ML20034H031

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Rev 28 to Security Plan.Changes Consistent W/Provisions of 10CFR50.54(p) & Acceptable Except as Noted in Encl.Encl Withheld (Ref 10CFR2.790 & 73.21(c)(2))
ML20034H031
Person / Time
Site: Duane Arnold 
Issue date: 03/08/1993
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 9303150120
Download: ML20034H031 (4)


Text

y O C., C c

~

0N WM B 1993 Docket No. 50-331 Iowa Electric Light and Power Company ATTN: Mr. John F. Franz Vice President, Nuclear P. O. Box 351 Cedar Rapids, IA 52406

Dear Mr. Franz:

SUBJECT:

REVIEW 0F SECURITY PLAN SUBMITTAL This acknowledges receipt of your letter dated April 27, 1992, which transmitted changes identified as Revision 28 to the Duane Arnold Energy Center (DAEC) Security Plan submitted under the provisions of 10 CFR 50.54(p).

We have reviewed the submitted changes and have determined that they are -

consistent with the provisions of'10 CFR 50.54(p) and are therefore acceptable, except as noted in the enclosure of this letter.

For those. items identified as being unacceptable under the criteria'of 10 CFR 50.54(p), the previously approved plan revision must be followed. The items determined to be unacceptable have been discussed with NRC Headquarters (NRR/RSGB).

You are requested to provide corrections to your security plan to address the-issues identified in the enclosure within two months after receipt of this letter.

You may submit the changes either in accordance with'10 CFR' 50.54(p) or 10 CFR 50.90.

The enclosure to this letter concerns a subject matter which is exempt from disclosure according to Part 73, Title 10, Code' of Federal Regulations, Section 73.21(c)(2). Consequently, the enclosure to this -letter will not be placed in the NRC Public Document Room. The enclosure to your letter also contained Safeguards Information of a type specified in 10 CFR 73.21 and is also being withheld from public disclosure.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, excluding the enclosure, will be placed in the NRC Public h}

Document Room.

I jg a

gffgb, b 120033 clocure Contains EGU1EDS I2oBMATIOR Upon Soparation This 9303150120 930309 P330 10 & contro11ed DR ADOCK 050 1

g.

s 4

t ON l

Iowa Electric Light and Power 2

MAR g1993

)

Company 1.

- The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork l

Reduction Act of 1980, PL 96-511.

Sincerely, t

i Original Signed By William Snell Cynthia D. Pederson, Chief Reactor Support Programs Branch j

t

Enclosure:

Review Comments i

(SAFEGUARDS INFORMATION)

.i cc w/o SAFEGUARDS INFORMATION:

See Attached List bec w/ enclosure, w/o Attached List:

NRR/DRIS/RSGB SG Case File No:

0500033136WA SG Inspector File:

T. Madeda SG Correspondence File:

G. Christoffer NRR Docket File:

l 6bil' RIII RIII RIII RIII RIII j

MNeda Creed anksb0ry

.P son Chris fer/dg 3\\ bM 03/ 6 /93 5j'3,i

  • 3/g' /jj 3 + 'o n

i Enclosuro Contains SAFEOUARDS INFORMATION Upon Separation This hgo Io Decentrolled I

m 4

-i.

QVANE ARNOLD Docket No. 50-331 cc w/o SAFEGUARDS INFORMATION:

Jack Newman, Esquire Kathleen H. Shea, Esquire Newman & Holtzinger 1615 L. Street, N.W.

Washington, D.C.

20036 Chairman, Linn County Board of Supervisors-Cedar Rapids, Iowa -52406 lowa Electric Light and Power Company Plant Superintendent, Nuclear 3277 DAEC Road Palo, Iowa 52324 Vice President, Nuclear Duane Arnold Energy Center 3277 DAEC Road Palo, Iowa 52324 Manager, Nuclear Licensing Duane Arnold Energy Center

+

3277 DAEC Road Palo, Iowa 52324

+

U.S. Nuclear Regulatory Commission Resident Inspector Office Rural Route #1 Palo, Iowa 52324 Mr. Stephen N. Brown Utilities Division Iowa Department of Commerce Lucas Office Building, 5th Floor Des Moines, Iowa 50319 i

.i 8

LE-d