ML20034F255
| ML20034F255 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/25/1993 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20034F256 | List: |
| References | |
| CON-NRC-93-023, CON-NRC-93-23 VPNPD-93-046, VPNPD-93-46, NUDOCS 9303020493 | |
| Download: ML20034F255 (1) | |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
9 i
' Electnc POWER COMPANY 231 W Michgan. PO Ba 204a Mawasee # 53201-204$
(414)221 2 2 VPNPD-93-046 10 CFR 50.59 NRC-93-023 February 25, 1993 3
Document Control Desk U.
S. NUCLEAR REGULATORY COMMISSION Mail Statinn P1-137 Washington, DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 ANNUAL RESULTS AND DATA REPORT - 1992 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed is the annual Results and Data Report for Point Beach Nuclear Plant, Units 1 and 2, for the year 1992.
This report is submitted in accordance with Technical Specification 15.6.9.1.B pursuant to the requirements of 10 CFR 50.59(b).
The report contains information regarding operational highlights of Point Beach Nuclear Plant operations during 1992 and includes descriptions of facility changes, tests and experiments, personnel occupational exposures, results of steam generator in-service inspections, and listings of reactor coolant system relief valve challenges.
Ten copies of this report are also being provided to you under separate cover.
Because of printing delays, we are submitting unbound copies.
We will send finished, bound copies of this report by March 31, 1993.
We apologize for any inconvenience this may cause.
Sincerely, Bob L7n Vice President Nuclear Power Enclosures cc:
NRC Resident Inspector NRC Regional Administrator DAW /akf 02001G 9303020493 930225 4
PDR ADOCK 05000266
[
I R
,,gsyggyimwpm, a,,p,w,,
y