'W)
'
. -
,
!
[*
,
FEB 2 21993
Docket No. 50-293
Mr. E. Thomas Boulette
l
Senior Vice President-Nuclear -
Boston Edison Company
Pilgrim Nuclear Power Station
RFD #1 Rocky Hill Road
Plymouth, Massachusetts 02360
Dear Mr. Boulette:
SUBJECT: PILGRIM INSPECTION 93-03
This refers to the safety inspection conducted by Messrs. J. Macdonald and D. Kern, of this
,
office on January 1 through February 10,1993 at the Pilgrim Nuclear Power Station, Plymouth,
Massachusetts. Areas relevant to the health and safety of the public examined during this
inspection are described in the enclosed report. Our findings were based upon observations of-'
performance and independent evaluations of safety systems and quality records. The preliminary
results have been discussed with Mr. E. Kraft and other members of your staff at the conclusion
of the inspection.
1
Safe plant operations and good attention to detail were observed by our inspectors. Your efforts
j
to develop a program to reduce the effects of salt spray buildup on the 345 KV switchyard'were
noteworthy. An initiative which we selected for inspection during this period focused upon the
'l
reliability of the instrument air system, and we concluded that the system has been adequately
i'
operated and maintained.
No reply to this report is necessary, and your cooperation with us is appreciated.
j
Sincerely,
RI INAL SIGNED BY:
/"
James Linville, Chief
Projects Branch No. 3
.
Division of Reactor Projects
Enclosure: NRC Inspection Report No. $0-293/93-03
I
gjR39888[Zj8$$$ha
OFFICIAL RECORD COPY
- I
,
o
I-
d
'
_'
..
Mr. E. Thomas Boulette
2
cc w/ encl:
E. Kraft, Vice President, Nuclear Operations and Station Director
L. Schmeling, Plant Manager
.
V. Oheim, Manager, Regulatory Affairs Department
D. Tarantino, Nuclear Information Manager
N. Desmond, Compliance Division Manager
i
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts
The Honorable Edward M. Kennedy
The Honorable John F. Kerry
,
The Honorable Edward J. Markey
The Honorable Therese Murray
The Honorable Peter V. Forman
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
-
Chairman, Duxbury Board of Selectmen
Plymouth Civil Defense Director
Paul W. Gromer, Massachusetts Secretary of Energy Resources
Sarah Woodhouse, Legislative Assistant
A. Nogee, MASSPIRG
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering
Office of the Attorney General, Commonwealth of Massachusetts
T. Rapone, Massachusetts Executive Office of Public Safety
Chairman, Citizens Urging Responsible Energy
Public Document Room (PDR)
'
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2 copies)
NRC Resident Inspector
Commonwealth of Massachusetts, SLO Designee
OFFICIAL RECORD COPY
.
,
, , . - -
- ,
.
>
.
FEB 2 21993
Mr. E. Thomas Boulette
.3
bec w/ encl:
Region I Docket Room (with concurrences)
DRS/EB SALP Coordinator
J. Linville, DRP
E. Kelly, DRP
,
J. Macdonald, SRI - Pilgrim (with concurrences)
W. Butler, NRR -
R. Eaton, NRR
V. McCree, OEDO
R. Fuhrmeister (Sections 2.2 and 6.2)
bec w/ Letter and Executive Summary Only:
T. Martin, RA
'
W. Kane, DRA
C. Hehl, DRP
J. Wiggins, DRP
R. Cooper, DRSS
W. Hodges, DRS
W. Lanning, DRS
'
'
C. Anderson, DRS
L. Bettenhausen, DRS
J. Joyner, DRSS
,
b
.
44 fo<
RI:D P
RI:DRP
RI-
P
h
dia donald /meo
ely
inv'lle
.'
2/19/93
f/ M
OFFICIA'L RECORD COPY
A:PIL9303.MEO
I