Amends 76 & 75 to Licenses DPR-80 & DPR-82,respectively, Allowing for one-time Extension of 7-day DG AOT to Complete Mods & Associated Testing to Support Installation of New Sixth EDG
ML20034G313
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/02/1993
From: Quay T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20034G301 List:
References
NUDOCS 9303090324
Download: ML20034G313 (7)


Text

.

UNITED STATES o

.{

E

,E NUCLEAR REGULATORY COMMISSION c,)

c WASHINGTON, D.C. 20555

,,,,+

PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-27!i DIABLO CANYON NUCLEAR POWER PLANT. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING QCfN_S1 Amendment No. 76 License No. DPR-80 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Pacific Gas & Electric Company (the licensee) dated October 30, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:

9303090324 930302 PDR ADOCK 05000275 P

PDR

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 76, are hereby incorporated in the i

license.

Pacific Gas & Electric Company shall operate the facility in accordcnce with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of the date of its issuance.

l FOR THE NUCLEAR REGULATORY COMMISSION S.

3 Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

March 2,1993 t

p

't h

i t

a

p arc O{

Q n

UNITED STATES 3

L mE NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. 20555

\\...../

PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 75 License No. DPR-82 i

1.

The Nuclear Regulatory Commission (the Commission) has found that:

1 A.

The application for amendment by Pacific Gas & Electric Company (the licensee) dated October 30, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; i

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:

(2)

Technical Soecifications The Technica1' Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 75

, are hereby incorporated in the i

license.

Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.

3.

This license amendment is effective as of the date of its issuance.

i FOR THE NUCLEAR REGULATORY COMMISSION Nb*W ct Theodore R. Quay, Director l

Project Directorate V Division of Reactor Projects Ili/IV/V l

Office of Nuclear Reactor Regulatio

Attachment:

Changes to the Technical Specifications Date of Issuance: March 2, 1993 I

l J

ATTACHMENT TO LICENSE AMENDMENTS

[

AMENDMENT NO. 76 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 75 TO FACILITY OPERATING LICENSE NO. DPR-82 i

DOCKET NOS. 50-275 AND 50-325 i

Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change. Overleaf pages are also included, as appropriate.

REMOVE INSERT 3/4 8-2 3/4 8-2 I

d b

i d

I I

-1 1

i I

l 3/4. 8 ELECTRICAL POWER SYSTEMS A.C. SOURCES

, LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

Two independent circuits (one with delayed access) between the offsite transmission network and the Onsite Class IE Distribution System, and b.

Three separate and independent diesel generators,* each with:

1.

A separate engine-mounted fuel tank containing a minimum volume of 200 gallons of fuel, and 2.

Two supply trains of the Diesel Fuel Oil Storage and Transfer System containing a minimum combined storage of 33,000 gallons of fuel for one unit operation ** and 65,000 gallons of fuel for two unit operation.

APPLICABILITY:

M3 DES 1, 2, 3, and 4.

ACTION:

. a'.

With one offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

sources by performing Specification 4.8.1.1.la. within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

If each of the diesel generators have not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> demonstrate its OPERABILITY by performing Specification 4.8.1.1.2a.2) separately for each such diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HDT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With a diesel ge wrator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Specification 4.8.1.1.la within I hcur and at least once per 8 hot.rs thereafter; and if the diesel generator became inoperable due to any cause other than preventive maintenance or

  • For a five diesel generator configuration, OPERABILITY of the third (comon) diesel generator shall include the capability of functioning as a power source for the required unit upon automatic demand from that unit.

During this surveillance, the diesel generator fuel oil storage requirement for cne unit operation in Modes I through 4 and one unit operation in Mode 6 with at least 23 feet of water above the reactor vessel flange or with the reactor vessel defueled is 35,000 gallons. The tank being cleaned may be inoperable for up to 10 days.

For the duration of tank cleaning, temporary onsite fuel oil storage of 24,000 gallons will be maintained.

Prior to removal of a tank from service, the offsite circuits required by Technical Specification 3.8.1.1.a will be verified to be OPERABLE.

DIABLO CANYON - UNITS 1 & 2 3/4 8-1 Amendment Hos. 44 & M, 74 & 73 m

. m..

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION ACTION (Continuedi i

testing, demonstrate the OPEPABILITY of the remaining OPERABLE diesel generators by performing Specification 4.8.1.1.2a.2) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *; restore the diesel generator to OPERABLE status within 7 days ** or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With one offsite circuit and one diesel generator of the above c.

required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Specifica-tion 4.8.1.1.la within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> there-l after; and if the diesel generator became inoperable due to any cause other than preventive maintenance or testing, demonstrate the OPER-ABILITY of the remaining OPERABLE diesel generators by performing Specification 4.8.1.1.2a.2) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the other A.C. power source (offsite circuit or diesel generator) to OPERABLE status in accordance with l

ACTION a. or b., as appropriate with the time requirement of that ACTION statement based on the time of initial loss of the remaining inoperable A.C. power source. A successful test of diesel OPERA-BILITY per Specification 4.8.1.1.2a.2) performed under this ACTION statement for OPERABLE diesels or a restored to OPERABLE diesel satisfies the diesel generator test requirement of ACTION a. or b.

d.

With one diesel generator inoperable in addition to ACTION b. or c.

above verify that:

J 1.

All required systems, subsystems, trains, components ar.d devices that depend on the remaining OPERABLE diesel generators as a source of emergency power are also OPERABLE, and 2.

When in MODE 1, 2, or 3 that at least two auxiliary feedwater pumps ate OPERABLE.

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the l

following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

  • This test is required to be completed regardless of when the inoperable diesel generator is restored to operability.
    • For a five diesel generator configuration, the inoperable diesel generator l

shall be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. However, once per calendar year, the third (common) diesel generator may be inoperable for up to 7 days (14 days during the Unit 2, fifth refueling outage) for preplanned preventive maintenance and testing provided one unit is in Mode 5 or Mode 6, or in a defueled condition and the other four diesel generators are OPERABLE.

Surveillance Requirements 4.8.1.1.la and 4.8.1.1.2a.4 shall be performed i

within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to removal of Diesel Generator 3 from service. During the 7 day (14 days during the Unit 2, fifth refueling outage) period the l

l remaining four diesel generators shall be verified OPERABLE at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (in addition to any testing required by Table 4.8-1).

In the event these conditions are not met, the unit in Mode 1, 2, 3, or 4 will be placed i

in HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The provisions of Technical Specification 3.0.4 do not apply.

DIABLO CANYON - UNITS 1 & 2 3/4 8-2 Amendment Nos. -4+ &49,76 & 75