ML20034G984
| ML20034G984 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/08/1993 |
| From: | Pederson C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20034G985 | List: |
| References | |
| NUDOCS 9303150013 | |
| Download: ML20034G984 (2) | |
See also: IR 05000266/1993004
Text
Oc0
l
l
l
SAFEGUARDS INFORMATION
8 1993
l
l
l
l
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Robert E. Link
Vice President
Nuclear Power
231 West Michigan Street - P379
Milwaukee, WI 53201
Dear Mr. Link:
l
SUBJECT:
PHYSICAL SECURITY INSPECTION AT POINT BEACH
1
l
l
This refers to the inspection conducted by Mr. T. J. Madeda of this office on
l
February 8-12 and 22, 1993. The inspection included a review of authorized
activities for your Point Beach Nuclear facility. At the conclusion of this
inspection, the findings were discussed with those members of your staff
l
identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, and interviews with personnel.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation is of concern because it demonstrated weak
management overview resulting in a failure to properly search personnel
entering the protected area.
Although 10 CFR 2.201 requires you to submit to this office, within 20 days of
your receipt of this Notice, a written statement of explanation, we note that
this violation had been corrected and those actions were reviewed during this
inspection.
Therefore, no response with respect to this matter is required.
l
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2). This information must be handled and protect ~d in
accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure
to this letter and our report of this inspection will not be placed in the NRC
Public Document Room.
l
SAFEGUARDS INFORMATION
Encicoura contains
I
l-
9303150013 930308
l
ADOCK 05000266
SAFECU11D3 INF0ESTION
l
0
Upon Separation TMa
'
j
Pace la Decontrolled
I
T"6 bN
I
1
L
_-
-
,
,
SAFEGUARDS INFORMATION
Wisconsin Electric Power Company
2
W.AR
8 1993
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
Ori6inal Sigaj By William Snell
-
Cynthia D. Pederson, Chief
Reactor Support Programs Branch
Enclosures:
1.
2.
Inspection Reports
No. 50-266/93004(DRSS);
No. 50-301/93004(DRSS)
(SAFEGUARDS INFORHATION)
'
cc w/ enclosures:
G. J. Maxfield, Plant Manager
NRR/DRIS/RSGB9D
NMSS/HIGDON/4E4
OE Director
cc w/ enclosures, w/o
,
SAFEGUARDS INFORMATION:
'
DCD/DCB (RIDS)
,
OC/LFDCB
Resident Inspector, RIII
Virgil Kanable, Chief
Boiler Section
Charles Thompson, Chairman
Wisconsin Public Service
!
Commission
r
Robert M. Thompson, Administrator
i
,
RIII
RIII .
RIII
RIli
'
w
. (p d
4%
4/4
Madeda/dg
Creed
Jackiw'
/ Pederson
03/J /93
[l
3/s/j,1
r.nelenure Ornstne
SAFEGUARDS INFORKATION
+
styggeARN nwonxATION
Upon Sepuntion This
Paco In Decontrolled
,
,
.
.