Confirms Granting of Temporary Waiver of Compliance from TS Requirement Contained in TS 3.8.9.b,based on Util Determination That Calibr Record of Crsli Indicates History of Proven Reliability
ML20034G484
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/02/1993
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
References
TAC-M85831, NUDOCS 9303090580
Download: ML20034G484 (5)


Text

_

m.

M Et0g.

k D-

f-

'o UNITED STATES

+

g l'

NUCLEAR REGU!.ATORY COMMISSION :

g

%. I e

wAsHmcTON, C,Je'. 20555 i

t 8

Ma.ch 2. 1993

%,....+f i

q i

l Docket Nos. 50-295 and 50-304 1

i

.I Mr. Thomas J. Kovach i

t Nuclear Licensing Manager.

1 Commonwealth-Edison Company-Suite 300 OPUS West III l

1400 OPUS Place 1

Downers Grove, Illinois 60515

Dear Mr. Kovach:

SUBJECT:

ZION STATION, UNIT 1 - TEMPORARY WAIVER OF COMPLIANCE FROM TECHNICAL f

SPECIFICATIONS SECTION 3.8.9.b. (TAC NO. M85831).

l 5

This letter confirms the granting of a Temporary Waiver of Compl'iance (TWOC) l from the Technical Specifications (TS) requirement contained in the Zion l

Nuclear Power Station, Unit 1, TS Section 3.8.9.b, " Limiting Condition for Operation," (LCO) which requires that if less than one channel of the Containment Recirculation Sump Level. Instrumentation (CRSLI) is-operable,.

i and if a channel can not be restored to operable status within '48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />,. the reactor must be placed.in at least Mode 4 within the next-12 hours.

A TS amendment was issued on January 27, 1993, with an implementation date of February 26, 1993, that'added certainl instrumentation calibration requirements to Tables 3.8.9-1 and 4.8.9-1;' including a calibration frequency for the CRSLI of 18 months.

Prior to the amendment.being issued, calibration of.these instruments was administratively controlled, with a frequency of 36 months.

At the time of Commonwealth Edison Company's -(Ceco) review of the TS change request in February 1992, the CRSLI were within the proposed 18 month calibration frequency since they had last been calibrated in March 1991.

t However, the calibration frequency was left at 36 months instead of. being changed to 18 months to be consistent with the TS change request. -If the y

calibration frequency had been changed,' the CRSLI would have been calibrated during the Unit I refueling outage in the spring of'1992'and, upon

)

implementation, the CRSLI would have met the requirements of. the: amendment.

Prior to the amendment -implementation date, it was discovered that the Unit I

~

l CRSLI would not be within the required' calibration frequency upon the amendment's implementation.

.i h

g g g R G D w Np " Ql 080017 l

9303090580 930302 4

i I

( f"' p ~-

PDR _.ADOCK 05000295 p

PDR g

I

.. - -,,.~

>4 4

,o

=.

Mr. Thomas J. Kovach f

?

In a telephone call on February 25, 1993, the need for this TWOC was discussed with the NRC staff.

This conversation was followed by a letter dated

-[

February 26, 1993, in which CECO formally requested that it be allowed to delay the performance of the Channel Calibration _ requirements of Specification 4.8.9 for the two Unit 1 CRSLI pending issuance of a TS amendment, on a l

routine basis, that grants a one-time extension to the CRSLI_ Channel Calibration requirements until the next Unit I refueling outage, currently scheduled for the fall of 1993, or a forced outage of Unit I to Mode 3 occurs.

I understand that, during the period of time that this TWOC is in effect, Zion i

Nuclear Power Station will take the following compensatory actions to ensure the plant is maintained in a safe and stable condition:

i a.

Containment water level (wide range) instrument channels and refueling I

water storage tank (RWST) level instrument channels shall bc maintained operable in accordance with Specification 3.8.9.

b.

Appropriate operating personnel will be notified to ensure these actions i

are maintained.

In a telephone conversation at 1:45 PM (CST) on February 26, 1993, the NRC staff granted the requested relief.

By copy of this letter, the NRC is confirming the granting of your request for a Temporary Waiver of Compliance j

to delay the performance of the Channel Calibration requirements of Specification 4.8.9 for the two Unit 1 Containment Recirculation Sump Level Instruments pending issuance'of a TS amendment, on a routine basis, that grants a one-time extension to the CRSLI Channel Calibration requirements-until the next Unit I refueling outage, currently scheduled for the fall of 1993, or a forced outage of Unit 1 to Mode 3.

This TWDC is effective j

immediately, to expire at 5:00 PM (CST) on June 30, 1993, which will allcw sufficient time for Ceco to submit, and the NRC staff to review, a TS amendment request for a one-time extension to the Containment Recirculation i

Sump Level Instrumentation Channel Calibration requirements until the next Unit I refueling outage currently scheduled for the fall of 1993.

The NRC's basis for granting this Temporary Waiver of Compliance is its

)

agreement with the CECO determination that the calibration record of the CRSLI is a history of proven reliability. The NRC staff considers it to be in the interests of the health and safety of the public to grant the TWOC to avoid putting Unit I through the unnecessary thermal transient of a reactor shutdown.

Performance of the Channel Calibrations with the reactor at power is also not a desirable option due to the high radiation dose which would be incurred by personnel performing the calibration. To resolve this issue, Ceco has also committed to submit a TS change request by March 5, 1993, that will request a one-time extension to the CRSLI Channel Calibration requirements until the next Unit I refueling outage.

i i

1 1

J l

'l 1

+

i Mr. Thomas J. Kovach The requested relief was granted at 1:45 PM (CST) on February 26, 1993, to

[

Richard Tuetken of the Zion Station staff. The TWOC was effective immediately, and will remain valid until 5:00 PM (CST) on June 30, 1993.

Sincerely, Original Signed by John A. Zwolinski John A. Zwolinski, Assistant Director for Region 111 Reactors Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactcr Regulation r

cc:

See next page DISTRIBUTION:

Docket Files NRC & Local PDRs i

PDIll-2 r/f T. Murley F. Miraglia J. Partlow J. Lieberman, OE J. Roe J. Zwolinski i

J. Dyer C. Moore C. Shiraki OGC D. Hagan G. Hill (4)

Wcnda Jones Eb C. Grimes ACRS (10)

OPA OC/LfDCB R. Hall M. Boyle r

B. Clayton, Rlll

' %&$ f b

2 111-2 PM:PDIll 2 D:PDillJ,,

D:DRP:Rlli r-AD3:/'gRj 00RL CSHIRAKI JDYER 77 EGREENMAN JZWOL.mSKI 3/2-/93 3/)s/93 3/ 1//93 3/)_,/93 3/1p/93 P

~.

1 P

i E

Mr.-Thomas J. Kovach Zion Nuclear Power Station Commonwealth Edison Company-Unit Nos. I and 2 j

i CC:

Michael 1. Miller, Esquire Sidley and Austin l

One_ First National Plaza Chicago, Illinois 60690 Dc. Cecil Lue-Hing Director of Research tad Development Metropolitan Sanitary District cf Greater Chicago 100 East Erie Street Chicago, Illinois 60611 i

Phillip Steptoe, Esquire Sidley and Austin One First National Plaza i

Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 l

t Illinois Department of Nuclear Safety i

Office of Nuclear Facility Safety 103S Outer Park Drive Springfield, Illinois 62704 l

U. S. Nuclear Regulatory Commission Resident inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Region 111 i

U. S. Nuclear Regulatory Commission 3

799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 s

Robert Neumann Office of Public Counsel l

State of Illinoi-Center 100 W. Randolph Suite 11-300 t

Chicago, Illinois 60601 9

i 5

d j

,=.

t I

-~

Mr. Thomas J. Kovach ;

i The requested relief was granted at 1:45 PM (CST) on February 26, 1993, to Richard Tuetken of the Zion Station staff. The TWOC was effective-immediately, and will remain valid until 5:00 PM (CST) on June 30, 1993.

Sincerely, Original Signed by John A. Zwolinski John A. Zwolinski, Assistant Director for Region 111 Reactors Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Docket Files NRC & Local PDRs PDill-2 r/f T. Murley F. Miraglia J. Partlow J. Lieberman, OE J. Roe l

J. Zwolinski

-J. Dyer C. Moore C. Shiraki OGC D. Hagan G. Hill (4)

Wanda Jones C. Grimes ACRS (10)

OPA OC/LFDCB R. Hall M. Boyle B. Clayton, Rill E

d.$.fr6&$

2 L( (ll-2 PM:PDilI 2 D:PDlli),,

D:DRP:RllI c-AD3:K 00RE CSHIRAKI JDVER GV EGREENMAN JZWOL SKI 3/2./93 3/)s/93 3 7//93 3/)_/93 3/15/93 f