Notifies of Plans to Conduct Insp of Training Programs for Licensed Operator Requalification Program for RO & SRO Positions at Plant on 930413-23.Requests Matls Listed in Encl by 930329
ML20034G914
Person / Time
Site: Haddam Neck, Millstone  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/05/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 9303120089
Download: ML20034G914 (5)


Text

.

r 0 033 Docket Nos. 50-245 50-336 50-423 50-213 Mr. John F. Opeka Executive Vice President - Nuclear Nonheast Nuclear Energy Company P.O. Box 270 Hartford, Connecticut 06141 - 0270

Dear Mr. Opeka:

SUBJECT:

NRC INSPECTION OF TRA NING PROGRAMS AT MILLSTONE UNITS 1,2, AND 3, AND THE CONNECTICUT YANKEE ATOMIC POWER STATION An NRC inspection of the Millstone Units 1,2, and 3 and the Connecticut Yankee Atomic Power Station training programs was discussed in a telephone conversation on March 5,1993, between Mr. M. Brown (Actinng for Mr. J. Black, Director, Nuclear Training), and Mr. R. Conte, Chief, BWR Section. This inspection is in keeping with NRC policy, to do such inspections for identified training problems. The Millstone Unit 1 Licensed Operator Requali0 cation Training Program was rated unsatisfactory in consecutive years of 1991 and 1992. This warranted a review and the establishment of a b for continued safe operation.

The NRC plans to conduct this inspection during the period of April 13 through 23,1993, which includes a weekend. ille weekend activity will focus on in-plant observation /

discussion with personnel on duty. Training programs for the licensed operator lequalification program for the RO and SRO positions at each of the four units will be inspected.

In order for the NRC staff to prepare for the inspection, we request that you provide the materials listed in Enclosure 1 to the NRC Region I office by March 29,1993, to the attention of Mr. R. Conte.

The staff will select speciGc tasks for inspection from the submitted task lists. We will inform your staff of our selection before the inspection so that training material specific to the tasks will be readily available at the site.

110018 OFFICIAL RECORD COPY G:HNMTP412 9303120089 930305 qf PDR ADOCK 0500

, p; 0

'\\

.i 9

1 i

Mr. John F. Opeka 2

i NUREG-1220, Rev.1, " Training R: view Criteria and Procedures," and NRC staff

'l Inspection Procedure 41500, " Training and Qualification Effectiveness," provide guidance on -

]

the purpose and content of the inspection. These documents will be released shortly and will be provided for your review prior to the inspection.

l l provides a general list of the types ofinformation and resources we expect to have available at the site to perform our inspection of your trainmg programs.

l Your cooperation with us in this matter is appreciated. If you have any questions concerning l

this matter, please contact Mr. R. Conte, of my staff, at 215-337-5210.

i Sincerely, l

m !) b 12e H. Bettenhausen, Chief Operations Branch Division of Reactor Safety l

Enclosures:

1. - List of Requested Information _

[

t

2. - List of Information and Resources t

l f

r OFFICIAL RECORD COPY G:HNMTP412

{

?

1 I

i

4

.n t

Mr. John F. Opeka 3

cc w/encls:

W. D. Dmberg, Vice President - Nuclear Operations Services S. E. Scace, Vice President, Millstone Nuclear Power Station

[

J. P. Stetz, Vice President, Haddam Neck

[

H. F. Haynes, Nuclear Unit Director, Millstone Unit 1 J. S. Keenan, Nuclear Unit Director, Millstone Unit 2 C. H. Clement, Nuclear Unit Director, Millstone Unit 3

-[

R. M. Kacich, Director, Nuclear Licensing

-l D. O. Nordquist, Director of Quality Services Gerald Garfield, Esquire Nicholas Reynolds, Esquire K. Abraham, PAO (2)

Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) j NRC Resident Inspector, Haddam Neck NRC Resident Inspector, Millstone Unit 1 NRC Residen.t Inspector, Millstone Unit 2 NRC Resident Inspector, Millstone Unit 3 i

State of Connecticut SLO bcc w/encls Region I Docket Room (with concurrences)

L. Bettenhausen, DRS R. Conte, DRS G. Meyer, DRS l

H. Williams, DRS W. Raymond, SRI, Haddam Neck P. Swetland, SRI, Millstone V. McCree, OEDO D. Jaffe, PM, NRR i

G. Vissing, PM, NRR R. De La Espriella, DRP R. Barkley, DRP OL Facility Files (4)

DRS Files (4)

RI:DRS RI:DRS

@ RI:DRP NRR:HRB RI:DRS Willi, /ajk Con

' Blough Swenso / Be hausen 03/4 /93 03t//93/"

03/1793 03/J/93 35 /93 l

))4)g AE4 EW OFFICIAL RECORD COPY G:HNMTP412 j

l i

b

O-e ENCLOSUREI LIST OF REQUESTED INFORMATION The following is a list of information needed to prepare for the inspection at each unit:

Task list for the positions being reviewed (Reactor Operator and Senior Reactor Operator) - clearly indicate initial and continuing training tasks.

Instructions / procedures related to:

Systematic methods used to analyze jobs, Training organi7ation goals, objectives, and plans, Responsibilities / authority of training organi;;ation personnel, Methods for evaluation / selecting instructional materials, methods, and media, Methods for organizing / sequencing of training, Methods for keeping training programs current, Maintenance of training records, Selection of candidates for trainim; and the granting of waivers / exemptions from training, Evaluation of training programs, Training, qualification, and evaluation ofinstructors, and Interface between the training department and plant organization.

Roster / organization charts for the training and plant operations organizations. The chart should represcr1 the interface between training and operations organizations. A list of phone numbers should also be provided.

Schedule for requali0 cation training for the past six months and the next six months for the positions being reviewed.

A detailed training schedule for the weeks of the inspection for the positions being reviewed.

A list of trainees scheduled to attend this training.

A listing of licensed operator personnel and RO/SRO trbing instructors, along with their supervision, that will be available for interview witnout signincantly impacting plant activities, such as relief or training crews.

Qualifications and experience standards for the positions being reviewed.

Qualification and experience standards ofinstructors for the positions being reviewed.

1 l

l l

1 l

l

~

ENCLOSURE 2 LIST OF INFORMATION AND RESOURCES TO BE AVAILABLE ON SITE The following is a list of the types of information and resources we need to have available at the site to gain information about the training program.

I Documentation related to:

Development / validation of task lists Selection of tasks for requalification training i

Analysis of on-the-job performance problems and industry events, t

i Evaluation / audits for the training programs, and Lesson plan for training to be conducted during 11 c inspection Resumes of instructors for the positions being reviewed

)

Pour rooms to conduct interviews involving three people (2 NRC and I licensee representative at a time).

The team intends to interview a number of operators, instructors and members of management. Cognizant training personnel involved with the development and maintenance of the training programs should be available to answer questions or clarify issues, t