MAR 121933
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company.-
l
ATTN:
Mr. L.
O. DelGeorge, Vice President
Nuclear Oversight and Regulatory
Services
Executive Towers. West III.
1400 Opus Place, Suite 300
j
Downers Grove, IL
60515
,
Dear Mr. DelGeorge:
f
'
The enclosed report refers to an. engineering and1 technical
support:(E&TS)-team inspection conducted by Mrs. Sonia.D. Burgess'
and others of this office on January litthrbugh February-..ll,.
j
1993.
The inspection' evaluated activitle' slat the LaSalletCountyl
!
.
Station authorized by NRC Operating License.Nos. NPF-111and'NPF--
l
18.-
We discussed our inspection findings;with Mr. W. Murphy and.
.
members of your staff at'the exit interview.on, February--11, 1993..
-j
-
.i
The purpose of this inspection wasito assess thi quality and'
- l
effectiveness of engineering involvement ~in plant activities,
j
The~ inspection consisted of a selective' review of modifications
installed during your recent unit outages, relevant procedures,
j:
representative records, installed equipmenti and interviews with
j
engineering and technical support staff.
1
i
Overall, the team concluded that the extant and quality of-
i
engineering and technical support at the site was good. .
.
,
!
Modifications--reviewed contained adequate design control-and;well
i
documented safety evaluations.
Effective communications between
i
i]
engineering and other organizations'resulted in the~
identification and resolution of plant problems.
A weakness was
noted; however, in the documentation of engineering evaluations
-l
and post-modification testing of temporary system changes.
Recent organizational 1 changes made'iniengineering^will' provide
challenges; however, the movementlof-corporate engineering to the
LaSalle site will place the management of station: engineering-
onsite and closerLto the staff conducting.the activities.' The
~
organization changes were viewed as a positive initiative.
No violations of NRC requirements were identified duringithe
course of this inspection.
~
9303190023 930312
-PDR
ADOCK 05000373.
j
G
PDR 3,;
I
~j
--
a
.
.
Commonwealth Edison Company
2
MAR 121993
In accordance with 10 CFR 2.790 of the Commission's' regulations,
a copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
We will gladly discuss any questions you may have concerning this
inspection.
Sincerely,
_
... - . . T. O. !/JE :::
T.
O. Martin, Acting Director
division of Reactor Safety
Enclosure:
Inspection Reports
No. 50-373/93002(DRS);
No. 50-374/93002(DRS)
cc w/ enclosure:
W. Murphy, Site Vice
President
G.
Spedl, Station Manager
J.
Lockwood, Regulatory Assurance
Supervisor
D.
Farrar, Nuclear Regulatory
Services Manager
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspectors-LaSalle,
Dresden, Quad Cities
Richard Hubbard
J. W. McCaffrey, Chief
Public Utilities Division
Licensing Project Manager, NRR
Robert Newmann, Office of Public
Counsel, State of Illinois Center
State Liaison Officer
Chairman, Illinois Commerce
Commission
yc4
RIII
RIII
RI
RJII
RIII
c
s6 C Ocs
- r-
'
se &
i
S.
Burgess /sb/jk
Falevits
Langs
.f f
Lerch
McNeil-
,
3/6/93
3/ to /93
3/f/93
3/7 /93
3/9 /93
R II
JI -
911
RIII
!
RIII
RIII
4}2(T
/ ,Ig/
Y
qws
-j
s p<
,
jhright
Martin
Ne
elt
Tella
Winter
ue
3/$/93
3/ J/93
3/6 /93
3////93
3/jt /93
3/g,/93
'
i
i