ML20034G373

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for Feb 1993
ML20034G373
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/28/1993
From:
CENTERIOR ENERGY
To:
Shared Package
ML20034G364 List:
References
NUDOCS 9303090408
Download: ML20034G373 (1)


Text

_

INDUSTRIAL PRETREATMENT QUARTERLY SELF-MONI'IORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.

Report Date: 2/23/93 Perry, Ohio 44081 Laboratory: Wadsworth/ Alert Date of Sample: 2/4 to 2/5/93 Time of sample: 0925 Sample Location: Sewage Pump Station Name of Sampler: Greg Neuman Laboratory Address: 1401 Shuffel Dr.

North Canton OH 44720 Date of Analysis: 12/5 to 2/17/93 Flow: 46,000 gpm Name of Analyst: Shery Fazzio PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.2 2/8 to 2/9 300 mg/L BOD Composite 405.1 2/5 to 2/10 110 mg/L TSS Composite 160.2 2/10/93 88 mg/L Silver Composite 200.7 2/17/93 None Detected pH Composite 150.1 2/5 8.3 s.u.

I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete.

I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisor. ment.

f f

f Vice President - Nuclear Signatsre' Date Title l

1 i

f 930309040s 930305 PDR ADOCK 05000440 R

PDR j

l