ML20034H284
| ML20034H284 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/01/1993 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20034H285 | List: |
| References | |
| NUDOCS 9303160326 | |
| Download: ML20034H284 (3) | |
Text
-.
..t
f b
UNITED STATES.
p"
~f NUCLEAR REGULATORY COMMISSION j
g E.
REGION V
/
1450 MARIA LANE WALNUT CREEK, CAUFORNIA 94596-5368 March 1, 1993 Docket No. 50-361, 50-362 Southern California Edison Company Irvine Operations Center 23 Parker Street Irvine, California 92718 Attentioni Mr. Harold B. Ray Senior Vice President, Nuclear *
Subject:
NRC Operator Licensing Examinations at San Onofre Nuclear Generating Station Units 2 and 3 On January 19 - 29, 1993, the NRC administered operator licensing examinations to employees of your company to operate your San Onofre Nuclear Generating Station Units 2 and 3.
As a result of these examinations, seven Senior Reactor Operators and nine Reactor Operators met the qualification.
requirements for licensing.
After the examinations on May 8,1992, the preliminary findings were discussed with' members of your staff as detailed in the enclosed report.
In.accordance with 10 CFR 2.790(a), a copy of this letter and enclosures (1),
(2), (4), and (5) will be placed in the NRC's Public Document Room.
Enclosure (3) is Personal Privacy Information and will be withheld from public disclosure in accordance with 10 CFR 9.5(a)(6).
Should you have any questions concerning this examination, please contact us.
Sincerely, G/
Lewis F. Miller Jr., Chief Reactor Safety Branch
Enclosures:
1.
_ Examination Report No. 50-361/0L-93-01, 50-362/0L-93-01 2.
Simulation Facility Report 3.-
Grade Summary Sheet 4.
' Facility Comments 5.
Resolution of Facility Comments 6.
Examinations and Answer Keys (R0/SR0) j 9303560326'930301 bhb
" ^
^
(
i J
i i
2 M rch.1, 1993 I
cc w/ enclosures (1), (2), (3), (4), (5), and (6):
R. Cross, RV (2 copies) i J. Reeder, Training Manager SONGS cc w/ enclosure (1) only:
H..E. Morgan, Vice President and Site Manager, SONGS R. W. Krieger Jr., Station Manager, SONGS M. Fields, NRR/PD5 1
-K. Perkins, RV C. Caldwell, SRI H. Wong, RV J. Martin, RV i
S. Richards, RV P. Morrill, RV G. Johnston, RV B. Faulkenberry, RV cc w/ enclosures (1), (2), (4), and (5) only:
i RSB/ Document Control Desk (RIDS) i
?
o i
I J
j
=
3 M rch 1, 1993 l
3E-QU.ESTCOPY REQgTCOPY l REQUESTl BEQUEST COPY (YES)/ NO
/TES / NO YES / NO (YES )/ N0 i
V w
GJOHNSTON _
LMILLER WONG h PMORRILL b'
b 2/J))93 24/93 2fpfl93 2/2L/93 COPY.:T0: _
V V
Qh-r
~$%m i
-