ML20034H003

From kanterella
Jump to navigation Jump to search
Proposed TS Changing Table 3.15 & Associated Bases for Seismic Monitoring Instrumentation Portion of TS
ML20034H003
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/05/1993
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20034H000 List:
References
NUDOCS 9303150050
Download: ML20034H003 (5)


Text

r I

i ATTACHMENT 2 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 TECHNICAL SPECIFICATION CHANGE List of Attached Pages Unit 2 Unit 3 240u 240u 240w 240w 9303150050 930305 PDR ADOCK 05000277 P

PDR E

r 4

Unit 2 4

PBAPS TABLE 3.15**

SEISMIC MONITORING INSTRUMENTATION.

f i

't Minimum Measurement Instruments Instruments and Sensor Locations #

Range Operable 1.

Triaxial Time-History Accelerographs a.

Containment Foundation

~

(torus compartment)

-1 to lg 1

b.

Refueling Floor

-1 to lg 1

c.

RCIC Pump (Rm #7)

-1 to lg 1

j d.

"C" Diesel Generator

-1 to lg 1

2.

Triaxial-Peak Accelerographs a.

Reactor Piping (Drywell) 0.01 to 2g 1

b.

Refueling Floor 0.01 to 2g 1

c.

"C" Diesel Generator 0.01 to 2g 1

l 3.

Triaxial Response-Spectrue. Recorders f'

a.

Cable Spreading Rm

-1 to lg 1*

l j

l With reactor control room annunciation

    • Effective upon completion of installation Seismic instrumentation located in Unit 2 E

t i

I 5

- 240u -

i

i t

t Unit 3 1

i PBAPS I

t TABLE 3.15**

~!

SEISMIC MONITORING INSTRUMENTATION

[

1 Minimum

?

Measurement

-Instruments'

.l Instruments and Sensor Locations #

Rance Operable-1.

Triaxial Time-History Accelerobraphs a.

' Containment Foundation 1l (torus compartment)

-1 to lg 1

l b.

Refueling Floor

-1 to lg-

~1 j

c.

RCIC Pump (Rm #7)

-1 to lg 1

i d.

C" Diesel Generator

-1 to lg 1

2.

Triaxial Peak Accelerographs a.

Reactor Piping (Drywell) 0.01 to 2g 1

l b.

Refueling Floor 0.01 to 2g 1

.j c.

"C" Diesel Generator 0.01 to 2g 1

3.

Triaxial Response-Spectrum Recorders

'l

-i a.

Cable Spreading Rm

-1 to.lg 1*

l

-i i

With reactor control room annunciation

    • Effective upon completion of installation l

Seismic instrumentation located in Unit 2 l

l i

i i

I l

i i

- 240u -

l

r I

j Unit 2 i

PBAPS l

i i

3.15/4.14 BASES The operability of the seismic monitoring instrumentation ensuren that sufficient capability is available to promptly determine the magni-l tude of a seismic event and evaluate the response of those features Important to safety. This capability is required to permit comparison of l

I the measured response to that used in the design basis for the plant.

' i The time-history recordings of the triaxial time-history j

accelerographs are done in the cable spreading room using a solid-state

{

necelerograph.

The data is then processed and the results of the-l response spectrum analysis can be evaluated following a' seismic event.

[

t n

f, i

i i.t i

f l

)

s i

- ?

- 240w -

a

)

.~

f v

Unit 3 i

PBAPS

.t i

h i

3.15/4.14 BASES l

i The operability of the seismic monitoring instrumentation ensures that sufficient capability is available to promptly determine the magni-

[

tude of a seismic event and evaluate the response'of those features important to safety.

This capability is required to permit comparison of the measured response to that used in the design basis for the plant.

The time-history recordings of the triaxial time-history accelerographs are done in the cable spreading room using a solid-state-accelorograph. The data is then processed and the results of the response spectrum analysis can be evaluated following a seismic event.

f I

t i

f l

l

-i b

- 240w -

~

.. -.