ML20034H575

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-373/93-02 & 50-374/93-02 on 930111- 0211.Extent & Quality of Engineering & Technical Support at Site Good.Mods Reviewed Contained Adequate Design Control & Well Documented Safety Evaluations
ML20034H575
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/12/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20034H576 List:
References
NUDOCS 9303190023
Download: ML20034H575 (2)


See also: IR 05000373/1993002

Text

..-

.

MAR 121933

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company.-

l

ATTN:

Mr. L.

O. DelGeorge, Vice President

Nuclear Oversight and Regulatory

Services

Executive Towers. West III.

1400 Opus Place, Suite 300

j

Downers Grove, IL

60515

,

Dear Mr. DelGeorge:

f

'

The enclosed report refers to an. engineering and1 technical

support:(E&TS)-team inspection conducted by Mrs. Sonia.D. Burgess'

and others of this office on January litthrbugh February-..ll,.

j

1993.

The inspection' evaluated activitle' slat the LaSalletCountyl

!

.

Station authorized by NRC Operating License.Nos. NPF-111and'NPF--

l

18.-

We discussed our inspection findings;with Mr. W. Murphy and.

.

members of your staff at'the exit interview.on, February--11, 1993..

-j

-

.i

The purpose of this inspection wasito assess thi quality and'

l

effectiveness of engineering involvement ~in plant activities,

j

The~ inspection consisted of a selective' review of modifications

installed during your recent unit outages, relevant procedures,

j:

representative records, installed equipmenti and interviews with

j

engineering and technical support staff.

1

i

Overall, the team concluded that the extant and quality of-

i

engineering and technical support at the site was good. .

.

,

!

Modifications--reviewed contained adequate design control-and;well

i

documented safety evaluations.

Effective communications between

i

i]

engineering and other organizations'resulted in the~

identification and resolution of plant problems.

A weakness was

noted; however, in the documentation of engineering evaluations

-l

and post-modification testing of temporary system changes.

Recent organizational 1 changes made'iniengineering^will' provide

challenges; however, the movementlof-corporate engineering to the

LaSalle site will place the management of station: engineering-

onsite and closerLto the staff conducting.the activities.' The

~

organization changes were viewed as a positive initiative.

No violations of NRC requirements were identified duringithe

course of this inspection.

~

9303190023 930312

-PDR

ADOCK 05000373.

j

G

PDR 3,;

I

~j

--

a

.

.

Commonwealth Edison Company

2

MAR 121993

In accordance with 10 CFR 2.790 of the Commission's' regulations,

a copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

We will gladly discuss any questions you may have concerning this

inspection.

Sincerely,

_

... - . . T. O. !/JE :::

T.

O. Martin, Acting Director

division of Reactor Safety

Enclosure:

Inspection Reports

No. 50-373/93002(DRS);

No. 50-374/93002(DRS)

cc w/ enclosure:

W. Murphy, Site Vice

President

G.

Spedl, Station Manager

J.

Lockwood, Regulatory Assurance

Supervisor

D.

Farrar, Nuclear Regulatory

Services Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspectors-LaSalle,

Dresden, Quad Cities

Richard Hubbard

J. W. McCaffrey, Chief

Public Utilities Division

Licensing Project Manager, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois Center

State Liaison Officer

Chairman, Illinois Commerce

Commission

yc4

RIII

RIII

RI

RJII

RIII

c

s6 C Ocs

  • r-

'

AS

se &

i

S.

Burgess /sb/jk

Falevits

Langs

.f f

Lerch

McNeil-

,

3/6/93

3/ to /93

3/f/93

3/7 /93

3/9 /93

R II

JI -

911

RIII

!

RIII

RIII

4}2(T

/ ,Ig/

Y

qws

-j

s p<

,

jhright

Martin

Ne

elt

Tella

Winter

ue

3/$/93

3/ J/93

3/6 /93

3////93

3/jt /93

3/g,/93

'

i

i