.t 9.
s I
' s
@ 10 Docket No. 50-219 Mr. John J. Barton Vice President and Director GPU Nuclear Corporation Oyster Creek Nuclear Generating Station l
P.O. Box 388 Forked River, New Jersey 08731
Dear Mr. Barton:
SUBJECT:
MEETING TO DISCUSS INCORPORATION OF OYSTER CREEK SIMULATOR INTO EXISTING TRAINING PROGRAMS This letter refers to the meeting held on January 26,1993, at the NRC Region I office in King of Prussia, Pennsylvania. The purpose of the meeting was to discuss the incorporation-of the Oyster Creek plant specific simulator into the existing training programs. Enclosure 1 provides a summary of the meeting.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and -
the enclosed report will be placed in the NRC Public' Document Room.
No response is required. Your cooperation with our staff in these matters is appreciated.
Sincerely, s m
- h. IL U C L 2'-
Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety i
Enclosure-
- 1. Meeting Summary with Attachment OFFICIAL RECORD COPY G:0YSSIM.MTG l
l i
9303020342 930219
]
PDR ADOCK C5000219 i
PDR V
/ kW f
'\\
Mr. John J. Barton 2
cc w/ encl:
M. Laggart, Manager, Corporate Licensing P. Czaya, Acting Licensing Manager, Oyster Creek Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector State of New Jersey bcc w/ encl:
Region I Docket Room (with concurrences)
L. Bettenhausen, DRS R. Conte, DRS D. Florek, DRS J. Joyner, DRSS R. Blough, DRP J. Rogge, DRP V. McCree, OEDO A. Dromerick, NRR/PD 1-4 F. Young, SRI, Three Mile Island N. Dudley, SRI, Seabrook DRS File P
i
{1
,I, p
Rl:DR.
RI:DRS alker/ajk Conte' )7 Bettenhausen
/AfD L
02 { 93 02/,'//93 02//8 93 OFFICIAL RECORD COPY G:0YSSIM.MTG j
I w
ENCLOSUR21 OYSTER CREEK MEETING
SUMMARY
JANUARY 26,1993
1.0 INTRODUCTION
.i On January 26,1993, at the NRC Region I Office, the below listed personnel participated in a meeting to discuss incorporation of the Oyster Creek plant specific simulator into the training programs.
t 2.0 MEETING ATTENDEES General Public Utilities Nuclear Corporation l
G. Cropper, Operator Training Manager R. Davidson, Simulator Manager G. Giangi, Training and Education Director i
M. Heller, Licensing J. Kowalski, Manager Plant Training 1
C. Mascan, Vice President / Director Nuclear Assurance P. Scallon, Manager Plant Operations U. S. Nuclear Regulatory Commission R. Conte, Chief BWR Section i
A. Dromerick, Sr. Project Manager N. Hunemuller, Reactor Engineer, NRR i
L. Vick, Reactor Engineer, NRR T. Walker, Sr. Operations Engineer j
3.0 LICENSEE PRESENTATION The Oyster Creek Simulator Manager discussed the details of the preparation of the simulator, including testing and certification. The Oyster Creek Operator Training Manager j
discussed the preparation of the instructors, training and examination materials, operators, operations management, and training management associated with the plant specific simulator. The licensee's presentation is included as Attachment 1.
The Manager of Plant Training and the Manager of Plant Operations answered the NRC's questions concerning the licensee's request for a schedular exemption from requalification testing requirements.
1 I
i i
m
._--.._--m m..
.,_......m.m.-
...-m mmm m
...-m.
PRESENTATION TO THE N.R.C.
h INCORPORATION OF OYSTER CREEK SIMULATOR INTO EXISTING TRAINING PROGRAMS
}
e
( PAST, PRESENT & FUTURE ACTIVITIES )
4 KING OF PR USSIA, PENNA.
R l
JANUARY 26,1993
I E I. SIMULATOR PREPARATION II. INSTRUCTOR PREPARATION III. TRAINING /EXA:M MATERIALS PREPARATION IV. OPERATOR PREPARATION 5
V. ' OPERATIONS MANAGE: MENT PREPARATION VI. TRAINING MANAGEMENT PREPARATION VII. ? REGULATORS / OVERSIGHT GROUPS VIII. IMPORTANT INTERFACES - 1993 1
1
]
~
L SIMULATOR PREPARATION
- OPERATORS & STAS PARTICIPATED IN EA.T TO PROVIDE INPUT INTO MODEL RESPONSES
- PROCESS COMPUTER ENGINEERS STATIONED AT MONROEVILLE FOR 47 MONTHS TO SUPPORT THE PROJECT & PREPARE FOR SIMULATOR OPERATION AT THE PLANT SITE
- EXTENSIVE TEST PLAN UTILIZED TO MEETBOTH EA.T & CERTIFICATION REQUIREMENTS ( = 510 TESTPROCEDURES)
CERTIFICATION PROCESS
- CORE ENGINEERING PERSONNEL CONSULTED ON CORE /NSSS MODELS &
UTILIZED AT MONROEVILLE TO EVALUATE THE MODEL RESPONSES
- SIMULATOR DESIGNED WITH SOPHISTICATED ENGINEERING MODELS FOR REALISTIC TRANSIENT RESPONSE
- SIMULATO.R WAS CERTIFIED ON 12/31/92, SUPPLEMENTAL TRANSMITTAL PROJECTED BY END OF FEBR UARY
- PROCEDURES, PLANS, BUDGET & DEVELOPMENTAL SYSTEM IN PLACE TO SUPPORT SIMULATOR MODIFICATION PROCESS
+
6 T
II. INSTRUCTOR PREPARATION a
- INPO ADVANCED SIMULATOR INSTRUCTOR COURSE ATTENDED BY FOUR SIMULATOR & ONE CLASSROOM INSTRUCTORS
- OYSTER CREEK SPECIFIC SIMULATOR EVALUATION / CRITIQUING COURSE PRESENTED TO ALLINSTRUCTORS
- SIMULATOR INSTR UCTOR QUALIFICATION PROCEDURE APPROVED SINCE 1991 (SIMILAR TO TM.I.s)
- INPO'S DOCUMENT ( E&A SIMULATOR OBSERVATIONS AT G.E. BWRs 1988-1990) PRESENTED TO ALL INSTR UCTORS & CREWS OPERATIONS / TRAINING PERSONNEL VISITED OTHER PLANTS TO OBSERVE SIMULATOR TRAINING & CRITIQUING TECHNIQUES 1
- PILGRIM
- T M.I.
- PERRY
- SUSQUEHANNA.
l
- LIMERICK
- N.M.R #1
- CLINTON m
- l STRENGTHENED SIMULATOR STAFF WITH EXPERIENCED SROs FROM LILCO
& DAEC & PLT OPERATIONS
I I I III. TRAINING / EXAM MATERIALS PREPARATION
~
l
- PAST EXAMS & E&A RESULTS EVALUATED FOR INCLUSION INTO CURRENT REQUAL TWO-YEAR CYCLE
- PRIORITIZED SIMULATOR REQUAL TRAINING CONTENT FOR 1993 IN FINAL STAGES OF DEVELOPMENT ( 1/31/93 )
- COMPENSATORY TRAINING COMPLETED IN B.RT, CLASSROOM & PLANT SETTINGS TO PREPARE OPERATORS FOR TRAINING ON THE SITE SPECIFIC SIMULATOR
- PAST TWO YEARS, TWO EXPERIENCED SRO CONTRACTORS SUPPORTED SIMULATOR DEVELOPMENT & INITIAL PROGRAM ADMINISTRATION
- OPERATIONS / TRAINING COMMITTEES FORMED TO :
- ADDRESS EXPECTED OPERATOR ACTIONS FOR TRANSIENTS
- REVIEW O.C. & INDUSTRY EVENTS FOR APPLICABILITY &
TRAINING EFFECTIVENESS
- G.S.S. PROGRAM HAS DESIGN BASIS MODULE WHICH WILL BE
=
INCORI~DRATED INTO REQUAL PROGRAM AS ADVANCED
=
TECHNICAL TRAINING FOR CROs & EOs
I I I I a
~
IV OPERATOR PREPARATION
~
- . WORK PERFORMANCE STANDARDS DEVELOPED & TRAINING CONDUCTED'
~
FOR:
SBEOP ROLES, RESPONSIBILITIES & ACTIONS LOGKEEPING & TOURS COMMUNICATION TECHNIQUES
- REFRESHER TRA!NING CONDUCTED ON SELF CHECKING AND INITIAL TRAINING PRESENTED ON CREW SELF-CHECKING o
- lJPM TRAINING FOCUSEDION TASKS THAT COULDN'TBE DONE'ATN.M.R &
TASKS MORE SUITED TO BE PERFORMED ON THE SIMULATOR IN 1993 4-
- OPERATORS WERE ORIENTED & TRAINED BYEXPOSURE TO THE.
' SIMULATOR DURING EA.T
- FEEDBACKFROM OPERATORS VIA THE OPSICONCERNPROGRAM HAVE; IMPR O VED MA NY PR OCED URES :D URING LOR ' TRAINING:
xr'
. +
y.
s -',
Y I E
--tm,y,,-w,-w,me,v,,wa--
,,-,. E Iw3--y.cw.w.-,,-w, m.
,-w ir, v,wwes,--,-e-
,,.,v-www-*,.,,,..w w w.- e e w,,
y
+
~,<en+=
- <,we w e w s,,,,,w n e-. w +w e,...r-r.e,,w-se,,w,.w,vw-vwv.w~,..
-eww-.-i.<.-v'.ww,+--v,.'-,--ma-w.,
.-w--,
...,_,w,
V OPERATIONS MGMT PREPARATION
- OPERATION MANAGEMENT PARTICIPATED IN ADMINISTRATION OF SIMULATOR TRAINING ATN.M.R #1
- SENIOR SITE MANAGEMENT ACTIVE IN OBSERVING CREW PERFORMANCE AT N.M.R#1
- MGR. PLANT OPERATIONS, O.TC. & SELECTED G.S.S.s/G.O.S.s ATTENDED SIMULATOR EVALUATION / CRITIQUING COURSE
- OPERATIONS DEPT CONTRACTED G.RC. TO CONDUCT AN INDEPENDENT EOP AUDIT & VERIFICATION
- OPERATIONS TRAINING COORDINATOR PARTICIPATES IN MANTG &
NRC MEETINGS
~
- MGR. PLANT OPS. MADE TRIPS TO MONROEVILLE TO BE ACTIVELY INVOLVED DURING CREW PERFORMANCE ASSESSMENT I I E E 4
m
-.-~.
.z,
E &
I L VI. TRAINING MGMT PREPARATION
- TRAINING MANAGEMENT ACTIVE IN OBSERVING / EVALUATING CREWS AT N.fa.R #1
- ACTIVELY PARTICIPATED IN PAST NRC lvATIONAL & REGIONAL REQUAL EXAM MEETINGS
- TRAINING MANAGEMENT MADE FREQUENT TRIPS TO MONROEVILLE TO BE ACTIVELYINVOLVED DURING SIMULATOR DEVELOPMENT &
CREW ASSESSMENT
- ACTIVE PARTICIPATKONIN MANTG & NETA TRAINING COMMITTEE MEETINGS
^ G.RC. CONSULTED ON THE APPROACH TO SIMULATOR INTRODUCTION INTO TRAINING PROGRAMS
- CONFERRED WITH OTHER PLANTS TO LEARN FROM NRC REQUAL EXPERIENCES
- CURRENTLY REVIEWING INPO PACKAGE FOR APPLICABILITY TO SIMULATOR SCENARIO DEVELOPMENT
- LESSONS LEARNED LIST FROM OTHER PLANTS WITH CONTACTS
~
~
- REPORTS ON SIMULATOR OBSERVATIONS
- O.C. N.PR.D.S.
" ~ ~ ~ ~ ~ ~
illi
VIL REGULATORS / OVERSIGHT GROUPS
- CONSULTED WITH NRC ON KEYINDUSTRYISSUES & REQUAL EXAM MATERIALS AS PART OF THE REQUAL PROCESS
- CONTINUE TO SUPPORT THE INFO E&A PEER EVALUATION PROGRAM
- HATCH
- N.M.R #1
- N.M.R #2
- PILGRIM
- SUSQUEHANNA
- COMMITTED TO MAINTAIN OPEN LINES OF COMMUNICATIONS WITH REGULATORS & OVERSIGHT GROUPS IN THE FUTURE 1.
1 VIIL IMPORTANT INTERFACES - 1993 t
1 INPO SIMULATOR ASSIST VISIT -APRIL '93 I
4 NRC EOP AUDIT-JUNE / JULY '93 l
w INPO E&A VISIT-JUNE / JULY '93 i
NRC REQUAL EXAM-AUG '93 INPO ADVANCED SIMULATOR INSTR UCTOR COURSE - FUTURE L
k.
_