEE ' SYSTEM COMPONENT CAUSE AND CORRECTIVE EVENT CODE CDDE-
. AC110N TO l TYPE DURATION REASON SHUTTING DOWN (1). (HOURS).
(2)
REACTOR (3)
REPORT #
-(4) 4 -
(5)
PREVENT RECURRENCE 3
NO.
DATE s
i 4
'2 l 930219 Sl 0.0 B
4 N/A HG DEMINX FILTER DEM!N RECENERATION -
^
i REACTOR NOT SHUT DOWN 1
L k
.j-b-
- 'l h
I I
(1)
(2)
(3)
(4)-
's T FORCED REASON METHOD EXHIBli G - INSTRUCTIONS S. SCHEDULED A - EQUIPMENT TAILURE (EX0 LAIN) 1 - MANUAL
. TOR PRETARAT!DN Of DATA -
B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS IDR LICENSEE '
C REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER).
D + RECULATORY RESTR!CTION
.4 OTHER (EXPLAIN)
FILE (NUREG-0161)..
E OPERATOR TRAINING
- LICENSE EXAMINATION i
ADMINISTRATIVE.
(5)
G - OPERATIONAL ERROR (EXPLAIN)
H + OTHER(EXPLA!N)
- EXH]BlT-I' SAME SOURCE I
t
?
i i
.]
a
'I
=
w